Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
West County Energy Center | Florida Power & Light Co | Loxahatchee, FL | Florida Power & Light Co. (FPL) | 21.1 TWh | Jul 2009 | Aug 2024 | Natural Gas : 99.9% |
Watts Bar Nuclear Plant | Tennessee Valley Authority | Spring City, TN | Tennessee Valley Authority (TVA) | 19.1 TWh | Apr 1996 | Aug 2024 | Nuclear |
W A Parish | NRG Texas Power LLC | Thompsons, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 11.6 TWh | May 1958 | Aug 2024 | Subbituminous Coal : 80.6% Natural Gas : 19.4% |
Warren County | Virginia Electric & Power Co | Front Royal, VA | PJM Interconnection, LLC (PJM) | 9.2 TWh | Nov 2014 | Aug 2024 | Natural Gas |
Wolf Creek Generating Station | Wolf Creek Nuclear Optg Corp | Burlington, KS | Southwest Power Pool (SWPP) | 9.1 TWh | Aug 1985 | Aug 2024 | Nuclear |
Wansley Combined Cycle | Southern Power Co | Franklin, GA | Southern Company Services, Inc. - Trans (SOCO) | 8.3 TWh | May 2002 | Aug 2024 | Natural Gas |
Wolf Hollow II | Constellation Power, Inc | Granbury, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 7.2 TWh | May 2017 | Aug 2024 | Natural Gas |
Waterford Power, LLC | Waterford Power, LLC | Waterford, OH | PJM Interconnection, LLC (PJM) | 6.6 TWh | Jul 2003 | Aug 2024 | Natural Gas |
W S Lee | Duke Energy Carolinas, LLC | Williamston, SC | Duke Energy Carolinas (DUK) | 5.9 TWh | Feb 1951 | Aug 2024 | Natural Gas |
Walter Scott Jr Energy Center | MidAmerican Energy Co | Council Bluffs, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 TWh | Feb 1954 | Aug 2024 | Subbituminous Coal : 99.1% Distillate Fuel Oil : 0.7% |
Washington Energy Facility | Dynegy Washington Energy Facility | Beverly, OH | PJM Interconnection, LLC (PJM) | 5.2 TWh | May 2002 | Aug 2024 | Natural Gas |
West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 TWh | Apr 2020 | Aug 2024 | Natural Gas : 99.9% |
Waterford 3 | Entergy Louisiana LLC | Killona, LA | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 TWh | Aug 1985 | Aug 2024 | Nuclear |
Woodbridge Energy Center | Woodbridge Energy Center | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 4.2 TWh | Sep 2015 | Aug 2024 | Natural Gas |
Welsh | Southwestern Electric Power Co | Pittsburg, TX | Southwest Power Pool (SWPP) | 4.0 TWh | Feb 1977 | Aug 2024 | Subbituminous Coal : 99.8% |
Weston | Wisconsin Public Service Corp | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 TWh | Nov 1954 | Aug 2024 | Subbituminous Coal : 99.7% |
Wanapum | PUD No 2 of Grant County | Beverly, WA | Public Utility District No. 2 of Grant County, Washington (GCPD) | 3.9 TWh | May 1963 | Aug 2024 | Water |
Wise County Power LLC | Wise County Power Company LLC | Poolville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.8 TWh | Jun 2004 | Aug 2024 | Natural Gas |
Warrick | AGC Division of APGI Inc | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | Mar 1960 | Aug 2024 | Bituminous Coal : 98.9% Natural Gas : 1.1% |
Wells | PUD No 1 of Douglas County | Pateros, WA | PUD No. 1 of Douglas County (DOPD) | 3.4 TWh | Aug 1967 | Aug 2024 | Water |
West Phoenix | Arizona Public Service Co | Phoenix, AZ | Arizona Public Service Company (AZPS) | 3.4 TWh | Apr 1972 | Aug 2024 | Natural Gas |
Wildcat Point Generation Facility | Old Dominion Electric Coop | Conowingo, MD | PJM Interconnection, LLC (PJM) | 3.2 TWh | Mar 2018 | Aug 2024 | Natural Gas |
Winyah | South Carolina Public Service Authority | Georgetown, SC | South Carolina Public Service Authority (SC) | 3.2 TWh | Feb 1975 | Aug 2024 | Bituminous Coal : 99.5% |
Wansley Unit 9 | Municipal Electric Authority | Franklin, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.2 TWh | May 2004 | Aug 2024 | Natural Gas |
W H Sammis | Energy Harbor Generation LLC | Stratton, OH | PJM Interconnection, LLC (PJM) | 3.1 TWh | Jul 1959 | Jul 2023 | Bituminous Coal : 99.4% Distillate Fuel Oil : 0.6% |
Westbrook Energy Center Power Plant | Westbrook Energy Center | Westbrook, ME | ISO New England (ISNE) | 3.1 TWh | Apr 2001 | Aug 2024 | Natural Gas |
Wolf Hollow I LP | Wolf Hollow I Power, LLC | Granbury, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.0 TWh | Jul 2003 | Aug 2024 | Natural Gas |
Whiting Clean Energy | BP Alternative Energy | Whiting, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 TWh | Mar 2002 | Aug 2024 | Natural Gas |
White Bluff | Entergy Arkansas LLC | Redfield, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 TWh | Jul 1980 | Aug 2024 | Subbituminous Coal : 99.5% |
Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.4 TWh | Nov 1987 | Aug 2024 | Natural Gas : 83.9% Other Gas : 15.7% |
Wilson Dam | Tennessee Valley Authority | Muscle Shoals, AL | Tennessee Valley Authority (TVA) | 2.2 TWh | Aug 1925 | Aug 2024 | Water |
Wateree | Dominion Energy South Carolina, Inc | Eastover, SC | Dominion Energy South Carolina, Inc. (SCEG) | 2.1 TWh | Aug 1970 | Aug 2024 | Bituminous Coal : 99.2% Distillate Fuel Oil : 0.8% |
Wyodak | PacifiCorp | Gillette, WY | PacifiCorp East (PACE) | 1.9 TWh | Aug 1978 | Aug 2024 | Subbituminous Coal : 99.9% |
White Mesa Wind | White Mesa Wind, LLC | Ozona, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.8 TWh | Sep 2021 | Aug 2024 | Wind |
West Deptford Energy Station | West Deptford Energy LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 1.6 TWh | Sep 2014 | Aug 2024 | Natural Gas |
Westlake Plaquemine | Westlake Chemicals & Vinyls LLC | Plaquemine, LA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Apr 1997 | Aug 2024 | Natural Gas : 97.1% Other Gas : 2.9% |
Williams | South Carolina Genertg Co, Inc | Goose Creek, SC | Dominion Energy South Carolina, Inc. (SCEG) | 1.6 TWh | May 1972 | Aug 2024 | Bituminous Coal : 99.3% Distillate Fuel Oil : 0.6% |
Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.5 TWh | Jan 2006 | Aug 2024 | Natural Gas |
Waiau | Hawaiian Electric Co Inc | Pearl City, HI | 1.1 TWh | Nov 1947 | Aug 2024 | Residual Fuel Oil : 94.0% Distillate Fuel Oil : 6.0% | |
Western Plains Wind Farm | Evergy Kansas Central, Inc | Spearville, KS | Southwest Power Pool (SWPP) | 1.1 TWh | Feb 2017 | Aug 2024 | Wind |
Wilkes | Southwestern Electric Power Co | Avinger, TX | Southwest Power Pool (SWPP) | 1.1 TWh | Apr 1964 | Dec 2023 | Natural Gas |
West Lorain | Vermillion Power LLC | Lorain, OH | PJM Interconnection, LLC (PJM) | 1.1 TWh | May 1973 | Dec 2023 | Natural Gas : 99.9% |
Wheeler Dam | Tennessee Valley Authority | Town Creek, AL | Tennessee Valley Authority (TVA) | 1.1 TWh | Oct 1936 | Dec 2023 | Water |
Whelan Energy Center | City of Hastings - (NE) | Hastings, NE | Southwest Power Pool (SWPP) | 1.1 TWh | Jun 1981 | Aug 2024 | Subbituminous Coal : 99.7% |
West Valley Generation Project | Utah Municipal Power Agency | West Valley City, UT | PacifiCorp East (PACE) | 960.3 GWh | Sep 2001 | Aug 2024 | Natural Gas |
Wake Wind Energy Center | Southern Power Co | Floydada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 954.0 GWh | Sep 2016 | Dec 2023 | Wind |
Willow Springs Wind Farm | Willow Springs Windfarm, LLC | Weinert, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 906.6 GWh | Oct 2017 | Aug 2024 | Wind |
Western Trail Wind, LLC | Orsted Onshore North America | Electra, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 888.2 GWh | Mar 2022 | Aug 2024 | Wind |
White Cloud Wind Project, LLC | White Cloud Wind Project, LLC | Tarkio, MO | Associated Electric Cooperative, Inc. (AECI) | 873.2 GWh | Nov 2020 | Aug 2024 | Wind |
Washington County Cogeneration Facility | Alabama Power Co | McIntosh, AL | Southern Company Services, Inc. - Trans (SOCO) | 862.2 GWh | Jan 1999 | Dec 2023 | Natural Gas |
Watts Bar Hydro | Tennessee Valley Authority | Spring City, TN | Tennessee Valley Authority (TVA) | 812.4 GWh | Feb 1942 | Dec 2023 | Water |
Wygen III | Black Hills Power, Inc. | Gillette, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 794.7 GWh | Mar 2010 | Dec 2023 | Subbituminous Coal : 99.9% |
Whispering Willow North | Interstate Power and Light Co | Latimer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 787.7 GWh | Dec 2019 | Aug 2024 | Wind |
Walnut Ridge Wind Farm | BHE Renewables, LLC | Sheffield, IL | PJM Interconnection, LLC (PJM) | 749.6 GWh | Nov 2018 | Aug 2024 | Wind |
Waverly Wind Farm LLC | Waverly Wind Farm LLC | Waverly, KS | Southwest Power Pool (SWPP) | 712.0 GWh | Dec 2015 | Dec 2023 | Wind |
West Raymond Wind Farm LLC | RWE Renewables Americas, LLC | Lyford, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 709.7 GWh | Sep 2021 | Aug 2024 | Wind |
Wheatridge Hybrid | Wheatridge Wind Holdings, LLC | Morrow, OR | Bonneville Power Administration (BPAT) | 688.0 GWh | Oct 2020 | Aug 2024 | Wind : 81.1% Solar : 18.8% |
Wygen 2 | Black Hills Power, Inc. | Gillette, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 663.4 GWh | Dec 2007 | Dec 2023 | Subbituminous Coal : 99.8% |
Wildcat Ranch Wind Project | Wildcat Ranch Wind Project, LLC | Morton, TX | Southwest Power Pool (SWPP) | 663.2 GWh | Nov 2018 | Aug 2024 | Wind |
Wildcat Wind Farm I, LLC | RWE Renewables Americas, LLC | Elwood, IN | PJM Interconnection, LLC (PJM) | 649.9 GWh | Nov 2012 | Dec 2023 | Wind |
Wildorado Wind LLC | Wildorado Wind, LLC | Vega, TX | Southwest Power Pool (SWPP) | 643.2 GWh | Mar 2007 | Dec 2023 | Wind |
Wild Horse | Puget Sound Energy Inc | Ellensburg, WA | Puget Sound Energy, Inc. (PSEI) | 592.7 GWh | Nov 2006 | Aug 2024 | Wind : 99.9% |
Wildcat Creek Wind Farm LLC | Wildcat Creek Wind Farm LLC | Gainesville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 574.4 GWh | Jun 2021 | Aug 2024 | Wind |
Weatherford Wind Energy Center | FPL Energy Weatherford, LLC | Weatherford, OK | Southwest Power Pool (SWPP) | 571.7 GWh | Mar 2005 | Dec 2023 | Wind |
Windy Flats Wind Project | Windy Flats Partners LLC | Centerville, WA | Bonneville Power Administration (BPAT) | 567.8 GWh | Sep 2009 | Dec 2023 | Wind |
Walnut Wind Farm | MidAmerican Energy Co | Walnut, IA | Midcontinent Independent System Operator, Inc. (MISO) | 538.1 GWh | Nov 2008 | Dec 2023 | Wind |
Wygen 1 | Black Hills Power, Inc. | Gillette, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 535.0 GWh | Dec 2002 | Aug 2024 | Subbituminous Coal : 99.8% |
Wabash Valley Power IGCC | Wabash Valley Power Assn, Inc | Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 532.3 GWh | Nov 1953 | Aug 2024 | Natural Gas |
WestRock-West Point Mill | WestRock-West Point Mill | West Point, VA | PJM Interconnection, LLC (PJM) | 525.4 GWh | Dec 1953 | Aug 2024 | Black Liquor : 43.7% Natural Gas : 37.1% Wood/Wood Waste Solids : 14.9% Bituminous Coal : 2.4% Sludge Waste : 1.8% |
Walter Bouldin Dam | Alabama Power Co | Wetumpka, AL | Southern Company Services, Inc. - Trans (SOCO) | 514.5 GWh | Jun 1967 | Dec 2023 | Water |
Wyman Hydro | Brookfield White Pine Hydro LLC | Bingham, ME | ISO New England (ISNE) | 501.6 GWh | Dec 1929 | Dec 2023 | Water |
Waco Solar | Waco Solar, LLC | Mount Calm, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 495.4 GWh | - | Aug 2024 | Solar |
White Rock/Slab Creek | Sacramento Municipal Util Dist | Placerville, CA | Balancing Authority of Northern California (BANC) | 495.3 GWh | Jan 1968 | Aug 2024 | Water |
Western 102 Power Plant | Nevada Gold Mines | McCarran, NV | Nevada Power Company (NEVP) | 491.8 GWh | Nov 2005 | Aug 2024 | Natural Gas : 99.7% |
Wolf Creek | USCE-Nashville District | Jamestown, KY | Tennessee Valley Authority (TVA) | 470.5 GWh | Sep 1951 | Dec 2023 | Water |
Walleye Wind | Walleye Wind, LLC | Beaver Creek, MN | Midcontinent Independent System Operator, Inc. (MISO) | 464.0 GWh | Nov 2022 | Aug 2024 | Wind |
Whispering Willow Wind Farm - East | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 459.4 GWh | Nov 2009 | Dec 2023 | Wind |
Whitehorn | Puget Sound Energy Inc | Blaine, WA | Puget Sound Energy, Inc. (PSEI) | 449.0 GWh | Sep 1981 | Dec 2023 | Natural Gas : 99.9% |
White Creek Wind Farm | White Creek Wind 1 LLC | Roosevelt, WA | Bonneville Power Administration (BPAT) | 446.8 GWh | Oct 2007 | Dec 2023 | Wind |
Whiting Refinery | BP PLC | Whiting, IN | Midcontinent Independent System Operator, Inc. (MISO) | 445.2 GWh | Dec 1947 | Dec 2023 | Other Gas : 84.0% Natural Gas : 16.0% |
Wheelabrator Bridgeport | Wheelabrator Environmental Systems | Bridgeport, CT | ISO New England (ISNE) | 441.9 GWh | Jun 1988 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 441.8 GWh | Nov 2014 | Dec 2023 | Wind |
Wildhorse Mountain Wind Facility | Southern Power Co | Clayton, OK | Southwest Power Pool (SWPP) | 439.6 GWh | Nov 2019 | Aug 2024 | Wind |
Walter F George | USCE-Mobile District | Ft. Gaines, GA | Southern Company Services, Inc. - Trans (SOCO) | 426.4 GWh | Feb 1963 | Dec 2023 | Water |
Wheelabrator South Broward | Wheelabrator Environmental Systems | Ft. Lauderdale, FL | Florida Power & Light Co. (FPL) | 413.1 GWh | Mar 1991 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Westrock Hodge (LA) | Westrock (LA) | Hodge, LA | Midcontinent Independent System Operator, Inc. (MISO) | 412.2 GWh | Nov 1952 | Dec 2023 | Black Liquor : 48.0% Natural Gas : 37.4% Wood/Wood Waste Solids : 14.5% |
WestRock (TX) | WestRock (TX) | Evadale, TX | Midcontinent Independent System Operator, Inc. (MISO) | 406.8 GWh | May 1954 | Dec 2023 | Black Liquor : 57.4% Wood/Wood Waste Solids : 24.4% Natural Gas : 18.1% |
Wheelabrator Westchester | Wheelabrator Environmental Systems | Peekskill, NY | New York Independent System Operator (NYIS) | 401.0 GWh | Sep 1984 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
White Oak Energy LLC | White Oak Energy LLC | Carlock, IL | Midcontinent Independent System Operator, Inc. (MISO) | 394.3 GWh | May 2011 | Dec 2023 | Wind |
Wolf Ridge Wind | NextEra Wolf Ridge LLC | Muenster, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 375.6 GWh | Jul 2008 | Dec 2023 | Wind |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 370.5 GWh | Nov 2019 | Aug 2024 | Solar |
Willow Creek Wind Power LLC | Willow Creek Wind Power LLC | Newell, SD | Southwest Power Pool (SWPP) | 367.6 GWh | Aug 2020 | Aug 2024 | Wind |
Woodland Pulp, LLC | Woodland Pulp LLC | Baileyville, ME | (NBSO) | 366.6 GWh | May 1906 | Dec 2023 | Black Liquor : 41.9% Natural Gas : 33.3% Water : 17.5% Wood/Wood Waste Solids : 7.3% |
West Campus Cogeneration Facility | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 353.0 GWh | Mar 2005 | Dec 2023 | Natural Gas |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 336.7 GWh | Mar 2013 | Aug 2024 | Natural Gas |
Walters | Duke Energy Progress - (NC) | Waterville, NC | Duke Energy Progress East (CPLE) | 321.0 GWh | Jun 1930 | Dec 2023 | Water |
Wheelabrator Baltimore Refuse | Wheelabrator Environmental Systems | Baltimore, MD | PJM Interconnection, LLC (PJM) | 320.5 GWh | Oct 1984 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Wheelabrator Millbury Facility | Wheelabrator Environmental Systems | Millbury, MA | ISO New England (ISNE) | 319.9 GWh | Aug 1987 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Wheelabrator Falls | Wheelabrator Environmental Systems | Morrisville, PA | PJM Interconnection, LLC (PJM) | 313.8 GWh | Apr 1994 | Aug 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
Woodsdale | Duke Energy Kentucky Inc | Trenton, OH | PJM Interconnection, LLC (PJM) | 302.0 GWh | Apr 1992 | Aug 2024 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |