Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
WYM 1250 Palmer LLC | CVI CleanCapital Solar 6 | Palmer, MA | ISO New England (ISNE) | 755.0 MWh | Aug 2013 | Dec 2023 | Solar |
Silvi Gibraltar Rock | CVI CleanCapital Solar 5 LLC | Belle Mead, NJ | PJM Interconnection, LLC (PJM) | 2.7 GWh | Sep 2016 | Dec 2023 | Solar |
Seabrook Village | CVI CleanCapital Solar 5 LLC | Tinton Falls, NJ | PJM Interconnection, LLC (PJM) | 4.5 GWh | Aug 2016 | Dec 2023 | Solar |
Pfizer Peapack Solar | CVI CleanCapital Solar 5 LLC | Peapack, NJ | PJM Interconnection, LLC (PJM) | 8.8 GWh | Sep 2016 | Dec 2023 | Solar |
Imclone Solar Electric Facility | CVI CleanCapital Solar 5 LLC | Branchburg, NJ | PJM Interconnection, LLC (PJM) | 11.3 GWh | Apr 2014 | Dec 2023 | Solar |
Delilah Road Landfill | CVI CleanCapital Solar 5 LLC | Egg Harbor, NJ | PJM Interconnection, LLC (PJM) | 12.4 GWh | Sep 2016 | Dec 2023 | Solar |
United Stationers Supply Solar Electric | CVI CleanCapital Solar 4 LLC | Cranbury, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2011 | Dec 2023 | Solar |
Williams-Sonoma Solar Facility | CVI CleanCapital Solar 4 LLC | Jamesburg, NJ | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2011 | Dec 2023 | Solar |
Atlantic Coast Freezers Solar Facility | CVI CleanCapital Solar 4 LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Mar 2012 | Dec 2023 | Solar |
Corning Pharmaceutical Glass | CVI CleanCapital Solar 4 LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 2.9 GWh | Aug 2012 | Dec 2023 | Solar |
Middlesex Apple Orchard Solar | CVI CleanCapital Solar 4 LLC | North Brunswick, NJ | PJM Interconnection, LLC (PJM) | 5.9 GWh | Mar 2013 | Dec 2023 | Solar |
North Jersey Media Group Solar Facility | CVI CleanCapital Solar 4 LLC | Rockaway Township, NJ | PJM Interconnection, LLC (PJM) | 4.5 GWh | Feb 2013 | Dec 2023 | Solar |
Amazon | CVI CleanCapital Solar 4 LLC | Carteret, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2011 | Dec 2023 | Solar |
The Lawrenceville School Solar Facility | CVI CleanCapital Solar 4 LLC | Lawrenceville, NJ | PJM Interconnection, LLC (PJM) | 7.0 GWh | Apr 2012 | Dec 2023 | Solar |
Williamstown Solar | CVI CleanCapital Solar 1 LLC | Williamstown, VT | ISO New England (ISNE) | 1.9 GWh | Nov 2012 | Dec 2023 | Solar |
SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2012 | Dec 2023 | Solar |
SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 4.4 GWh | May 2012 | Dec 2023 | Solar |
SVEP Solar Project Company | CVI CleanCapital Solar 1 LLC | Pownal, VT | ISO New England (ISNE) | 1.9 GWh | Nov 2012 | Dec 2023 | Solar |
Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2010 | Dec 2023 | Solar |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 89.3 MWh | Nov 2012 | Oct 2023 | Solar |
Leicester One MA Solar LLC | CVI CleanCapital Solar 1 LLC | Leicester, MA | ISO New England (ISNE) | 5.1 GWh | Dec 2014 | Dec 2023 | Solar |
State Street Solar LLC | CVI CleanCapital Solar 1 LLC | Palmer, MA | ISO New England (ISNE) | 1.2 GWh | Mar 2014 | Dec 2023 | Solar |
CentraState Medical Center PV Facility | CVI CleanCapital Solar 1 LLC | Freehold, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Sep 2014 | Dec 2023 | Solar |
Browne Solar LLC | CVI CleanCapital Solar 1 LLC | Palmer, MA | ISO New England (ISNE) | 1.3 GWh | Mar 2014 | Dec 2023 | Solar |
Indian Hill Solar LLC | CVI CleanCapital Solar 1 LLC | Palmer, MA | ISO New England (ISNE) | 1.3 GWh | Mar 2014 | Dec 2023 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.8 GWh | Oct 2017 | Aug 2024 | Solar |
Cutrale Citrus Juices USA II | Cutrale Citrus Juices USA Inc | Auburndale, FL | Tampa Electric Company (TEC) | 33.4 GWh | Nov 2010 | Dec 2023 | Natural Gas |
Cutrale Citrus Juices USA I | Cutrale Citrus Juices USA Inc | Leesburg, FL | Duke Energy Florida, Inc. (FPC) | 24.5 GWh | Nov 2010 | Dec 2023 | Natural Gas |
Cutlass Solar 1 LLC | Cutlass Solar 1, LLC | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 209.1 GWh | Nov 2022 | Aug 2024 | Solar |
Rowland Solar II | Cutlass II Solar LLC | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 81.8 GWh | - | Aug 2024 | Solar |
Cushaw | Cushaw Hydro LLC | Warm Springs, VA | PJM Interconnection, LLC (PJM) | 12.0 GWh | Dec 1929 | Dec 2022 | Water |
Hickory | Current Energy Group | Rose Hill, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Nov 2019 | Dec 2023 | Solar |
MU Combined Heat and Power Plant | Curators of the University of Missouri | Columbia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 190.5 GWh | Jun 1961 | Aug 2024 | Natural Gas : 72.8% Wood/Wood Waste Solids : 24.3% Bituminous Coal : 2.9% |
Cuming County Renewables, LLC | Cuming County Renewables. LLC | Wisner, NE | Southwest Power Pool (SWPP) | 10.0 GWh | Nov 2019 | Dec 2023 | Wind |
Cumberland Rose | Cumberland Rose Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Jul 2012 | Dec 2023 | Wind |
Cumblerland Land Holdings, LLC | Cumberland Land Holdings, LLC | Elkmont, AL | Tennessee Valley Authority (TVA) | 28.6 GWh | Nov 2018 | Dec 2023 | Solar |
Delta's Edge Solar | Cubico USA, LLC | Greenwood, MS | Midcontinent Independent System Operator, Inc. (MISO) | 169.1 GWh | Oct 2023 | Aug 2024 | Solar |
Midlands | Cubico USA, LLC | St. Matthews, SC | Dominion Energy South Carolina, Inc. (SCEG) | 147.8 GWh | Jun 2020 | Aug 2024 | Solar |
Wagyu | Cubico USA, LLC | Damon, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 202.2 GWh | Jul 2020 | Aug 2024 | Solar |
Huntley | Cubico USA, LLC | Bowman, SC | Dominion Energy South Carolina, Inc. (SCEG) | 157.8 GWh | Mar 2020 | Aug 2024 | Solar |
Crooked Run | Cubico USA, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 141.4 GWh | Nov 2019 | Aug 2024 | Solar |
Palmetto Plains | Cubico USA, LLC | Bowman, SC | Dominion Energy South Carolina, Inc. (SCEG) | 120.3 GWh | Jun 2019 | Aug 2024 | Solar |
Cubera Solar, LLC | Cubera Solar, LLC | Dunn, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Dec 2019 | Dec 2023 | Solar |
Onslow Power Producers | Cube District Energy, LLC | Jacksonville, NC | Duke Energy Carolinas (DUK) | 10.9 GWh | Oct 2013 | Dec 2023 | Landfill Gas |
Black Oak Power Producers | Cube District Energy, LLC | Hartville, MO | Associated Electric Cooperative, Inc. (AECI) | 16.5 GWh | Nov 2014 | Dec 2023 | Landfill Gas |
Bi-County Gas Producers | Cube District Energy, LLC | Woodlawn, TN | Tennessee Valley Authority (TVA) | 11.2 GWh | Jul 2011 | Dec 2023 | Landfill Gas |
MAS ASB Cogen Plant | Cube District Energy, LLC | Atlanta, GA | Southern Company Services, Inc. - Trans (SOCO) | 39.2 GWh | Feb 2012 | Aug 2024 | Natural Gas : 98.8% Landfill Gas : 1.2% |
Oak Grove Power Producers | Cube District Energy, LLC | Arcadia, KS | Southwest Power Pool (SWPP) | 20.2 GWh | Feb 2010 | Dec 2023 | Landfill Gas |
Georgia LFG Oak Grove Plant | Cube District Energy, LLC | Winder, GA | Southern Company Services, Inc. - Trans (SOCO) | 38.4 GWh | Jul 2016 | Dec 2023 | Landfill Gas : 82.4% Natural Gas : 17.6% |
Georgia LFG Pine Ridge Plant | Cube District Energy, LLC | Griffin, GA | Southern Company Services, Inc. - Trans (SOCO) | 40.0 GWh | May 2016 | Dec 2023 | Landfill Gas |
Georgia LFG Richland Creek Plant | Cube District Energy, LLC | Buford, GA | Southern Company Services, Inc. - Trans (SOCO) | 62.8 GWh | Aug 2016 | Dec 2023 | Landfill Gas |
Cuba 2.5ac, LLC | Cuba 2.5ac, LLC | Cuba, NM | Public Service Company of New Mexico (PNM) | 6.0 GWh | Jan 2022 | Dec 2023 | Solar |
CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2023 | Solar |
CSUCI Site Authority | CSUCI Site Authority | Camarillo, CA | California Independent System Operator (CISO) | 956.0 MWh | Feb 1988 | Jul 2024 | Natural Gas |
Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 388.3 GWh | Mar 2016 | Dec 2023 | Solar |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 277.2 GWh | Oct 2013 | Dec 2023 | Solar |
CSL Behring LLC | CSL Behring LLC | Bradley, IL | PJM Interconnection, LLC (PJM) | 22.9 GWh | Apr 1993 | Dec 2023 | Natural Gas |
CSG Mt. Morris 2, LLC | CSG Mt. Morris 2, LLC | Mt. Morries, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Mar 2021 | Dec 2023 | Solar |
Vestas Towers America, Inc. | CS Wind America, Inc. | Pueblo, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.4 GWh | Mar 2010 | Aug 2024 | Wind |
CSWIND America Inc. | CS Wind America, Inc. | Pueblo, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 5.9 GWh | Sep 2023 | Dec 2023 | Solar |
Crystal Springs | Crystal Springs Hydro Elec LP | Filer, ID | Idaho Power Company (IPCO) | 8.9 GWh | Dec 1987 | Dec 2023 | Water |
Crystal Lake 3 LLC | Crystal Lake 3 LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 243.0 GWh | Nov 2009 | Aug 2024 | Wind |
Bay Windpower I | Crystal Flash Renewable Energy LLC dba Bay Windpower LLC | Mackinaw City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2001 | Sep 2023 | Wind |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Cruise Solar, LLC | Cruise Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Crowned Ridge Wind Energy Center | Crowned Ridge Wind, LLC | Watertown, SD | Midcontinent Independent System Operator, Inc. (MISO) | 717.1 GWh | Nov 2019 | Aug 2024 | Wind |
Crown | Crown Solar Center, LLC | Lancaster, SC | Duke Energy Carolinas (DUK) | 6.2 GWh | Feb 2020 | Dec 2023 | Solar |
Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 14.8 GWh | - | Aug 2024 | Solar |
Croton Solar | Croton Solar LLC | Cortlandt, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Nov 2021 | Dec 2023 | Solar |
Open View Solar Farm | Cross Pollination Inc | New Haven, VT | ISO New England (ISNE) | 2.5 GWh | Aug 2013 | Dec 2023 | Solar |
Crooked Lake Solar, LLC | Crooked Lake Solar, LLC | Blytheville, AR | Midcontinent Independent System Operator, Inc. (MISO) | 161.0 GWh | - | Aug 2024 | Solar |
Crofton Bluffs Wind LLC | Crofton Bluffs Wind, LLC | Bloomfield, NE | Southwest Power Pool (SWPP) | 119.0 GWh | Oct 2012 | Dec 2023 | Wind |
Croda Atlas Point CHP | Croda Inc. | New Castle, DE | PJM Interconnection, LLC (PJM) | 13.2 GWh | Jul 2013 | Dec 2023 | Landfill Gas |
Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.6 TWh | Nov 1995 | Aug 2024 | Natural Gas |
Crocker Wind Farm | Crocker Wind Farm, LLC | Conde, SD | Midcontinent Independent System Operator, Inc. (MISO) | 788.7 GWh | Oct 2019 | Aug 2024 | Wind |
Criterion | Criterion Power Partners LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 223.5 GWh | Nov 2010 | Aug 2024 | Wind |
Lake Blackshear Project | Crisp County Power Comm | Warwick, GA | Southern Company Services, Inc. - Trans (SOCO) | 42.9 GWh | Apr 1930 | Dec 2023 | Water |
Crisp Plant | Crisp County Power Comm | Warwick, GA | Southern Company Services, Inc. - Trans (SOCO) | 882.0 MWh | Apr 1957 | Dec 2023 | Natural Gas |
Cricket Valley Energy | Cricket Valley Energy Center LLC | Dover, NY | New York Independent System Operator (NYIS) | 4.3 TWh | Mar 2020 | Aug 2024 | Natural Gas |
Crestwood Dothan | Crestwood Corp | Dothan, AL | Southern Company Services, Inc. - Trans (SOCO) | 386.0 MWh | Dec 1994 | Dec 2022 | Distillate Fuel Oil |
Creston Ridge Wind Farm | Creston Ridge, LLC | Creston, NE | Southwest Power Pool (SWPP) | 26.1 GWh | Nov 2015 | Dec 2023 | Wind |
Creston Ridge II, LLC | Creston Ridge II, LLC | Creston, NE | Southwest Power Pool (SWPP) | 24.6 GWh | May 2017 | Dec 2023 | Wind |
CBS Studio Center | Crestmark Bank | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.5 GWh | May 2013 | Aug 2023 | Natural Gas |
Creed Energy Center | Creed Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 8.2 GWh | Dec 2002 | Dec 2023 | Natural Gas |
Cream Street Solar | Cream Street Solar, LLC | Hyde Park, NY | ISO New England (ISNE) | 3.6 GWh | Nov 2020 | Dec 2023 | Solar |
Crater Community Solar | Crater Community Solar | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Nov 2017 | Dec 2023 | Solar |
Crane Garden | Crane Garden LLC | Lester Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 193.0 MWh | Oct 2023 | Dec 2023 | Solar |
Cranberry Highway Solar LLC | Cranberry Highway Solar, LLC | Wareham, MA | ISO New England (ISNE) | 3.1 GWh | Feb 2021 | Dec 2023 | Solar |
Conception | CR Clearing, LLC | Stanberry, MO | Associated Electric Cooperative, Inc. (AECI) | 79.9 GWh | Mar 2008 | Aug 2024 | Wind |
CPV Valley Energy Center | CPV Valley, LLC | Wawayanda, NY | New York Independent System Operator (NYIS) | 5.0 TWh | Apr 2018 | Aug 2024 | Natural Gas |
CPV Towantic Energy Center | CPV Towantic, LLC | Oxford, CT | ISO New England (ISNE) | 5.5 TWh | Apr 2018 | Aug 2024 | Natural Gas |
CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 6.5 TWh | May 2023 | Aug 2024 | Natural Gas |
CPV Stagecoach Solar | CPV Stagecoach Solar, LLC | Andersonville, GA | Southern Company Services, Inc. - Trans (SOCO) | 71.5 GWh | - | Aug 2024 | Solar |
Spruce Mountain WInd | CPV Spruce Mountain Wind LLC | Bryant Pond, ME | ISO New England (ISNE) | 52.9 GWh | Nov 2011 | Dec 2023 | Wind |
Saddleback Ridge Wind Farm | CPV Saddleback Ridge Wind, LLC | Carthage, ME | ISO New England (ISNE) | 82.5 GWh | Nov 2014 | Dec 2023 | Wind |
CPV St Charles Energy Center | CPV Maryland LLC | Waldorf, MD | PJM Interconnection, LLC (PJM) | 3.8 TWh | Jan 2017 | Aug 2024 | Natural Gas |
CPV Maple Hill Solar | CPV Maple Hill Solar, LLC | Portage, PA | PJM Interconnection, LLC (PJM) | 134.8 GWh | Oct 2023 | Aug 2024 | Solar |
Keenan II Renewable Energy Co LLC | CPV Keenan II Renewable Energy Co LLC | Woodward, OK | Southwest Power Pool (SWPP) | 252.8 GWh | Nov 2010 | Dec 2023 | Wind |
CPV Fairview Energy Center | CPV Fairview, LLC | Johnstown, PA | PJM Interconnection, LLC (PJM) | 7.0 TWh | Nov 2019 | Aug 2024 | Natural Gas |
Canton Mountain Wind | CPV Canton Mountain Wind LLC | Canton, ME | ISO New England (ISNE) | 50.1 GWh | Oct 2017 | Dec 2023 | Wind |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |