Directory of Power Plants in Wisconsin
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Dane County Airport Solar | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Nov 2020 | Dec 2023 | Solar |
Hermsdorf Solar | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.4 GWh | Feb 2022 | Dec 2023 | Solar |
Nine Springs | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 65.0 MWh | Nov 1964 | Dec 2023 | Natural Gas |
Fitchburg | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 17.0 MWh | Apr 1973 | Dec 2023 | Natural Gas |
West Campus Cogeneration Facility | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 353.0 GWh | Mar 2005 | Dec 2023 | Natural Gas |
Diesel Generators | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 495.0 MWh | May 2001 | Jan 2025 | Distillate Fuel Oil |
Sycamore (WI) | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 229.0 MWh | Nov 1967 | Dec 2023 | Natural Gas |
Manitowoc | Manitowoc Public Utilities | Manitowoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 136.5 GWh | May 1955 | Jan 2025 | Wood/Wood Waste Solids : 97.3% Petroleum Coke : 1.2% Bituminous Coal : 1.0% |
Custer Energy Center | Manitowoc Public Utilities | Manitowoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | May 1999 | Dec 2023 | Natural Gas |
Park Mill | Eagle Creek Renewable Energy, LLC | Marinette, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Dec 1919 | Dec 2023 | Water |
Marshfield Utilities Gas Plant | City of Marshfield - (WI) | Marshfield, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | May 2011 | Dec 2023 | Natural Gas |
Elroy Solar | Butter Solar, LLC | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Aug 2019 | Dec 2023 | Solar |
Lemonweir (Oak 1) | Greenbacker Renewable Energy Corporation | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2023 | Dec 2023 | Solar |
Butler Ridge | Butler Ridge Wind Energy Center | Mayville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 144.3 GWh | Jan 2009 | Jan 2025 | Wind |
Medford DPC Solar | SoCore Energy LLC | Medford, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jan 2017 | Jan 2025 | Solar |
Harley-Davison Powertrain Operations | Wisconsin Electric Power Co | Menomonee Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Sep 2020 | Dec 2023 | Solar |
Downsville DPC Solar | SoCore Energy LLC | Menomonee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2017 | Jan 2025 | Solar |
Cedar Falls (WI) | Northern States Power Co - Minnesota | Menomonie, WI | Midcontinent Independent System Operator, Inc. (MISO) | 33.1 GWh | Dec 1909 | Dec 2023 | Water |
Menomonie | Northern States Power Co - Minnesota | Menomonie, WI | Midcontinent Independent System Operator, Inc. (MISO) | 24.2 GWh | Dec 1957 | Dec 2023 | Water |
Merrill | Wisconsin Public Service Corp | Merrill, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Feb 1917 | Dec 2023 | Water |
Alexander | Wisconsin Public Service Corp | Merrill, WI | Midcontinent Independent System Operator, Inc. (MISO) | 19.0 GWh | Dec 1924 | Dec 2023 | Water |
Strobus | Greenbacker Renewable Energy Corporation | Merrillan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Aug 2021 | Dec 2023 | Solar |
Middleton Airport Solar | Madison Gas & Electric Co | Middleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Jun 2020 | Dec 2023 | Solar |
Middleton Biogas Solar, LLC | Middleton Biogas Solar, LLC | Middleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Apr 2022 | Dec 2023 | Solar |
City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2021 | Dec 2023 | Solar |
Valley (WI) | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 436.4 GWh | May 1968 | Jan 2025 | Natural Gas |
MMSD Jones Island Wastewater | Milwaukee Metro Sewerage Dist | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 54.7 GWh | Dec 1970 | Jan 2025 | Natural Gas : 84.8% Landfill Gas : 15.1% |
Montfort Wind Energy Center | Wisconsin Electric Power Co | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 60.2 GWh | May 2002 | Jan 2025 | Wind |
Red Barn Energy | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 276.2 GWh | Mar 2023 | Jan 2025 | Wind |
Badger Hollow I | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 201.2 GWh | Oct 2021 | Jan 2025 | Solar |
Mosinee Mill | Ahlstrom-Munksjo NA Specialty Solutions, LLC | Mosinee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 122.9 GWh | Jun 1916 | Jan 2025 | Black Liquor : 37.6% Bituminous Coal : 34.0% Water : 17.1% Wood/Wood Waste Solids : 4.2% Residual Fuel Oil : 3.7% Natural Gas : 2.0% Sludge Waste : 1.6% |
Mt. Hope DPC Solar | SoCore Energy LLC | Mt. Hope, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2016 | Jan 2025 | Solar |
Petenwell | Wisconsin River Power Company | Necedah, WI | Midcontinent Independent System Operator, Inc. (MISO) | 95.5 GWh | Jul 1949 | Dec 2023 | Water |
Alliant Energy Neenah | Wisconsin Power & Light Co | Neenah, WI | Midcontinent Independent System Operator, Inc. (MISO) | 610.1 GWh | Apr 2000 | Dec 2023 | Natural Gas |
Georgia-Pacific Corp - Nekoosa Mill | Domtar Industries Inc | Nekoosa, WI | Midcontinent Independent System Operator, Inc. (MISO) | 193.7 GWh | Dec 1911 | Jan 2025 | Black Liquor : 43.3% Natural Gas : 42.8% Water : 13.8% |
Wood County | Wisconsin Power & Light Co | Nekoosa, WI | Midcontinent Independent System Operator, Inc. (MISO) | 276.1 GWh | Nov 2022 | Jan 2025 | Solar |
New Auburn DPC Solar | SoCore Energy LLC | New Auburn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Dec 2017 | Jan 2025 | Solar |
New Lisbon | City of New Lisbon | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Dec 1965 | Dec 2023 | Distillate Fuel Oil |
Whistling Winds DPC Solar | SoCore Energy LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | May 2017 | Jan 2025 | Solar |
New Lisbon Solar | Butter Solar, LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Aug 2019 | Dec 2023 | Solar |
Webster Creek (Oak 2) | Greenbacker Renewable Energy Corporation | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 MWh | Nov 2023 | Dec 2023 | Solar |
Little Quinnesec Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Niagara, WI | Midcontinent Independent System Operator, Inc. (MISO) | 58.9 GWh | Nov 1900 | Dec 2023 | Water |
Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 TWh | Jan 2010 | Jan 2025 | Subbituminous Coal : 71.8% Bituminous Coal : 17.5% Natural Gas : 10.7% |
MMSD South Shore Wastewater | Milwaukee Metro Sewerage Dist | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.2 GWh | Jul 2000 | Dec 2023 | Other Biomass Gas : 76.4% Natural Gas : 23.6% |
South Oak Creek | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 TWh | Nov 1959 | Jan 2025 | Subbituminous Coal : 99.6% |
IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2018 | Dec 2023 | Solar |
Stiles | Oconto Electric Cooperative | Oconto Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Feb 1949 | Dec 2023 | Water |
Oconto Falls Lower | Eagle Creek Renewable Energy, LLC | Oconto Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 1970 | Dec 2023 | Water |
Oconto Falls Upper | Eagle Creek Renewable Energy, LLC | Oconto Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Dec 1917 | Dec 2023 | Water |
Onalaska Campus Landfill Biogas | Gundersen Lutheran Biogas I LLC | Onalaska, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Feb 2012 | Dec 2023 | Landfill Gas |
Winnebago County Landfill Gas | Winnebago County | Oshkosh, WI | Midcontinent Independent System Operator, Inc. (MISO) | 11.4 GWh | Jan 2000 | Dec 2023 | Landfill Gas |
Columbia (WI) | Wisconsin Power & Light Co | Pardeville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 TWh | Apr 1975 | Jan 2025 | Subbituminous Coal : 99.9% |
Flambeau Crowley Rapids Project | Renewable World Energies LLC | Park Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Dec 1929 | Dec 2023 | Water |
Flambeau Lower Project | Renewable World Energies LLC | Park Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Dec 1922 | Dec 2023 | Water |
West Marinette | Wisconsin Public Service Corp | Peshtigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 93.8 GWh | May 1971 | Dec 2023 | Natural Gas |
West Marinette 34 | Madison Gas & Electric Co | Peshtigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 82.9 GWh | May 2000 | Dec 2023 | Natural Gas |
Lannon Stone | Wisconsin Electric Power Co | Pewaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Nov 2021 | Dec 2023 | Solar |
Flambeau Solar Partners | Flambeau Solar Partners, LLC | Phillips, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Apr 2017 | Dec 2023 | Solar |
Port Edwards Mill | Domtar Industries Inc | Port Edwards, WI | Midcontinent Independent System Operator, Inc. (MISO) | 39.4 GWh | Dec 1912 | Jan 2025 | Water |
Port Washington Generating Station | Wisconsin Electric Power Co | Port Washington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 TWh | Jun 2005 | Jan 2025 | Natural Gas |
Prairie Du Sac | Wisconsin Power & Light Co | Prairie du Sac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 131.0 GWh | Sep 1915 | Dec 2023 | Water |
CREE | Wisconsin Electric Power Co | Racine, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2021 | Dec 2023 | Solar |
Arpin Dam | Renewable World Energies LLC | Radisson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Aug 1971 | Dec 2023 | Water |
Rhinelander Mill | Ahlstrom-Munksjo | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Nov 1917 | Jan 2025 | Water |
Hodag Solar | Wisconsin Public Service Corp | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 13.2 GWh | Dec 2021 | Dec 2023 | Solar |
Hat Rapids | Wisconsin Public Service Corp | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | May 1923 | Dec 2023 | Water |
Rice Lake Solar Array | AEP Onsite Partners, LLC | Rice Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | May 2019 | Dec 2023 | Solar |
Richland Center Renewable Energy LLC | Richland Center Renewable Energy LLC | Richland Center, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas |
Warren DPC Solar | SoCore Energy LLC | Roberts, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Apr 2017 | Jan 2025 | Solar |
Weston | Wisconsin Public Service Corp | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 TWh | Nov 1954 | Jan 2025 | Subbituminous Coal : 99.6% |
Domtar Paper Company Rothschild | Domtar Paper Company Rothschild | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Dec 1909 | Dec 2023 | Water |
Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 143.2 GWh | Oct 2013 | Dec 2023 | Wood/Wood Waste Solids : 96.1% Natural Gas : 3.9% |
Saxon Falls | Northern States Power Co - Minnesota | Saxon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Dec 1912 | Dec 2023 | Water |
Onion River | Wisconsin Power & Light Co | Sheboygan Cedar Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 204.3 GWh | Nov 2023 | Jan 2025 | Solar |
Sheboygan Falls | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 546.5 GWh | May 2005 | Dec 2023 | Natural Gas |
Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 TWh | Jun 1951 | Jan 2025 | Subbituminous Coal : 99.9% |
Apple River | Northern States Power Co - Minnesota | Somerset, WI | Midcontinent Independent System Operator, Inc. (MISO) | 11.2 GWh | Dec 1900 | Dec 2023 | Water |
Spooner Solar Array | AEP Onsite Partners, LLC | Spooner, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | May 2019 | Dec 2023 | Solar |
St Croix Falls | Northern States Power Co - Minnesota | St Croix Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 83.1 GWh | Dec 1909 | Dec 2023 | Water |
Stevens Point Mill | Pixelle Specialty Solution, LLC | Stevens Point, WI | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | Jan 2002 | Dec 2023 | Natural Gas |
Stevens Point | Consolidated Water Power Co | Stevens Point, WI | Midcontinent Independent System Operator, Inc. (MISO) | 24.1 GWh | Dec 1917 | Dec 2023 | Water |
Waxdale | S.C. Johnson & Son, Inc. | Sturtevant, WI | Midcontinent Independent System Operator, Inc. (MISO) | 40.1 GWh | Nov 2003 | Jan 2025 | Natural Gas : 43.8% Landfill Gas : 36.1% Wind : 11.7% Solar : 8.4% |
Tomahawk | Wisconsin Public Service Corp | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Dec 1937 | Dec 2023 | Water |
Packaging of America Tomahawk Mill | PCA-Tomahawk Mill | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 112.9 GWh | Dec 1919 | Dec 2023 | Natural Gas : 36.9% Wood/Wood Waste Solids : 34.9% Black Liquor : 15.8% Water : 12.0% |
Potato Rapids | Wisconsin Public Service Corp | Town of Porterfield, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Apr 1921 | Dec 2023 | Water |
Grant County | Wisconsin Power & Light Co | Town of Potosi, WI | Midcontinent Independent System Operator, Inc. (MISO) | 213.0 GWh | - | Jan 2025 | Solar |
Johnson Falls | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.3 GWh | Jun 1923 | Dec 2023 | Water |
High Falls (WI) | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.0 GWh | Jul 1910 | Dec 2023 | Water |
Caldron Falls | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Oct 1924 | Dec 2023 | Water |
Sandstone Rapids | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Dec 1924 | Dec 2023 | Water |
Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Aug 2013 | Dec 2023 | Other Biomass Gas |
Point Beach Solar | Point Beach Solar | Two Creeks, WI | Midcontinent Independent System Operator, Inc. (MISO) | 210.3 GWh | Aug 2021 | Jan 2025 | Solar |
Two Creeks Solar | Wisconsin Public Service Corp | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 204.1 GWh | Oct 2020 | Jan 2025 | Solar |
Point Beach Nuclear Plant | NextEra Energy Point Beach LLC | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.1 TWh | May 1969 | Jan 2025 | Nuclear |
Paris (WI) | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 160.2 GWh | Feb 1995 | Dec 2023 | Natural Gas |
Paris Solar | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.0 GWh | - | Jan 2025 | Solar |
Epic Verona | Epic Hosting, LLC | Verona, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | May 2009 | Dec 2023 | Solar : 91.3% Distillate Fuel Oil : 8.7% |
Viola | Village of Viola - (WI) | Viola, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 MWh | Dec 2001 | Dec 2023 | Distillate Fuel Oil |
Liberty Pole DPC Solar | SoCore Energy LLC | Viroqua, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2017 | Jan 2025 | Solar |
Washington Island | Washington Island El Coop, Inc | Washington Island, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Nov 1945 | Dec 2023 | Distillate Fuel Oil |
Browse Power Plants By Wisconsin Counties
Figures are based on January 2025 generation numbers.County | State Rank | Active Plants | Jan 2025 Generation |
---|---|---|---|
Manitowoc County, WI | # 1 | 7 | 10.7 TWh |
Milwaukee County, WI | # 2 | 11 | 10.4 TWh |
Rock County, WI | # 3 | 15 | 8.5 TWh |
Ozaukee County, WI | # 4 | 1 | 7.4 TWh |
Columbia County, WI | # 5 | 6 | 5.3 TWh |
Outagamie County, WI | # 6 | 15 | 5.1 TWh |
Marathon County, WI | # 7 | 8 | 4.4 TWh |
Sheboygan County, WI | # 8 | 5 | 2.8 TWh |
Jefferson County, WI | # 9 | 7 | 1.1 TWh |
Buffalo County, WI | # 10 | 3 | 915.4 GWh |
Dane County, WI | # 11 | 23 | 879.2 GWh |
Wood County, WI | # 12 | 10 | 769.2 GWh |
Winnebago County, WI | # 13 | 5 | 621.5 GWh |
Grant County, WI | # 14 | 9 | 593.0 GWh |
Dodge County, WI | # 15 | 6 | 586.0 GWh |
Chippewa County, WI | # 16 | 11 | 553.3 GWh |
Fond du Lac County, WI | # 17 | 9 | 528.7 GWh |
Brown County, WI | # 18 | 8 | 521.9 GWh |
Iowa County, WI | # 19 | 3 | 459.9 GWh |
Lafayette County, WI | # 20 | 2 | 407.7 GWh |
Marinette County, WI | # 21 | 10 | 296.6 GWh |
Lincoln County, WI | # 22 | 5 | 223.0 GWh |
Kenosha County, WI | # 23 | 5 | 204.5 GWh |
Waushara County, WI | # 24 | 1 | 180.6 GWh |
Ashland County, WI | # 25 | 2 | 159.9 GWh |
Sauk County, WI | # 26 | 1 | 131.0 GWh |
Rusk County, WI | # 27 | 6 | 124.9 GWh |
Juneau County, WI | # 28 | 9 | 104.4 GWh |
County | State Rank | Active Plants | Jan 2025 Generation |
---|---|---|---|
Richland County, WI | # 29 | 4 | 103.5 GWh |
Washington County, WI | # 30 | 6 | 102.9 GWh |
Portage County, WI | # 31 | 6 | 92.0 GWh |
Polk County, WI | # 32 | 5 | 90.8 GWh |
Adams County, WI | # 33 | 2 | 75.6 GWh |
Florence County, WI | # 34 | 3 | 65.9 GWh |
La Crosse County, WI | # 35 | 2 | 65.4 GWh |
Racine County, WI | # 36 | 5 | 60.3 GWh |
Dunn County, WI | # 37 | 5 | 58.9 GWh |
Eau Claire County, WI | # 38 | 2 | 43.1 GWh |
Oneida County, WI | # 39 | 3 | 24.1 GWh |
Barron County, WI | # 40 | 5 | 17.0 GWh |
St. Croix County, WI | # 41 | 3 | 15.1 GWh |
Kewaunee County, WI | # 42 | 3 | 15.0 GWh |
Jackson County, WI | # 43 | 4 | 13.9 GWh |
Sawyer County, WI | # 44 | 4 | 13.8 GWh |
Monroe County, WI | # 45 | 3 | 13.0 GWh |
Oconto County, WI | # 46 | 3 | 13.0 GWh |
Green Lake County, WI | # 47 | 1 | 11.1 GWh |
Washburn County, WI | # 48 | 3 | 10.8 GWh |
Price County, WI | # 49 | 7 | 10.7 GWh |
Iron County, WI | # 50 | 1 | 9.1 GWh |
Trempealeau County, WI | # 51 | 2 | 8.1 GWh |
Burnett County, WI | # 52 | 4 | 7.5 GWh |
Waukesha County, WI | # 53 | 2 | 6.1 GWh |
Vernon County, WI | # 54 | 5 | 3.4 GWh |
Taylor County, WI | # 55 | 1 | 2.9 GWh |
Door County, WI | # 56 | 1 | 9.0 MWh |