Directory of Power Plants in Utah
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Causey | Weber Basin Water Conserv Dist | South Fork, UT | PacifiCorp East (PACE) | 5.5 GWh | Dec 1997 | Dec 2023 | Water |
Wanship | Weber Basin Water Conserv Dist | Wanship, UT | PacifiCorp East (PACE) | 12.3 GWh | Jul 1958 | Dec 2023 | Water |
Gateway | Weber Basin Water Conserv Dist | Mountain Green, UT | PacifiCorp East (PACE) | 15.9 GWh | Jul 1958 | Dec 2023 | Water |
Quail Creek Hydro Plant #1 | Washington Cnty Wtr Consv Dist | Hurricane, UT | PacifiCorp East (PACE) | 10.8 GWh | May 1985 | Aug 2024 | Water |
Salt Palace Solar Gen Plant | Wasatch View Solar LLC | Salt Lake City, UT | PacifiCorp East (PACE) | 2.0 GWh | Apr 2012 | Dec 2023 | Solar |
Central Energy Plant USU | Utah State University | Logan, UT | PacifiCorp East (PACE) | 31.3 GWh | Jul 2004 | Aug 2024 | Natural Gas |
Spanish Fork Community Solar | Utah Municipal Power Agency | Spanish Fork, UT | PacifiCorp East (PACE) | 7.2 GWh | Jun 2021 | Dec 2023 | Solar |
West Valley Generation Project | Utah Municipal Power Agency | West Valley City, UT | PacifiCorp East (PACE) | 960.3 GWh | Sep 2001 | Aug 2024 | Natural Gas |
Provo Power Plant | Utah Municipal Power Agency | Provo, UT | PacifiCorp East (PACE) | 7.1 GWh | Dec 2017 | Dec 2023 | Natural Gas |
Nebo Power Station | Utah Associated Mun Power Sys | Payson, UT | PacifiCorp East (PACE) | 823.4 GWh | May 2004 | Aug 2024 | Natural Gas |
Veyo Heat Recovery Project | Utah Associated Mun Power Sys | Gunlock, UT | PacifiCorp East (PACE) | 45.8 GWh | Apr 2016 | Dec 2023 | Waste Heat |
US Magnesium | US Magnesium | Rowley, UT | PacifiCorp East (PACE) | 107.8 MWh | Dec 1971 | Jun 2024 | Natural Gas |
Deer Creek (UT) | U S Bureau of Reclamation | Heber, UT | Western Area Power Administration - Upper Great Plains West (WAUW) | 23.4 GWh | Jan 1958 | Dec 2023 | Water |
Flaming Gorge | U S Bureau of Reclamation | Dutch John, UT | Western Area Power Administration - Upper Great Plains West (WAUW) | 413.6 GWh | Oct 1963 | Dec 2023 | Water |
Tooele Army Depot(CSG) | Tooele Army Depot | Tooele, UT | PacifiCorp East (PACE) | 2.8 GWh | Jun 2010 | Jul 2023 | Wind : 98.7% Solar : 1.3% |
Three Peaks Power | Three Peaks Power LLC | Cedar City, UT | PacifiCorp East (PACE) | 186.9 GWh | Nov 2016 | Aug 2024 | Solar |
Thermo No 1 | Thermo No 1 BE 01 LLC | Milford, UT | PacifiCorp East (PACE) | 54.8 GWh | Mar 2013 | Dec 2023 | Geothermal |
HTW Plant 303 COGEN | The University of Utah | Salt Lake City, UT | PacifiCorp East (PACE) | 45.7 GWh | Jul 2008 | Aug 2024 | Natural Gas |
Tesoro SLC Cogeneration Plant | Tesoro Refng Marketing Co Mntn Region | Salt Lake City, UT | PacifiCorp East (PACE) | 183.2 GWh | Jun 2004 | Aug 2024 | Natural Gas : 98.7% Other Gas : 1.3% |
Weber State University - Davis Campus PV | Tesla Inc. | Layton, UT | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.5 GWh | Dec 2016 | Dec 2023 | Solar |
Sunnyside Cogen Associates | Sunnyside Cogeneration Assoc | Sunnyside, UT | PacifiCorp East (PACE) | 306.3 GWh | Jan 1993 | Aug 2024 | Waste/Other Coal : 99.8% |
Fiddler's Canyon 3 | SunE Solar XVII Project 3, LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.3 GWh | Nov 2015 | Dec 2023 | Solar |
Fiddler's Canyon #2 | SunE Solar XVII Project 2, LLC | Cedar City, UT | PacifiCorp East (PACE) | 6.9 GWh | Aug 2015 | Dec 2023 | Solar |
Fiddler's Canyon #1 | SunE Solar XVII Project 1, LLC | Cedar City, UT | PacifiCorp East (PACE) | 6.9 GWh | Aug 2015 | Dec 2023 | Solar |
Milford 2 | SunE DB24 LLC | Milford, UT | PacifiCorp East (PACE) | 6.5 GWh | Nov 2015 | Dec 2023 | Solar |
Spanish Fork | Strawberry Water Users Assn | Spanish Fork, UT | PacifiCorp East (PACE) | 11.5 GWh | Sep 1937 | Dec 2023 | Water |
Steel Solar LLC | Steel Solar, LLC | Plymouth, UT | Western Area Power Administration - Upper Great Plains West (WAUW) | 69.2 GWh | - | Aug 2024 | Solar |
Spanish Fork Wind Park 2 LLC | Spanish Fork Wind Park 2, LLC | Spanish Fork, UT | PacifiCorp East (PACE) | 42.1 GWh | Jun 2008 | Aug 2024 | Wind |
Snowbird Power Plant | Snowbird Corporation | Snowbird, UT | PacifiCorp East (PACE) | 14.4 GWh | Nov 1986 | Dec 2023 | Natural Gas |
Sigurd Solar LLC | Sigurd Solar LLC | Sigurd, UT | PacifiCorp East (PACE) | 207.6 GWh | Apr 2021 | Aug 2024 | Solar |
Rocket Solar, LLC | Rocket Solar, LLC | Corinne, UT | PacifiCorp East (PACE) | 140.0 GWh | - | Aug 2024 | Solar |
South Milford Solar Plant | REUT Origination, LLC | Milford, UT | PacifiCorp East (PACE) | 7.1 GWh | Feb 2015 | Dec 2023 | Solar |
Quichapa 3 | Quichapa 3 LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.5 GWh | Nov 2016 | Dec 2023 | Solar |
Quichapa 2 | Quichapa 2 LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.4 GWh | Nov 2016 | Dec 2023 | Solar |
Quichapa 1 | Quichapa 1 LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.6 GWh | Nov 2016 | Dec 2023 | Solar |
Payson | Payson City Corporation | Payson, UT | PacifiCorp East (PACE) | 5.0 MWh | May 1988 | Dec 2023 | Natural Gas : 98.1% Distillate Fuel Oil : 1.9% |
Pavant Solar II LLC | Pavant Solar II LLC | Fillmore, UT | PacifiCorp East (PACE) | 102.4 GWh | Oct 2016 | Dec 2023 | Solar |
Lake Side Power Plant | PacifiCorp | Vineyard, UT | PacifiCorp East (PACE) | 6.1 TWh | Aug 2007 | Aug 2024 | Natural Gas |
Currant Creek | PacifiCorp | Mona, UT | PacifiCorp East (PACE) | 2.8 TWh | May 2005 | Aug 2024 | Natural Gas |
Blundell | PacifiCorp | Milford, UT | PacifiCorp East (PACE) | 248.2 GWh | Jun 1984 | Dec 2023 | Geothermal |
Huntington | PacifiCorp | Huntington, UT | PacifiCorp East (PACE) | 2.5 TWh | Jun 1974 | Aug 2024 | Bituminous Coal : 99.9% |
Cutler Hydro | PacifiCorp | Collinston, UT | PacifiCorp East (PACE) | 96.2 GWh | Jun 1927 | Dec 2023 | Water |
Gadsby | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 366.2 GWh | Aug 1951 | Aug 2024 | Natural Gas |
Granite | PacifiCorp | Salt lake City, UT | PacifiCorp East (PACE) | 3.4 GWh | Jul 1896 | Oct 2023 | Water |
Pioneer | PacifiCorp | Ogden, UT | PacifiCorp East (PACE) | 18.7 GWh | May 1910 | Dec 2023 | Water |
Weber | PacifiCorp | South Weber, UT | PacifiCorp East (PACE) | 9.5 GWh | Jun 1911 | Dec 2023 | Water |
Hunter | PacifiCorp | Castle Dale, UT | PacifiCorp East (PACE) | 3.4 TWh | May 1978 | Aug 2024 | Bituminous Coal : 99.7% |
Stairs | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 4.6 GWh | Jun 1912 | Oct 2023 | Water |
Pavant Solar, LLC | Onward Energy | Fillmore, UT | PacifiCorp East (PACE) | 110.1 GWh | Nov 2015 | Aug 2024 | Solar |
Red Mesa Solar Project | NTUA Generation - Utah, LLC | Red Mesa, UT | PacifiCorp East (PACE) | 193.9 GWh | Mar 2023 | Aug 2024 | Solar |
Uintah | Moon Lake Electric Assn Inc | Neola, UT | Western Area Power Administration - Rocky Mountain Region (WACM) | 6.3 GWh | Jun 1920 | Dec 2023 | Water |
Utah Red Hills Renewable Energy Park | MN8 Energy LLC | Parowan, UT | PacifiCorp East (PACE) | 189.8 GWh | Nov 2015 | Dec 2023 | Solar |
Laho Solar Plant | MN8 Energy LLC | Milford, UT | PacifiCorp East (PACE) | 6.1 GWh | Jun 2015 | Dec 2023 | Solar |
Milford Wind Corridor Stage II LLC | Milford Wind Corridor Stage II LLC | Milford, UT | Los Angeles Department of Water and Power (LDWP) | 162.6 GWh | Apr 2011 | Aug 2024 | Wind |
Milford Wind Corridor I LLC | Milford Wind Corridor Phase I, LLC (Longroad) | Milford, UT | Los Angeles Department of Water and Power (LDWP) | 346.0 GWh | Aug 2009 | Aug 2024 | Wind |
Milford Solar 1 | Milford Solar 1, LLC | Milford, UT | PacifiCorp East (PACE) | 260.4 GWh | Oct 2020 | Aug 2024 | Solar |
Intermountain Power Project | Los Angeles Department of Water & Power | Delta, UT | Los Angeles Department of Water and Power (LDWP) | 4.1 TWh | May 1986 | Aug 2024 | Bituminous Coal : 85.6% Subbituminous Coal : 14.0% |
Kennecott Power Plant | Kennecott Utah Copper | Magna, UT | PacifiCorp East (PACE) | 122.8 GWh | Dec 1942 | Aug 2024 | Waste Heat : 69.8% Natural Gas : 30.2% |
Pavant Solar III | Invenergy Services LLC | Filmore, UT | PacifiCorp East (PACE) | 40.8 GWh | Nov 2016 | Dec 2023 | Solar |
Hurricane City Power | Hurricane City Power | Hurricane, UT | PacifiCorp East (PACE) | 3.5 GWh | Nov 1999 | Dec 2023 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
Hunter Solar LLC (UT) | Hunter Solar LLC | Clawson, UT | PacifiCorp East (PACE) | 268.9 GWh | Feb 2021 | Aug 2024 | Solar |
Horseshoe Solar, LLC | Horseshoe Solar, LLC | Tooele, UT | PacifiCorp East (PACE) | 87.1 GWh | - | Aug 2024 | Solar |
Snake Creek | Heber Light & Power Company | Midway, UT | PacifiCorp East (PACE) | 3.2 GWh | Jun 1910 | Dec 2022 | Water |
Heber City | Heber Light & Power Company | Heber City, UT | PacifiCorp East (PACE) | 22.3 GWh | Nov 1990 | Dec 2023 | Natural Gas |
Lake Creek Dam | Heber Light & Power Company | Heber City, UT | PacifiCorp East (PACE) | 3.1 GWh | Apr 1981 | Dec 2022 | Water |
Gunnison Solar | Greenbacker Renewable Energy Corporation | Gunnison, UT | PacifiCorp East (PACE) | 3.9 GWh | Aug 2022 | Dec 2023 | Solar |
Appaloosa Solar I | Greenbacker Renewable Energy Corporation | Cedar City, UT | PacifiCorp East (PACE) | 122.6 GWh | - | Aug 2024 | Solar |
Graphite Solar I | Greenbacker Renewable Energy Corporation | Wellington, UT | PacifiCorp East (PACE) | 189.3 GWh | May 2022 | Aug 2024 | Solar |
Smithfield 3 | Greenbacker Renewable Energy Corporation | Milford, UT | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.0 GWh | Jun 2023 | Dec 2023 | Solar |
Boulder | Garkane Energy Coop, Inc | Boulder, UT | Western Area Power Administration - Rocky Mountain Region (WACM) | 20.2 GWh | Jul 1958 | Dec 2023 | Water |
Granite Peak Solar Plant | Evergreen Wind, LLC | Milford, UT | PacifiCorp East (PACE) | 6.1 GWh | Jul 2015 | Dec 2023 | Solar |
Greenville Solar Plant | Evergreen Wind, LLC | Milford, UT | PacifiCorp East (PACE) | 4.3 GWh | Sep 2015 | Dec 2023 | Solar |
Milford Flat Solar Plant | Evergreen Wind, LLC | Milford, UT | PacifiCorp East (PACE) | 6.1 GWh | Jun 2015 | Dec 2023 | Solar |
Buckhorn Solar Plant | Evergreen Wind, LLC | Paragonah, UT | PacifiCorp East (PACE) | 5.8 GWh | Nov 2015 | Dec 2023 | Solar |
Beryl Solar Plant | Evergreen Wind, LLC | Beryl, UT | PacifiCorp East (PACE) | 6.1 GWh | Jul 2015 | Dec 2023 | Solar |
Cedar Valley Solar Plant | Evergreen Wind, LLC | Cedar City, UT | PacifiCorp East (PACE) | 5.9 GWh | Nov 2015 | Dec 2023 | Solar |
Salt Lake Energy Systems | EPP Renewable Energy | Salt Lake City, UT | PacifiCorp East (PACE) | 24.8 GWh | May 2006 | Dec 2023 | Landfill Gas |
Nodal Power | ENERGYneering Solutions, Inc | Salt Lake City, UT | El Paso Electric Company (EPE) | 15.8 GWh | Mar 2008 | Dec 2023 | Landfill Gas |
Enel Cove Fort | Enel Cove Fort LLC | Cove Fort, UT | PacifiCorp East (PACE) | 155.0 GWh | Nov 2013 | Dec 2023 | Geothermal |
Elektron Solar, LLC | Elektron Solar, LLC | Grantsville, UT | PacifiCorp East (PACE) | 71.8 GWh | - | Aug 2024 | Solar |
Trans-Jordan Generating Station | EDL Inc | South Jordan, UT | PacifiCorp East (PACE) | 38.2 GWh | Feb 2009 | Dec 2023 | Landfill Gas |
Bonanza | Deseret Generation & Tran Coop | Vernal, UT | PacifiCorp East (PACE) | 3.3 TWh | Apr 1986 | Aug 2024 | Bituminous Coal : 99.4% Solar : 0.5% |
Solomon Generating Facility | Deseret Generation & Tran Coop | St. George, UT | PacifiCorp East (PACE) | 35.3 GWh | Jun 2022 | Dec 2023 | Natural Gas |
Cove Mountain Solar | Cove Mountain Solar LLC | Beryl, UT | PacifiCorp East (PACE) | 156.5 GWh | Oct 2020 | Aug 2024 | Solar |
Cove Mountain Solar 2 | Cove Mountain Solar 2 LLC | Beryl, UT | PacifiCorp East (PACE) | 317.3 GWh | Sep 2020 | Aug 2024 | Solar |
Granite Mountain Solar East, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 211.2 GWh | Aug 2016 | Aug 2024 | Solar |
Granite Mountain Solar West, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 127.8 GWh | Aug 2016 | Aug 2024 | Solar |
Iron Springs Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 214.0 GWh | Jul 2016 | Aug 2024 | Solar |
Escalante Solar III, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 209.7 GWh | Jul 2016 | Aug 2024 | Solar |
Escalante Solar II, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 212.9 GWh | Jul 2016 | Aug 2024 | Solar |
Escalante Solar I, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 212.6 GWh | Jul 2016 | Aug 2024 | Solar |
Enterprise Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Newcastle, UT | PacifiCorp East (PACE) | 230.1 GWh | Jun 2016 | Aug 2024 | Solar |
Washington City Electric Generation | City of Washington - (UT) | Washington, UT | PacifiCorp East (PACE) | 4.1 GWh | Apr 2007 | Dec 2023 | Natural Gas |
Millcreek Power Generation | City of St George | St. George, UT | PacifiCorp East (PACE) | 118.6 GWh | Mar 2006 | Oct 2023 | Natural Gas |
St George Red Rock | City of St George | St George, UT | PacifiCorp East (PACE) | 675.0 MWh | Apr 1987 | Dec 2023 | Distillate Fuel Oil |
Bloomington Power Plant | City of St George | Bloomington, UT | PacifiCorp East (PACE) | 200.0 MWh | Feb 1999 | Dec 2022 | Distillate Fuel Oil |
Bartholomew | City of Springville - (UT) | Springville, UT | PacifiCorp East (PACE) | 1.7 GWh | Mar 1988 | Dec 2023 | Water |
Whitehead | City of Springville - (UT) | Springville, UT | PacifiCorp East (PACE) | 9.5 GWh | Jul 1986 | Dec 2023 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
Murray Turbine | City of Murray - (UT) | Murray, UT | PacifiCorp East (PACE) | 14.1 GWh | May 2001 | Dec 2023 | Natural Gas |
Little Cottonwood | City of Murray - (UT) | Sandy, UT | PacifiCorp East (PACE) | 4.4 GWh | Mar 1983 | Nov 2023 | Water |
Browse Power Plants By Utah Counties
Figures are based on December 2023 generation numbers.County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Duchesne County, UT | # 25 | 1 | 6.3 GWh |
Sanpete County, UT | # 24 | 5 | 11.7 GWh |
Morgan County, UT | # 23 | 1 | 15.9 GWh |
Garfield County, UT | # 22 | 1 | 20.2 GWh |
Summit County, UT | # 21 | 2 | 25.2 GWh |
Davis County, UT | # 20 | 5 | 33.4 GWh |
Weber County, UT | # 19 | 5 | 38.0 GWh |
Cache County, UT | # 18 | 5 | 59.8 GWh |
Wasatch County, UT | # 17 | 5 | 102.1 GWh |
Rich County, UT | # 16 | 1 | 135.3 GWh |
Tooele County, UT | # 15 | 5 | 161.8 GWh |
Sevier County, UT | # 14 | 1 | 207.6 GWh |
Washington County, UT | # 13 | 9 | 221.2 GWh |
County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Box Elder County, UT | # 12 | 5 | 313.4 GWh |
San Juan County, UT | # 11 | 3 | 341.5 GWh |
Daggett County, UT | # 10 | 1 | 413.6 GWh |
Carbon County, UT | # 9 | 3 | 495.6 GWh |
Salt Lake County, UT | # 8 | 17 | 1.8 TWh |
Iron County, UT | # 7 | 19 | 1.8 TWh |
Beaver County, UT | # 6 | 22 | 1.9 TWh |
Juab County, UT | # 5 | 2 | 3.0 TWh |
Uintah County, UT | # 4 | 1 | 3.3 TWh |
Millard County, UT | # 3 | 8 | 4.4 TWh |
Emery County, UT | # 2 | 8 | 6.3 TWh |
Utah County, UT | # 1 | 13 | 7.1 TWh |