Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
SV CSG Lily Lake 2 LLC | SV CSG Lily Lake 2 LLC | Maple Park, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2020 | Dec 2023 | Solar |
SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2021 | Dec 2023 | Solar |
SV CSG Barrass Farms II LL | SV CSG Barrass Farms II LLC | Marion, IL | Midcontinent Independent System Operator, Inc. (MISO) | 672.0 MWh | Aug 2023 | Dec 2023 | Solar |
SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 450.0 MWh | Aug 2023 | Dec 2023 | Solar |
SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 460.0 MWh | Aug 2023 | Dec 2023 | Solar |
Sutton Solar CSG | Sutton Solar, LLC | Sutton, MA | ISO New England (ISNE) | 3.1 GWh | Oct 2016 | Dec 2023 | Solar |
Sutton Solar 2, LLC CSG | Sutton Solar 2, LLC | Sutton, MA | ISO New England (ISNE) | 1.3 GWh | Nov 2020 | Dec 2023 | Solar |
Martin Limestone Solar Array | Sunstream Energy LLC | New Holland, PA | PJM Interconnection, LLC (PJM) | 1.6 GWh | Nov 2012 | Dec 2023 | Solar |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 115.9 GWh | Jul 2014 | Aug 2024 | Landfill Gas |
Linden 02 CSG | SunShare Management | Belle Plaine, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2020 | Dec 2023 | Solar |
Linden 03 CSG | SunShare Management | Belle Plaine, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2020 | Dec 2023 | Solar |
Linden 01 CSG | SunShare Management | Belle Plaine, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2020 | Dec 2023 | Solar |
Gilcrest V CSG | SunShare Management | Platteville, CO | Public Service Company of Colorado (PSCO) | 9.6 GWh | Jan 2021 | Dec 2023 | Solar |
Becker Solar CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2019 | Dec 2023 | Solar |
Becker Solar 2 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Feb 2019 | Dec 2023 | Solar |
Becker Solar 4 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2019 | Dec 2023 | Solar |
Becker Solar 5 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2019 | Dec 2023 | Solar |
Becker Solar 3 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Feb 2019 | Dec 2023 | Solar |
BentonSun LLC | SunShare Management | Norwood Young America, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.6 GWh | Nov 2016 | Dec 2023 | Solar |
WakeSun LLC | SunShare Management | Cold Spring, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Dec 2016 | Dec 2023 | Solar |
Jeffco Community Solar Gardens LLC | SunShare Management | Arvada, CO | Public Service Company of Colorado (PSCO) | 2.5 GWh | Apr 2016 | Dec 2023 | Solar |
Vasquez V CSG | SunShare Management | Platteville, CO | Public Service Company of Colorado (PSCO) | 8.2 GWh | Nov 2021 | Dec 2023 | Solar |
Gilcrest Sun CSG | SunShare Management | Platteville, CO | Public Service Company of Colorado (PSCO) | 4.3 GWh | Nov 2021 | Dec 2023 | Solar |
Sunrise Power LLC | Sunrise Power Co LLC | Fellows, CA | California Independent System Operator (CISO) | 2.6 TWh | May 2001 | Aug 2024 | Natural Gas |
Sunrise Community Solar | Sunrise Community Solar | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.5 GWh | Nov 2016 | Dec 2023 | Solar |
Plainfield One Solar LLC | SunRay Power LLC | Plainfield, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2011 | Dec 2023 | Solar |
Westborough Solar LLC | SunRay Power LLC | Westborough, MA | ISO New England (ISNE) | 2.3 GWh | Mar 2014 | Dec 2023 | Solar |
Engelhard Solar LLC | SunRay Power LLC | Monroe, NJ | PJM Interconnection, LLC (PJM) | 706.0 MWh | Nov 2012 | Dec 2023 | Solar |
Sunray 3 | Sunray Energy 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 32.6 GWh | Nov 1985 | Dec 2023 | Solar |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 56.7 GWh | Nov 1984 | Dec 2023 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 138.3 GWh | Nov 2018 | Aug 2024 | Solar |
Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.7 GWh | Oct 1997 | Dec 2023 | Natural Gas : 40.7% Landfill Gas : 30.6% Other Biomass Gas : 28.7% |
Sunnyside Cogen Associates | Sunnyside Cogeneration Assoc | Sunnyside, UT | PacifiCorp East (PACE) | 306.3 GWh | Jan 1993 | Aug 2024 | Waste/Other Coal : 99.8% |
Sunnybrook Solar Project - Hybrid | Sunnybrook Farm Solar, LLC | Scottsburg, VA | PJM Interconnection, LLC (PJM) | 87.8 GWh | Nov 2022 | Aug 2024 | Solar |
Templeton | Sunny Templeton, LLC | Templeton, MA | ISO New England (ISNE) | 4.7 GWh | Nov 2014 | Dec 2023 | Solar |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
Patriots Stadium | Sunlight General Somerset Solar LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 2013 | Dec 2023 | Solar |
Carrier Clinic | Sunlight General Solar Fund II, LLC | Belle Mead, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2009 | Dec 2023 | Solar |
Hall's Warehouse Solar Project | Sunlight General Solar Fund II, LLC | South Plainfield, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2009 | Dec 2023 | Solar |
William G Mennen Sports Solar | Sunlight General Morris Solar LLC | Morristown, NJ | PJM Interconnection, LLC (PJM) | 468.0 MWh | Jan 2011 | Dec 2023 | Solar |
Tioga Solar Morris County 1 LLC | Sunlight General Morris Solar LLC | Morristown, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Jan 2011 | Dec 2023 | Solar |
County College of Morris | Sunlight General Morris Solar LLC | Randolph, NJ | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2013 | Dec 2023 | Solar |
Mercer County Community College | Sunlight General Mercer Solar LLC | West Windsor, NJ | PJM Interconnection, LLC (PJM) | 9.8 GWh | Aug 2013 | Dec 2023 | Solar |
SunGen Sharon 1 LLC | SunGen Sharon 1 LLC | Sharon, VT | ISO New England (ISNE) | 2.6 GWh | Jul 2012 | Dec 2023 | Solar |
Sunflower Solar | Sunflower Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 32.9 GWh | Nov 2017 | Dec 2023 | Solar |
Sunflower Energy Center, LLC | Sunflower Energy Center, LLC | Peabody, KS | Southwest Power Pool (SWPP) | 805.4 GWh | Sep 2023 | Aug 2024 | Wind |
Clifton | Sunflower Electric Power Corp | Clifton, KS | Southwest Power Pool (SWPP) | 11.0 GWh | Jul 1974 | Nov 2023 | Natural Gas |
Rubart | Sunflower Electric Power Corp | Ulysses, KS | Southwest Power Pool (SWPP) | 70.3 GWh | Aug 2014 | Dec 2023 | Natural Gas |
Holcomb | Sunflower Electric Power Corp | Holcomb, KS | Southwest Power Pool (SWPP) | 1.2 TWh | Jul 1983 | Aug 2024 | Subbituminous Coal : 99.1% Natural Gas : 0.9% |
Garden City | Sunflower Electric Power Corp | Garden City, KS | Southwest Power Pool (SWPP) | 79.5 GWh | May 1968 | Dec 2023 | Natural Gas |
Cimarron River | Sunflower Electric Power Corp | Liberal, KS | Southwest Power Pool (SWPP) | 25.8 GWh | Sep 1963 | Nov 2023 | Natural Gas |
Fort Dodge | Sunflower Electric Power Corp | Dodge City, KS | Southwest Power Pool (SWPP) | 102.4 GWh | May 1969 | Aug 2024 | Natural Gas |
Great Bend - Sunflower | Sunflower Electric Power Corp | Great Bend, KS | Southwest Power Pool (SWPP) | 32.0 GWh | May 1963 | Dec 2023 | Natural Gas |
Sunflower County | Sunflower County Solar Project, LLC | Ruleville, MS | Midcontinent Independent System Operator, Inc. (MISO) | 143.6 GWh | Aug 2022 | Aug 2024 | Solar |
SunEnergy1-Scotland Neck, LLC | SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 5.7 GWh | Nov 2014 | Dec 2023 | Solar |
Plymouth Solar LLC | SunEnergy1 | Plymouth, NC | PJM Interconnection, LLC (PJM) | 2.0 GWh | Aug 2012 | Dec 2023 | Solar |
Berkley East Solar LLC | SunEdison LLC | Berkley, MA | ISO New England (ISNE) | 4.6 GWh | Jun 2013 | Dec 2023 | Solar |
Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.4 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2014 | Dec 2023 | Solar |
CES Sterling LLC | SunEdison LLC | Sterling, MA | ISO New England (ISNE) | 3.1 GWh | Jan 2013 | Dec 2023 | Solar |
SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.4 GWh | Sep 2014 | Dec 2023 | Solar |
SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.1 GWh | Feb 2016 | Dec 2023 | Solar |
Rattlesnake Den | SunEdison LLC | Garden City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 680.4 GWh | Jun 2015 | Aug 2024 | Wind |
ISH Solar Central, LLC | SunEdison LLC | Bayville, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Sep 2011 | Dec 2023 | Solar |
Prairie Breeze | SunEdison LLC | Elgin, NE | Southwest Power Pool (SWPP) | 765.7 GWh | Apr 2014 | Dec 2023 | Wind |
California Ridge Wind Energy LLC | SunEdison LLC | Fithian, IL | Midcontinent Independent System Operator, Inc. (MISO) | 738.8 GWh | Nov 2012 | Aug 2024 | Wind |
Bishop Hill Energy LLC | SunEdison LLC | Cambridge, IL | PJM Interconnection, LLC (PJM) | 564.1 GWh | May 2012 | Dec 2023 | Wind |
Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 775.0 MWh | Jul 2007 | Dec 2023 | Solar |
SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2007 | Dec 2023 | Solar |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2023 | Solar |
Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.0 GWh | Oct 2007 | Dec 2023 | Solar |
CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Lakeland Electric Co. (FL)-Airport 1 | SunE W12DG-B, LLC | Lakeland, FL | Tampa Electric Company (TEC) | 2.0 GWh | Nov 2011 | Dec 2023 | Solar |
WWRF Solar Plant | SunE U6 Holdings LLC | Rifle, CO | Public Service Company of Colorado (PSCO) | 2.0 GWh | Jan 2009 | Jun 2023 | Solar |
Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 891.0 MWh | Oct 2008 | Dec 2023 | Solar |
SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.5 GWh | Sep 2009 | Dec 2023 | Solar |
SPS5 Hopi | SunE SPS5, LLC | Carlsbad, NM | Southwest Power Pool (SWPP) | 19.9 GWh | Nov 2011 | Dec 2023 | Solar |
SPS4 Monument | SunE SPS4, LLC | Monument, NM | Southwest Power Pool (SWPP) | 22.3 GWh | Nov 2011 | Dec 2023 | Solar |
SPS3 Lea | SunE SPS3, LLC | Eunice, NM | Southwest Power Pool (SWPP) | 23.0 GWh | Oct 2011 | Dec 2023 | Solar |
SPS2 Jal | SunE SPS2, LLC | Jal, NM | Southwest Power Pool (SWPP) | 18.9 GWh | Aug 2011 | Dec 2023 | Solar |
SPS1 Dollarhide | SunE SPS1, LLC | Jal, NM | Southwest Power Pool (SWPP) | 22.1 GWh | Aug 2011 | Dec 2023 | Solar |
Fiddler's Canyon 3 | SunE Solar XVII Project 3, LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.3 GWh | Nov 2015 | Dec 2023 | Solar |
Fiddler's Canyon #2 | SunE Solar XVII Project 2, LLC | Cedar City, UT | PacifiCorp East (PACE) | 6.9 GWh | Aug 2015 | Dec 2023 | Solar |
Fiddler's Canyon #1 | SunE Solar XVII Project 1, LLC | Cedar City, UT | PacifiCorp East (PACE) | 6.9 GWh | Aug 2015 | Dec 2023 | Solar |
SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 1.0 GWh | Jul 2016 | Oct 2023 | Solar |
CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
Chimes West Friendship (Nixon Farms) | SunE SEM 1, LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 1.8 GWh | Nov 2014 | Dec 2023 | Solar |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2012 | Dec 2023 | Solar |
City of Boulder WWTP | SunE NLB-2, LLC | Boulder, CO | Public Service Company of Colorado (PSCO) | 867.0 MWh | May 2010 | Dec 2023 | Solar |
SunEdison LV Sutton Plant Site | SunE NC Progress 1 LLC | Wilmington, NC | Duke Energy Progress East (CPLE) | 1.2 GWh | Nov 2008 | Dec 2023 | Solar |
Roger Road WWTP | SunE M5C Holdings LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 1.1 GWh | Jul 2010 | Dec 2023 | Solar |
SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 969.0 MWh | Feb 2009 | Dec 2023 | Solar |
SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 747.0 MWh | Nov 2008 | Dec 2023 | Solar |
City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2009 | Sep 2023 | Solar |
SunE EPE2 LLC | SunE EPE2, LLC | Las Cruces, NM | El Paso Electric Company (EPE) | 26.3 GWh | Apr 2012 | Dec 2023 | Solar |
SunE EPE1 LLC | SunE EPE1 LLC | Chaparral, NM | El Paso Electric Company (EPE) | 25.6 GWh | May 2012 | Dec 2023 | Solar |
Cecil County CCVT HS | SunE DB42, LLC | Elkton, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |