Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Nov 1966 | Aug 2024 | Bituminous Coal : 97.5% Natural Gas : 2.5% |
A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 290.3 GWh | Feb 1979 | Aug 2024 | Bituminous Coal : 82.5% Natural Gas : 17.4% |
SIUC | Southern Illinois University Carbondale | Carbondale, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | May 1998 | Aug 2024 | Bituminous Coal |
Marion | Southern Illinois Power Coop | Marion, IL | Midcontinent Independent System Operator, Inc. (MISO) | 763.9 GWh | May 1963 | Aug 2024 | Bituminous Coal : 85.7% Natural Gas : 14.2% |
Milner Butte LFGE | Southern Idaho Solid Waste | Burley, ID | Idaho Power Company (IPCO) | 18.4 GWh | Sep 2018 | Dec 2023 | Landfill Gas |
Southern Current One, LLC | Southern Current One, LLC | Fairfax, SC | Dominion Energy South Carolina, Inc. (SCEG) | 16.6 GWh | Nov 2017 | Dec 2023 | Solar |
Fontana | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 1917 | Dec 2023 | Water |
Bishop Creek 5 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 13.7 GWh | May 1919 | Dec 2023 | Water |
Bishop Creek 4 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 49.8 GWh | Aug 1905 | Dec 2023 | Water |
Bishop Creek 3 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 26.2 GWh | May 1913 | Dec 2023 | Water |
Bishop Creek 2 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 35.6 GWh | Oct 1908 | Dec 2023 | Water |
Bishop Creek 6 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 9.6 GWh | Feb 1913 | Dec 2023 | Water |
Big Creek 2A | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 537.5 GWh | Jul 1928 | Aug 2024 | Water |
Kaweah 2 | Southern California Edison Co | Three Rivers, CA | California Independent System Operator (CISO) | 693.0 MWh | Aug 1929 | Dec 2023 | Water |
Kern River 3 | Southern California Edison Co | Kernville, CA | California Independent System Operator (CISO) | 184.5 GWh | Feb 1921 | Dec 2023 | Water |
Kern River 1 | Southern California Edison Co | Bakersfield, CA | California Independent System Operator (CISO) | 167.0 GWh | Apr 1907 | Dec 2023 | Water |
Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 11.3 GWh | Nov 1911 | Dec 2023 | Water |
Mammoth Pool | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 561.8 GWh | Feb 1960 | Aug 2024 | Water |
Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 35.7 GWh | Apr 1924 | Dec 2023 | Water |
Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 21.2 GWh | Nov 1956 | Dec 2023 | Water |
Rush Creek | Southern California Edison Co | June lake, CA | California Independent System Operator (CISO) | 40.4 GWh | Sep 1916 | Dec 2023 | Water |
Mountainview Generating Station | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.6 TWh | Nov 2005 | Aug 2024 | Natural Gas |
Santa Ana 1 | Southern California Edison Co | Highlands, CA | California Independent System Operator (CISO) | 5.6 MWh | Dec 1898 | Aug 2023 | Water |
Santa Ana 3 | Southern California Edison Co | Highlands, CA | California Independent System Operator (CISO) | 424.0 MWh | Aug 1999 | Dec 2023 | Water |
Big Creek 4 | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 452.9 GWh | May 1951 | Aug 2024 | Water |
Big Creek 3 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 783.0 GWh | Aug 1923 | Aug 2024 | Water |
Big Creek 2 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 296.2 GWh | Nov 1913 | Dec 2023 | Water |
Big Creek 1 | Southern California Edison Co | Big Creek, CA | California Independent System Operator (CISO) | 393.8 GWh | Oct 1913 | Dec 2023 | Water |
J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 1987 | Aug 2024 | Water |
Big Creek 8 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 152.9 GWh | Jul 1921 | Dec 2023 | Water |
Mill Creek 3 | Southern California Edison Co | Mill Creek, CA | California Independent System Operator (CISO) | 10.5 GWh | Feb 1903 | Dec 2023 | Water |
Pebbly Beach Generating Station Hybrid | Southern California Edison Co | Avalon, CA | California Independent System Operator (CISO) | 29.1 GWh | Jun 1958 | Aug 2024 | Distillate Fuel Oil : 94.4% Gaseous Propane : 5.6% |
McGrath Peaker | Southern California Edison Co | Oxnard, CA | California Independent System Operator (CISO) | 11.4 GWh | Oct 2012 | Dec 2023 | Natural Gas |
Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 11.2 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Barre Peaker | Southern California Edison Co | Stanton, CA | California Independent System Operator (CISO) | 21.5 GWh | Aug 2007 | Nov 2023 | Natural Gas |
Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 4.3 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Solar Photovoltaic Project #02 | Southern California Edison Co | Chino, CA | California Independent System Operator (CISO) | 482.7 MWh | Nov 2009 | Apr 2023 | Solar |
Solar Photovoltaic Project #09 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 580.8 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 6.9 GWh | Oct 2012 | Dec 2023 | Solar |
Solar Photovoltaic Project #48 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #32 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #33 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.0 GWh | Dec 2014 | Apr 2023 | Solar |
Cal State Univ San Bernardino FC01 | Southern California Edison Co | San Bernardino, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2013 | Dec 2022 | Natural Gas |
Solar Photovoltaic Project #03 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 452.8 MWh | Feb 2011 | Apr 2023 | Solar |
Solar Photovoltaic Project #28 | Southern California Edison Co | San Bernardino, CA | California Independent System Operator (CISO) | 1.9 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #27 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 845.1 MWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #06 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 687.4 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #26 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #07 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #22 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 329.9 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #23 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.2 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #18 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.1 GWh | Oct 2012 | Mar 2023 | Solar |
Solar Photovoltaic Project #17 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 2.6 GWh | Dec 2014 | Apr 2023 | Solar |
Solar Photovoltaic Project #16 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2015 | Mar 2023 | Solar |
Solar Photovoltaic Project #15 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.4 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #08 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 741.9 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #13 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.0 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #10 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 764.0 MWh | Dec 2012 | Mar 2023 | Solar |
Solar Photovoltaic Project #05 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #11 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.1 GWh | Jan 2015 | Apr 2023 | Solar |
Turnipseed Solar, LLC | Southeastern Solar Farm Fund, LLC | Douglasville, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.2 GWh | Oct 2017 | Dec 2023 | Solar |
Old Plank Road Solar Farm, LLC | Southeastern Solar Farm Fund, LLC | Jacksonville, FL | JEA (JEA) | 5.7 GWh | Sep 2017 | Dec 2023 | Solar |
Cedar Creek Solar, LLC | Southeastern Solar Farm Fund, LLC | Winder, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.4 GWh | Sep 2017 | Dec 2023 | Solar |
Cairo Solar Farm, LLC | Southeastern Solar Farm Fund, LLC | Cairo, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.5 GWh | May 2017 | Dec 2023 | Solar |
SECCRA Community Landfill | Southeastern Chester County Refuse Auth | West Grove, PA | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2006 | Dec 2023 | Landfill Gas |
Swan Lake | Southeast Alaska Power Agency | Ketchikan, AK | (NA) | 70.6 GWh | May 1984 | Dec 2023 | Water |
Tyee Lake Hydroelectric Facility | Southeast Alaska Power Agency | Wrangell, AK | (NA) | 119.1 GWh | Jun 1983 | Dec 2023 | Water |
Southbridge Landfill Gas-to-Energy | Southbridge Recycling and Disposal Park | Southbridge, MA | ISO New England (ISNE) | 11.7 GWh | Sep 2011 | Dec 2023 | Landfill Gas |
Red Gate Power Plant | South Texas Electric Coop, Inc | Edinburg, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 270.9 GWh | Nov 2016 | Aug 2024 | Natural Gas |
Sam Rayburn | South Texas Electric Coop, Inc | Nursery, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 314.2 GWh | Feb 1963 | Dec 2023 | Natural Gas : 99.9% |
Pearsall | South Texas Electric Coop, Inc | Pearsall, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 395.1 GWh | Apr 1961 | Dec 2023 | Natural Gas |
Sacramento Municipal Util Dist | South Sutter Water District | Sacramento, CA | California Independent System Operator (CISO) | 24.4 GWh | Jan 1985 | Aug 2023 | Water |
Leominster (MA)-South Street-R&D | South Street Solar, LLC | Tewksbury, MA | ISO New England (ISNE) | 2.7 GWh | Nov 2013 | Dec 2023 | Solar |
Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2008 | Dec 2023 | Solar |
South Point Energy Center | South Point Energy Center LLC | Mohave Valley, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 2.8 TWh | Feb 2001 | Aug 2024 | Natural Gas |
South Oaks Hospital | South Oak Hospital | Amityville, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Mar 2008 | Dec 2023 | Natural Gas |
Kihei Solar Farm | South Maui Renewable Resources LLC | Kihei, HI | (HECO) | 1.3 GWh | Apr 2018 | Dec 2023 | Solar |
Power Station 4 | South Houston Green Power LLC | Texas City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 629.1 GWh | Aug 1986 | Dec 2023 | Natural Gas |
Green Power 2 | South Houston Green Power LLC | Texas City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.8 TWh | Nov 2003 | Aug 2024 | Natural Gas : 99.7% |
South Garden | South Garden LLC | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Jun 2023 | Dec 2023 | Solar |
South Forks Hydro | South Forks Joint Venture | Hansen, ID | Idaho Power Company (IPCO) | 29.8 GWh | Nov 1984 | Oct 2023 | Water |
South Fork Wind Farm | South Fork Wind, LLC | Round Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.0 GWh | Nov 2016 | Dec 2023 | Wind |
South Field Energy | South Field Energy, LLC | Wellsville, OH | PJM Interconnection, LLC (PJM) | 8.5 TWh | Jul 2021 | Aug 2024 | Natural Gas |
Sly Creek | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 41.1 GWh | Jun 1983 | Dec 2023 | Water |
Forbestown | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 155.0 GWh | Sep 1963 | Dec 2023 | Water |
Kelly Ridge | South Feather Water and Power Agency | Oroville, CA | California Independent System Operator (CISO) | 65.0 GWh | Aug 1963 | Dec 2023 | Water |
Woodleaf | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 231.6 GWh | Oct 1963 | Dec 2023 | Water |
South Windsor Fuel Cell | South Energy Investments LLC | South Windsor, CT | ISO New England (ISNE) | 39.2 GWh | Feb 2020 | Dec 2023 | Natural Gas |
Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2020 | Dec 2023 | Solar |
Buzzard Roost | South Carolina Public Service Authority | Chappells, SC | Duke Energy Carolinas (DUK) | 37.8 GWh | Jul 1940 | Dec 2022 | Water |
Spillway | South Carolina Public Service Authority | Pineville, SC | South Carolina Public Service Authority (SC) | 11.8 GWh | Jul 1950 | Dec 2023 | Water |
Jefferies | South Carolina Public Service Authority | Moncks Corner, SC | South Carolina Public Service Authority (SC) | 247.6 GWh | Nov 1942 | Dec 2023 | Water |
Winyah | South Carolina Public Service Authority | Georgetown, SC | South Carolina Public Service Authority (SC) | 3.2 TWh | Feb 1975 | Aug 2024 | Bituminous Coal : 99.5% |
Hilton Head | South Carolina Public Service Authority | Hilton Head Island, SC | South Carolina Public Service Authority (SC) | 2.1 GWh | Jul 1973 | Nov 2023 | Distillate Fuel Oil |
John S Rainey | South Carolina Public Service Authority | Starr, SC | South Carolina Public Service Authority (SC) | 4.0 TWh | Aug 2001 | Aug 2024 | Natural Gas |
Horry Land Fill Gas Site | South Carolina Public Service Authority | Conway, SC | South Carolina Public Service Authority (SC) | 8.4 GWh | Jul 2001 | Dec 2023 | Landfill Gas |
Berkeley County Landfill | South Carolina Public Service Authority | Moncks Corner, SC | South Carolina Public Service Authority (SC) | 2.5 GWh | Jan 2011 | Dec 2023 | Landfill Gas |
Cross | South Carolina Public Service Authority | Cross, SC | South Carolina Public Service Authority (SC) | 8.6 TWh | Apr 1984 | Aug 2024 | Bituminous Coal : 99.6% |
Lee County Landfill | South Carolina Public Service Authority | Bishopville, SC | South Carolina Public Service Authority (SC) | 22.6 GWh | Dec 2004 | Dec 2023 | Landfill Gas |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |