Directory of Power Plants in Virginia
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
North Anna | Virginia Electric & Power Co | Mineral, VA | PJM Interconnection, LLC (PJM) | 14.9 TWh | May 1978 | Jul 2024 | Nuclear |
Surry | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 13.8 TWh | Nov 1972 | Jul 2024 | Nuclear |
Greensville County Power Station | Virginia Electric & Power Co | Emporia, VA | PJM Interconnection, LLC (PJM) | 11.9 TWh | Nov 2018 | Jul 2024 | Natural Gas |
Warren County | Virginia Electric & Power Co | Front Royal, VA | PJM Interconnection, LLC (PJM) | 9.2 TWh | Nov 2014 | Jul 2024 | Natural Gas |
Brunswick County Power Station | Virginia Electric & Power Co | Freeman, VA | PJM Interconnection, LLC (PJM) | 7.9 TWh | Mar 2016 | Jul 2024 | Natural Gas |
Doswell Energy Center | Doswell Ltd Partnership | Ashland, VA | PJM Interconnection, LLC (PJM) | 5.7 TWh | Oct 1991 | Jul 2024 | Natural Gas : 99.9% |
Potomac Energy Center, LLC | Potomac Energy Center LLC | Leesburg, VA | PJM Interconnection, LLC (PJM) | 4.7 TWh | Mar 2017 | Jul 2024 | Natural Gas |
Tenaska Virginia Generating Station | Tenaska Virginia Partners LP | Scottsville, VA | PJM Interconnection, LLC (PJM) | 4.4 TWh | Mar 2004 | Jul 2024 | Natural Gas |
Bear Garden | Virginia Electric & Power Co | New Canton, VA | PJM Interconnection, LLC (PJM) | 3.4 TWh | Apr 2011 | Jul 2024 | Natural Gas : 99.9% |
Chesterfield | Virginia Electric & Power Co | Chester, VA | PJM Interconnection, LLC (PJM) | 2.3 TWh | Nov 1952 | Jul 2024 | Natural Gas : 99.9% |
Possum Point | Virginia Electric & Power Co | Dumfries, VA | PJM Interconnection, LLC (PJM) | 2.0 TWh | May 1955 | Jul 2024 | Natural Gas : 99.9% |
Hopewell Cogeneration | Luminant Generation Company LLC | Hopewell, VA | PJM Interconnection, LLC (PJM) | 1.5 TWh | Dec 1989 | Jul 2024 | Natural Gas : 99.7% |
Gordonsville Energy LP | Virginia Electric & Power Co | Gordonsville, VA | PJM Interconnection, LLC (PJM) | 1.1 TWh | Feb 1994 | Nov 2023 | Natural Gas : 97.4% Distillate Fuel Oil : 2.6% |
Virginia City Hybrid Energy Center | Virginia Electric & Power Co | St. Paul, VA | PJM Interconnection, LLC (PJM) | 885.7 GWh | Jun 2012 | Jul 2024 | Bituminous Coal : 88.0% Wood/Wood Waste Solids : 11.2% Distillate Fuel Oil : 0.9% |
Ladysmith | Virginia Electric & Power Co | Woodford, VA | PJM Interconnection, LLC (PJM) | 761.2 GWh | Apr 2001 | Jul 2024 | Natural Gas : 95.4% Distillate Fuel Oil : 4.6% |
Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 746.0 GWh | Sep 1995 | Jul 2024 | Bituminous Coal : 99.4% Distillate Fuel Oil : 0.6% |
Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | PJM Interconnection, LLC (PJM) | 679.0 GWh | Feb 1990 | Jul 2024 | Non-biogenic Municipal Solid Waste : 54.4% Biogenic Municipal Solid Waste : 44.5% Natural Gas : 1.1% |
Covington Facility | WestRock Corp | Covington, VA | PJM Interconnection, LLC (PJM) | 673.0 GWh | Dec 1950 | Jul 2024 | Black Liquor : 41.8% Natural Gas : 27.6% Wood/Wood Waste Solids : 17.7% Bituminous Coal : 12.1% Residual Fuel Oil : 0.8% |
WestRock-West Point Mill | WestRock-West Point Mill | West Point, VA | PJM Interconnection, LLC (PJM) | 524.1 GWh | Dec 1953 | Jul 2024 | Black Liquor : 43.9% Natural Gas : 36.9% Wood/Wood Waste Solids : 15.0% Bituminous Coal : 2.3% Sludge Waste : 1.7% |
Pleinmont Solar 2 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 458.7 GWh | Jul 2021 | Jul 2024 | Solar |
Remington | Virginia Electric & Power Co | Remington, VA | PJM Interconnection, LLC (PJM) | 365.5 GWh | May 2000 | Nov 2023 | Natural Gas : 97.1% Distillate Fuel Oil : 2.9% |
Skipjack Solar Center | AES Distributed Energy | Wayside, VA | PJM Interconnection, LLC (PJM) | 351.5 GWh | Apr 2022 | Jul 2024 | Solar |
Hopewell Power Station | Virginia Electric & Power Co | Hopewell, VA | PJM Interconnection, LLC (PJM) | 345.0 GWh | Jun 1992 | Dec 2023 | Wood/Wood Waste Solids : 99.9% |
John H Kerr | USCE-Wilmington District | Boydton, VA | PJM Interconnection, LLC (PJM) | 340.0 GWh | Oct 1952 | Dec 2023 | Water |
Southampton Power Station | Virginia Electric & Power Co | Franklin, VA | PJM Interconnection, LLC (PJM) | 340.0 GWh | Feb 1992 | Dec 2023 | Wood/Wood Waste Solids : 99.8% |
Buchanan Generation LLC | Buchanan Generation, LLC | Keen Mountain, VA | PJM Interconnection, LLC (PJM) | 329.2 GWh | May 2002 | Jun 2023 | Natural Gas |
Fort Powhatan Solar | Dominion Renewable Energy | Disputanta, VA | PJM Interconnection, LLC (PJM) | 317.7 GWh | Dec 2021 | Jul 2024 | Solar |
Highlander Solar Energy Station 1 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 303.1 GWh | Nov 2020 | Jul 2024 | Solar |
Halifax County Biomass | South Boston Energy LLC | South Boston, VA | PJM Interconnection, LLC (PJM) | 298.4 GWh | Oct 2013 | Dec 2023 | Wood/Wood Waste Solids |
Hopewell Mill | RockTenn-Hopewell | Hopewell, VA | PJM Interconnection, LLC (PJM) | 284.8 GWh | Nov 1980 | Jul 2024 | Black Liquor : 45.0% Wood/Wood Waste Solids : 30.6% Natural Gas : 23.9% |
Altavista Power Station | Virginia Electric & Power Co | Altavista, VA | PJM Interconnection, LLC (PJM) | 283.2 GWh | Jan 1992 | Dec 2023 | Wood/Wood Waste Solids : 99.6% |
Colonial Trail West | Dominion Energy Inc. | Spring Grove, VA | PJM Interconnection, LLC (PJM) | 277.9 GWh | Nov 2019 | Jul 2024 | Solar |
International Paper Franklin Mill | International Paper | Franklin, VA | PJM Interconnection, LLC (PJM) | 247.5 GWh | Oct 1977 | Jul 2024 | Black Liquor : 78.5% Natural Gas : 21.5% |
Louisa Generation Facility | Old Dominion Electric Coop | Gordonsville, VA | PJM Interconnection, LLC (PJM) | 236.9 GWh | Jul 2003 | Dec 2023 | Natural Gas : 99.7% |
Marsh Run Generation Facility | Old Dominion Electric Coop | Remington, VA | PJM Interconnection, LLC (PJM) | 215.4 GWh | Aug 2004 | Dec 2023 | Natural Gas : 99.6% |
Claytor | Appalachian Power Co | Radford, VA | PJM Interconnection, LLC (PJM) | 197.8 GWh | Jul 1939 | Dec 2023 | Water |
Water Strider Solar | Consolidated Edison Development Inc. | Nathalie, VA | PJM Interconnection, LLC (PJM) | 183.7 GWh | Feb 2021 | Jul 2024 | Solar |
Sadler Solar | Dominion Energy Inc. | Emporia, VA | PJM Interconnection, LLC (PJM) | 173.1 GWh | Jun 2021 | Jul 2024 | Solar |
Altavista Solar | Altavista Solar, LLC | Lynch Station, VA | PJM Interconnection, LLC (PJM) | 171.3 GWh | May 2021 | Jul 2024 | Solar |
Maplewood Solar | Dominion Renewable Energy | Climax, VA | PJM Interconnection, LLC (PJM) | 168.1 GWh | Nov 2022 | Jul 2024 | Solar |
Celanese Acetate LLC | Celanese Acetate LLC | Narrows, VA | PJM Interconnection, LLC (PJM) | 165.8 GWh | Dec 1941 | Jul 2024 | Natural Gas |
Smith Mountain | Appalachian Power Co | Penhook, VA | PJM Interconnection, LLC (PJM) | 161.7 GWh | Nov 1965 | Jul 2024 | Water |
Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 157.0 GWh | Aug 1958 | Jul 2024 | Natural Gas |
Powells Creek Solar - Hybrid | Powells Creek Farm Solar, LLC | Alton, VA | PJM Interconnection, LLC (PJM) | 150.8 GWh | Jul 2023 | Jul 2024 | Solar |
Spring Grove I | Dominion Energy Inc. | Spring Grove, VA | PJM Interconnection, LLC (PJM) | 148.4 GWh | Oct 2020 | Jul 2024 | Solar |
Pleinmont Solar 1 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 144.0 GWh | Sep 2020 | Jul 2024 | Solar |
Darbytown | Virginia Electric & Power Co | Richmond, VA | PJM Interconnection, LLC (PJM) | 143.5 GWh | Mar 1990 | Nov 2023 | Natural Gas : 88.9% Distillate Fuel Oil : 11.1% |
Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | PJM Interconnection, LLC (PJM) | 140.9 GWh | Sep 1987 | Jul 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Chesapeake Solar Project | Chesapeake Solar Project, LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 137.4 GWh | Nov 2023 | Jul 2024 | Solar |
Greensville County Solar Project, LLC | Dominion Energy Inc. | Skippers, VA | PJM Interconnection, LLC (PJM) | 133.3 GWh | Nov 2020 | Jul 2024 | Solar |
Grasshopper Solar | Dominion Energy Inc. | Chase City, VA | PJM Interconnection, LLC (PJM) | 131.2 GWh | Aug 2020 | Jul 2024 | Solar |
Eastern Shore Solar, LLC | Dominion Renewable Energy | Oak Hall, VA | PJM Interconnection, LLC (PJM) | 129.8 GWh | Sep 2016 | Jul 2024 | Solar |
Waverly Solar, LLC | Waverly Solar, LLC | Waverly, VA | PJM Interconnection, LLC (PJM) | 116.7 GWh | Nov 2023 | Jul 2024 | Solar |
Elizabeth River Power Station | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 109.2 GWh | May 1992 | Dec 2023 | Natural Gas : 97.9% Distillate Fuel Oil : 2.1% |
Bedford Solar | Dominion Renewable Energy | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 108.7 GWh | Oct 2021 | Jul 2024 | Solar |
Southampton Solar, LLC | Dominion Renewable Energy | Newsoms, VA | PJM Interconnection, LLC (PJM) | 105.6 GWh | Oct 2017 | Jul 2024 | Solar |
HP Hood CT | HP Hood LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 103.6 GWh | May 2015 | Jul 2024 | Natural Gas |
Desper Solar | Dominion Renewable Energy | Louisa, VA | PJM Interconnection, LLC (PJM) | 102.9 GWh | Nov 2021 | Jul 2024 | Solar |
Meherrin Solar | Dominion Renewable Energy | Skippers, VA | PJM Interconnection, LLC (PJM) | 100.7 GWh | Aug 2022 | Jul 2024 | Solar |
Sycamore Solar | Dominion Energy Inc. | Gretna, VA | PJM Interconnection, LLC (PJM) | 89.5 GWh | Feb 2023 | Jul 2024 | Solar |
Gravel Neck | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 89.3 GWh | Jul 1970 | Dec 2023 | Natural Gas : 95.9% Distillate Fuel Oil : 4.1% |
Sunnybrook Solar Project - Hybrid | Sunnybrook Farm Solar, LLC | Scottsburg, VA | PJM Interconnection, LLC (PJM) | 88.0 GWh | Nov 2022 | Jul 2024 | Solar |
Piney Creek Solar | Dominion Energy Inc. | Clover, VA | PJM Interconnection, LLC (PJM) | 84.8 GWh | Jul 2023 | Jul 2024 | Solar |
Waste Management King George LFGTE | WM Renewable Energy LLC | King George, VA | PJM Interconnection, LLC (PJM) | 81.3 GWh | Apr 2010 | Jul 2024 | Landfill Gas |
Crystal Hill Solar | Urban Grid Solar | Crystal Hill, VA | PJM Interconnection, LLC (PJM) | 80.8 GWh | Nov 2023 | Jul 2024 | Solar |
Wolf Hills Energy | Middle River Power II, LLC | Bristol, VA | PJM Interconnection, LLC (PJM) | 77.1 GWh | Apr 2001 | Dec 2023 | Natural Gas |
Whitehorn Solar | Whitehorn Solar, LLC | Gretna, VA | PJM Interconnection, LLC (PJM) | 74.6 GWh | Sep 2021 | Jul 2024 | Solar |
Caden Energix Axton LLC | Caden Energix Axton LLC | Axton, VA | PJM Interconnection, LLC (PJM) | 71.9 GWh | Nov 2023 | Jul 2024 | Solar |
Bluestone Solar | Bluestone Farm Solar, LLC | Chase City, VA | PJM Interconnection, LLC (PJM) | 64.9 GWh | Apr 2021 | Jul 2024 | Solar |
Foxhound | Foxhound Solar, LLC | Clover, VA | PJM Interconnection, LLC (PJM) | 63.8 GWh | - | Jul 2024 | Solar |
Cavalier Solar | AES Clean Energy | Smithfield, VA | PJM Interconnection, LLC (PJM) | 63.0 GWh | - | Jul 2024 | Solar |
Caden Energix Hickory LLC | Caden Energix Hickory LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 57.7 GWh | Jul 2020 | Jul 2024 | Solar |
Spruance Operating Services LLC | Veolia Energy Operating Service | Richmond, VA | PJM Interconnection, LLC (PJM) | 56.7 GWh | Apr 1992 | Jul 2024 | Natural Gas |
Charles City | Industrial Power Generating Company LLC | Providence Forge, VA | PJM Interconnection, LLC (PJM) | 54.0 GWh | Oct 2003 | Dec 2023 | Landfill Gas : 94.0% Distillate Fuel Oil : 6.0% |
Georgia-Pacific Big Island | GP Big Island LLC | Big Island, VA | PJM Interconnection, LLC (PJM) | 53.8 GWh | May 1920 | Jul 2024 | Natural Gas : 62.3% Wood/Wood Waste Solids : 24.6% Black Liquor : 9.3% Other Biomass Solids : 3.5% |
King & Queen | Industrial Power Generating Company LLC | Little Plymouth, VA | PJM Interconnection, LLC (PJM) | 53.8 GWh | Dec 2007 | Dec 2023 | Landfill Gas : 95.2% Distillate Fuel Oil : 4.8% |
Mechanicsville Solar | Mechanicsville Solar, LLC | Mechanicsville, VA | PJM Interconnection, LLC (PJM) | 53.7 GWh | Aug 2020 | Jul 2024 | Solar |
Waste Management Middle Peninsula LFGTE | WM Renewable Energy LLC | Glenns, VA | PJM Interconnection, LLC (PJM) | 50.0 GWh | Aug 2009 | Dec 2023 | Landfill Gas |
Whitehouse Solar Farm | Virginia Electric & Power Co | Louisa, VA | PJM Interconnection, LLC (PJM) | 49.0 GWh | Nov 2016 | Dec 2023 | Solar |
Coastal Virginia Offshore Wind (CVOW) Pilot Project | Virginia Electric & Power Co | Virginia Beach, VA | PJM Interconnection, LLC (PJM) | 47.2 GWh | Dec 2020 | Jul 2024 | Wind |
Westmoreland County Solar Project | Westmoreland County Solar Project, LLC | WARSAW, VA | PJM Interconnection, LLC (PJM) | 47.2 GWh | Sep 2021 | Dec 2023 | Solar |
Leesville | Appalachian Power Co | Hurt, VA | PJM Interconnection, LLC (PJM) | 46.7 GWh | Jan 1964 | Dec 2023 | Water |
Brunswick Landfill Gas | Industrial Power Generating Company LLC | Lawrenceville, VA | PJM Interconnection, LLC (PJM) | 45.1 GWh | Sep 2007 | Dec 2023 | Landfill Gas : 94.8% Distillate Fuel Oil : 5.2% |
MM Prince William Energy | MM Prince William Energy LLC | Manassas, VA | PJM Interconnection, LLC (PJM) | 43.1 GWh | Oct 1998 | Dec 2023 | Landfill Gas |
Briel Solar Farm | Briel Solar Farm, LLC | Standston, VA | PJM Interconnection, LLC (PJM) | 41.8 GWh | Jul 2021 | Dec 2023 | Solar |
Grassfield Solar | Dominion Energy Inc. | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 41.0 GWh | Sep 2022 | Dec 2023 | Solar |
Energix Leatherwood, LLC | Energix Leatherwood, LLC | Axton, VA | PJM Interconnection, LLC (PJM) | 40.3 GWh | Jul 2021 | Dec 2023 | Solar |
Energix Buckingham, LLC | Energix Buckingham, LLC | Cumberland, VA | PJM Interconnection, LLC (PJM) | 39.8 GWh | Jun 2021 | Dec 2023 | Solar |
Buck Hydro | Appalachian Power Co | Ivanhoe, VA | PJM Interconnection, LLC (PJM) | 38.5 GWh | Dec 1911 | Dec 2023 | Water |
Richmond Spider Solar | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 38.2 GWh | Nov 2020 | Dec 2023 | Solar |
Sussex Drive, LLC | Dominion Renewable Energy | Stoney Creek, VA | PJM Interconnection, LLC (PJM) | 38.2 GWh | Oct 2017 | Dec 2023 | Solar |
Caden Energix Wytheville LLC | Caden Energix Wytheville LLC | Wytheville, VA | PJM Interconnection, LLC (PJM) | 37.8 GWh | May 2022 | Dec 2023 | Solar |
Gloucester Solar | Dominion Energy Inc. | Gloucester, VA | PJM Interconnection, LLC (PJM) | 37.5 GWh | Mar 2019 | Dec 2023 | Solar |
Waste Management Bethel LFGTE | WM Renewable Energy LLC | Hampton, VA | PJM Interconnection, LLC (PJM) | 37.4 GWh | Jan 2008 | Dec 2023 | Landfill Gas |
Energix Nokesville, LLC | Energix Nokesville, LLC | Nokesville, VA | PJM Interconnection, LLC (PJM) | 37.3 GWh | Oct 2022 | Dec 2023 | Solar |
Scott-II Solar LLC | Dominion Renewable Energy | Powhatan, VA | PJM Interconnection, LLC (PJM) | 35.9 GWh | Nov 2017 | Dec 2023 | Solar |
Wheelabrator Portsmouth | Wheelabrator Environmental Systems | Portsmouth, VA | PJM Interconnection, LLC (PJM) | 35.6 GWh | Jan 1987 | Jul 2024 | Distillate Fuel Oil : 46.5% Non-biogenic Municipal Solid Waste : 29.4% Biogenic Municipal Solid Waste : 24.1% |
Essex Solar Center | Arevon Energy, Inc. | Dunnsville, VA | PJM Interconnection, LLC (PJM) | 35.3 GWh | Nov 2017 | Jul 2024 | Solar |
Montross Solar | Dominion Energy Inc. | Montross, VA | PJM Interconnection, LLC (PJM) | 34.6 GWh | Nov 2018 | Dec 2023 | Solar |
Watlington Solar | Consolidated Edison Development Inc. | Halifax, VA | PJM Interconnection, LLC (PJM) | 34.6 GWh | Feb 2023 | Dec 2023 | Solar |