Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
SPS3 Lea | SunE SPS3, LLC | Eunice, NM | Southwest Power Pool (SWPP) | 23.0 GWh | Oct 2011 | Dec 2023 | Solar |
SPS4 Monument | SunE SPS4, LLC | Monument, NM | Southwest Power Pool (SWPP) | 22.3 GWh | Nov 2011 | Dec 2023 | Solar |
SPS5 Hopi | SunE SPS5, LLC | Carlsbad, NM | Southwest Power Pool (SWPP) | 19.9 GWh | Nov 2011 | Dec 2023 | Solar |
Vineland Headquarters | NFI Solar LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | May 2011 | Dec 2023 | Solar |
North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2012 | Dec 2023 | Solar |
The City of Vineland at West Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 3.5 GWh | Sep 2011 | Dec 2023 | Solar |
The City of Vineland at North Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | Sep 2011 | Dec 2023 | Solar |
Gordon Butte Wind LLC | Gordon Butte Wind LLC | Martinsdale, MT | NorthWestern Corporation (NWMT) | 66.5 GWh | Dec 2011 | Dec 2023 | Wind |
Sawtooth Wind Project | Idaho Winds LLC | Glenns Ferry, ID | Idaho Power Company (IPCO) | 56.4 GWh | Sep 2011 | Dec 2023 | Wind |
Maple Solar | NFI Solar LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Apr 2011 | Dec 2023 | Solar |
SMUD at Lawrence | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 4.2 GWh | Nov 2011 | Dec 2023 | Solar |
Frederick County LFGTE Facility | Frederick County Virginia | Winchester, VA | PJM Interconnection, LLC (PJM) | 9.4 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
TPW Petersburg | TPW Petersburg LLC | Petersburg, NE | Southwest Power Pool (SWPP) | 151.1 GWh | Oct 2011 | Dec 2023 | Wind |
Coastal Energy Project | Coastal Community Action Program | Aberdeen, WA | Bonneville Power Administration (BPAT) | 11.6 GWh | May 2010 | Dec 2023 | Wind |
Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 264.0 GWh | Jul 2012 | Dec 2023 | Wind |
Power County Wind Park South | Power County Wind Park South LLC | American Falls, ID | PacifiCorp East (PACE) | 41.2 GWh | Nov 2011 | Dec 2023 | Wind |
Power County Wind Park North | Power County Wind Park North LLC | American Falls, ID | PacifiCorp East (PACE) | 48.1 GWh | Nov 2011 | Dec 2023 | Wind |
Youngs Creek Hydroelectric Project | PUD No 1 of Snohomish County | Monroe, WA | Bonneville Power Administration (BPAT) | 14.9 GWh | Oct 2011 | Dec 2023 | Water |
Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 23.3 GWh | Aug 2012 | Dec 2023 | Solar |
Arizona Western College PV | AES Distributed Energy | Yuma, AZ | Arizona Public Service Company (AZPS) | 5.6 GWh | Oct 2011 | Dec 2023 | Solar |
Rockland Wind Farm | Ridgeline Energy LLC | American Falls, ID | Idaho Power Company (IPCO) | 219.4 GWh | Nov 2011 | Dec 2023 | Wind |
Brown County Wind Turbine | Adams Electric Cooperative | Mount Sterling, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Aug 2011 | Dec 2023 | Wind |
Longwood Gardens | Ecogy Pennsylvania Systems LLC | Kennett Square, PA | PJM Interconnection, LLC (PJM) | 2.0 GWh | Apr 2010 | Dec 2023 | Solar |
Mehoopany Wind Energy LLC | AE Power Services LLC | Noxen, PA | PJM Interconnection, LLC (PJM) | 343.3 GWh | Nov 2012 | Dec 2023 | Wind |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.0 GWh | Jan 2013 | Dec 2023 | Landfill Gas |
Perdue Bridgeville Photovoltaic | Terraform Arcadia | Bridgeville, DE | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jun 2011 | Dec 2023 | Solar |
Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2023 | Solar |
Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 192.5 GWh | Jan 2012 | Dec 2023 | Wind |
FedEx Woodbridge | Scale Sustainable I, LLC | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2009 | Dec 2023 | Solar |
RE Dillard 1 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.2 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Dec 2011 | Dec 2023 | Solar |
RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.2 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2023 | Solar |
RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.2 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2023 | Solar |
RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.8 GWh | Dec 2011 | Dec 2023 | Solar |
RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.7 GWh | Jan 2012 | Dec 2023 | Solar |
RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.1 GWh | Jan 2012 | Dec 2023 | Solar |
Peak Power 1 Cogen | Peak Power 1, LLC | New York, NY | New York Independent System Operator (NYIS) | 21.4 GWh | Jun 2010 | Dec 2023 | Natural Gas |
RE Bagdad Solar I LLC | Duke Energy Renewables Services | Bagdad, AZ | Arizona Public Service Company (AZPS) | 31.7 GWh | Nov 2011 | Dec 2023 | Solar |
Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.9 GWh | Oct 2011 | Dec 2023 | Wind |
Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 391.0 MWh | Nov 2011 | Dec 2023 | Wind |
RE Ajo 1 LLC | Duke Energy Renewables Services | Ajo, AZ | Arizona Public Service Company (AZPS) | 9.1 GWh | Jul 2011 | Dec 2023 | Solar |
Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2012 | Dec 2023 | Solar |
Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2012 | Dec 2023 | Solar |
OBP Cogen | OBP Cogen LLC | New York, NY | New York Independent System Operator (NYIS) | 25.4 GWh | May 2010 | Dec 2023 | Natural Gas |
ISH Solar Central, LLC | SunEdison LLC | Bayville, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Sep 2011 | Dec 2023 | Solar |
Bison 2 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 236.8 GWh | Nov 2012 | Dec 2023 | Wind |
Bison 3 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 242.1 GWh | Nov 2012 | Dec 2023 | Wind |
Lime Wind | Lime Wind LLC | Huntington, OR | Idaho Power Company (IPCO) | 4.8 GWh | Nov 2011 | Dec 2023 | Wind |
William Paterson University | Nautilus Solar WPU LLC | Wayne, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2010 | Dec 2023 | Solar |
Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2011 | Dec 2023 | Natural Gas |
GL Wind | GL Wind LLC | Lewiston, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Nov 2011 | Dec 2023 | Wind |
Titusville Solar | Janssen Pharmaceutical Co | Titusville, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Aug 2010 | Dec 2023 | Solar |
RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
Middletown Coke Company, LLC | SunCoke Energy, Inc. | Middletown, OH | PJM Interconnection, LLC (PJM) | 333.0 GWh | Nov 2011 | Dec 2023 | Other Gas : 95.9% Natural Gas : 4.1% |
WCROC Wind Farm | University of Minnesota WCROC | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Feb 2005 | Dec 2023 | Wind |
Onalaska Campus Landfill Biogas | Gundersen Lutheran Biogas I LLC | Onalaska, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Feb 2012 | Dec 2023 | Landfill Gas |
Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2011 | Dec 2023 | Solar |
Tulsa LFG LLC | Tulsa LFG LLC | Sand Springs, OK | Southwest Power Pool (SWPP) | 16.7 GWh | Apr 2011 | Dec 2023 | Landfill Gas |
Rippey Wind Farm | Greenbacker Renewable Energy Corporation | Grand Junction, IA | Midcontinent Independent System Operator, Inc. (MISO) | 151.1 GWh | Jul 2012 | Dec 2023 | Wind |
Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2012 | Dec 2023 | Solar |
Hawkeye Wind Farm | Greenbacker Renewable Energy Corporation | Sumner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 97.1 GWh | Sep 2012 | Dec 2023 | Wind |
Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 248.1 GWh | Apr 2012 | Dec 2023 | Wind |
Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 248.3 GWh | Oct 2012 | Dec 2023 | Wind |
Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 186.4 GWh | Dec 2011 | Dec 2023 | Wind |
L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2012 | Dec 2023 | Solar |
Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 188.9 GWh | Oct 2012 | Dec 2023 | Wind |
Dartmouth II Solar | Consolidated Edison Development Inc. | Dartmouth, MA | ISO New England (ISNE) | 2.2 GWh | May 2012 | Dec 2023 | Solar |
Franklin County Wind Farm | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 236.2 GWh | Nov 2012 | Dec 2023 | Wind |
WC Landfill Energy LLC | MN8 Energy LLC | Oxford, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2006 | Dec 2023 | Solar |
Green Acres Solar Facility 1 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Aug 2012 | Dec 2023 | Solar |
Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Aug 2012 | Dec 2023 | Solar |
Ipswich Wind Turbine | Town of Ipswich - (MA) | Ipswich, MA | ISO New England (ISNE) | 3.1 GWh | Apr 2011 | Dec 2023 | Wind |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2008 | Dec 2023 | Solar |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 860.0 MWh | Mar 2012 | Dec 2023 | Solar |
Hidden Hollow Energy | Hidden Hollow Energy LLC | Boise, ID | Idaho Power Company (IPCO) | 24.0 GWh | Dec 2006 | Dec 2023 | Landfill Gas |
Wildcat Wind Farm I, LLC | RWE Renewables Americas, LLC | Elwood, IN | PJM Interconnection, LLC (PJM) | 649.9 GWh | Nov 2012 | Dec 2023 | Wind |
McKee City Solar Phase 2 | MN8 Energy LLC | Egg Harbor Township, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2011 | Dec 2023 | Solar |
Stockton Athletic Center | MN8 Energy LLC | Pomona, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
Antelope Station | Golden Spread Electric Cooperative, Inc | Abernathy, TX | Southwest Power Pool (SWPP) | 255.9 GWh | May 2011 | Dec 2023 | Natural Gas |
Golden Spread Panhandle Wnd Rch | Golden Spread Electric Cooperative, Inc | Wilderado, TX | Southwest Power Pool (SWPP) | 192.5 GWh | Aug 2011 | Dec 2023 | Wind |
Howard Wind Farm | Howard Wind LLC (Longroad) | Hornell, NY | New York Independent System Operator (NYIS) | 107.6 GWh | Nov 2011 | Dec 2023 | Wind |
L'Oreal Piscataway | MN8 Energy LLC | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2011 | Dec 2023 | Solar |
Heller Industrial Parks | Marina Energy LLC | Dayton, NJ | PJM Interconnection, LLC (PJM) | 8.0 GWh | Nov 2011 | Dec 2023 | Solar |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2023 | Solar |
LCEC Generation LLVC | Western Farmers Elec Coop, Inc | Lovington, NM | Southwest Power Pool (SWPP) | 44.1 GWh | Jan 2012 | Dec 2023 | Natural Gas |
Vienna Wind Farm | MidAmerican Energy Co | Marshalltown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 403.3 GWh | Oct 2012 | Dec 2023 | Wind |
Morning Light Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 351.7 GWh | Sep 2012 | Dec 2023 | Wind |
Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 10.0 GWh | Oct 2009 | Dec 2023 | Landfill Gas |
Perdue Salisbury Photovoltaic | Terraform Arcadia | Salisbury, MD | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2011 | Dec 2023 | Solar |
Eolos Wind Energy Research Field Station | Regents of the University of Minnesota | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2011 | Dec 2023 | Wind |
Pioneer Generation Station | Basin Electric Power Coop | Williston, ND | Southwest Power Pool (SWPP) | 1.5 TWh | Aug 2013 | Dec 2023 | Natural Gas |
Baldock Solar Highway | Portland General Electric Co | Aurora, OR | Portland General Electric Company (PGE) | 1.3 GWh | Dec 2011 | Dec 2023 | Solar |
Queen Creek Solar Farm | Siete Solar LLC | Queen Creek, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 46.4 GWh | Sep 2012 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |