Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
G G Allen | Duke Energy Carolinas, LLC | Belmont, NC | Duke Energy Carolinas (DUK) | 179.0 GWh | May 1957 | Aug 2024 | Bituminous Coal : 98.2% Distillate Fuel Oil : 1.8% |
G.S.E. One LLC | GSEone | Bonham, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 162.5 GWh | Aug 2021 | Aug 2024 | Solar |
Gadsby | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 366.2 GWh | Aug 1951 | Aug 2024 | Natural Gas |
Gallatin (TN) | Tennessee Valley Authority | Gallatin, TN | Tennessee Valley Authority (TVA) | 3.6 TWh | Oct 1956 | Aug 2024 | Subbituminous Coal : 87.4% Bituminous Coal : 10.5% Natural Gas : 1.8% |
Galloway 1 Solar Farm | 225DD 8me LLC | Paint Rock, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 496.6 GWh | Sep 2021 | Aug 2024 | Solar |
Galloway 2 Solar Farm | 224WB 8me LLC | Paint Rock, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 206.0 GWh | Sep 2023 | Aug 2024 | Solar |
Ganado Solar | Enel Green Power NA, Inc. | Gail, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 288.0 GWh | Sep 2023 | Aug 2024 | Solar : 99.9% |
Garden Wind LLC | Garden Wind LLC | Zearing, IA | Midcontinent Independent System Operator, Inc. (MISO) | 374.8 GWh | Nov 2009 | Aug 2024 | Wind |
Garland Canal Power Plant | Shoshone Irrigation District | Powell, WY | PacifiCorp East (PACE) | 10.1 GWh | Aug 1983 | Aug 2024 | Water |
Garrison Energy Center LLC | Garrison Energy Center LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 736.7 GWh | May 2015 | Aug 2024 | Natural Gas : 99.9% |
Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Mar 1997 | Aug 2024 | Blast Furnace Gas : 50.1% Natural Gas : 49.9% |
Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 32.8 GWh | May 1985 | Aug 2024 | Other Biomass Gas |
Gaston | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 312.0 GWh | Jan 1963 | Aug 2024 | Water |
Gaston Memorial Hospital | City of Gastonia | Gastonia, NC | Duke Energy Carolinas (DUK) | 39.0 MWh | Apr 2006 | Aug 2024 | Distillate Fuel Oil |
Gaston Solar Power Plant | Duke Energy Carolinas, LLC | Cherryville Township, NC | Duke Energy Carolinas (DUK) | 48.1 GWh | Nov 2020 | Aug 2024 | Solar |
Gateway Generating Station | Pacific Gas & Electric Co. | Antioch, CA | California Independent System Operator (CISO) | 2.9 TWh | Dec 2008 | Aug 2024 | Natural Gas |
Gavin Power, LLC | Gavin Power, LLC | Cheshire, OH | PJM Interconnection, LLC (PJM) | 13.0 TWh | Sep 1974 | Aug 2024 | Bituminous Coal : 99.7% |
Gaylord Container Bogalusa | Temple-Inland Corp | Bogalusa, LA | Midcontinent Independent System Operator, Inc. (MISO) | 406.1 GWh | May 1979 | Aug 2024 | Black Liquor : 57.5% Wood/Wood Waste Solids : 35.6% Natural Gas : 6.9% |
Gemini Solar | Gemini Solar | Unincorporated, NV | Nevada Power Company (NEVP) | 1.0 TWh | - | Aug 2024 | Solar |
General Chemical | Tata Chemicals Partners | Green River, WY | PacifiCorp East (PACE) | 220.4 GWh | Apr 1968 | Aug 2024 | Bituminous Coal : 72.4% Natural Gas : 27.6% |
General Electric Aircraft Engines | General Electric Aircraft Engines | Lynn, MA | ISO New England (ISNE) | 2.3 GWh | Dec 1947 | Aug 2024 | Solar |
General Electric Diesel Engine Plant | General Electric Co | Grove City, PA | PJM Interconnection, LLC (PJM) | 5.4 GWh | May 1984 | Aug 2024 | Distillate Fuel Oil |
Geneseo | City of Geneseo - (IL) | Geneseo, IL | Midcontinent Independent System Operator, Inc. (MISO) | 7.5 GWh | Jun 1957 | Aug 2024 | Wind : 73.9% Solar : 20.9% Distillate Fuel Oil : 5.1% |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 609.1 GWh | Oct 2013 | Aug 2024 | Solar |
George Birdsall | City of Colorado Springs - (CO) | Colorado Springs, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 5.9 GWh | Jul 1953 | Aug 2024 | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
George Neal North | MidAmerican Energy Co | Sergeant Bluff, IA | Midcontinent Independent System Operator, Inc. (MISO) | 873.1 GWh | Apr 1964 | Aug 2024 | Subbituminous Coal : 98.5% Natural Gas : 1.5% |
George Neal South | MidAmerican Energy Co | Salix, IA | Midcontinent Independent System Operator, Inc. (MISO) | 776.5 GWh | Jun 1979 | Aug 2024 | Subbituminous Coal : 98.5% Distillate Fuel Oil : 1.5% |
Georgia Mountain Community Wind Farm | Greenbacker Renewable Energy Corporation | Milton, VT | ISO New England (ISNE) | 25.3 GWh | Nov 2012 | Aug 2024 | Wind |
Georgia-Pacific Big Island | GP Big Island LLC | Big Island, VA | PJM Interconnection, LLC (PJM) | 53.8 GWh | May 1920 | Aug 2024 | Natural Gas : 62.6% Wood/Wood Waste Solids : 24.4% Black Liquor : 9.2% Other Biomass Solids : 3.5% |
Georgia-Pacific Cedar Springs | Georgia-Pacific Cedar Springs LLC | Cedar Springs, GA | Southern Company Services, Inc. - Trans (SOCO) | 573.3 GWh | Sep 1963 | Aug 2024 | Black Liquor : 47.1% Wood/Wood Waste Solids : 23.7% Bituminous Coal : 16.1% Natural Gas : 8.6% Residual Fuel Oil : 2.4% Distillate Fuel Oil : 2.1% |
Georgia-Pacific Consr Prods LP-Naheola | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | Southern Company Services, Inc. - Trans (SOCO) | 258.8 GWh | Jul 1959 | Aug 2024 | Black Liquor : 61.1% Wood/Wood Waste Solids : 22.5% Natural Gas : 16.3% |
Georgia-Pacific Corp - Nekoosa Mill | Domtar Industries Inc | Nekoosa, WI | Midcontinent Independent System Operator, Inc. (MISO) | 173.0 GWh | Dec 1911 | Aug 2024 | Black Liquor : 44.0% Natural Gas : 41.9% Water : 14.1% |
Georgia-Pacific Muskogee | Georgia-Pacific Muskogee LLC | Muskogee, OK | Southwest Power Pool (SWPP) | 373.6 GWh | Feb 1978 | Aug 2024 | Natural Gas : 90.5% Subbituminous Coal : 9.2% |
Georgia-Pacific Wauna Mill | Georgia-Pacific Consumer Operations LLC-Wauna | Clatskanie, OR | Bonneville Power Administration (BPAT) | 181.3 GWh | Jan 1996 | Aug 2024 | Black Liquor : 53.9% Natural Gas : 35.1% Other Biomass Solids : 11.0% |
Geothermal 1 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 254.1 GWh | Dec 1982 | Aug 2024 | Geothermal |
Geothermal 2 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 279.8 GWh | Nov 1985 | Aug 2024 | Geothermal |
Gerald Gentleman | Nebraska Public Power District | Sutherland, NE | Southwest Power Pool (SWPP) | 6.7 TWh | Mar 1979 | Aug 2024 | Subbituminous Coal : 99.5% Natural Gas : 0.5% |
Geysers Unit 5-20 | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 4.4 TWh | Mar 1971 | Aug 2024 | Geothermal |
Ghent | Kentucky Utilities Co | Ghent, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 9.8 TWh | Jan 1974 | Aug 2024 | Bituminous Coal : 99.9% |
Ghost Orchid Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 137.1 GWh | Dec 2021 | Aug 2024 | Solar |
Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.7 TWh | Mar 1975 | Aug 2024 | Bituminous Coal : 99.7% |
Gila River Power Block 1 | Salt River Project | Gila Bend, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 2.8 TWh | Apr 2003 | Aug 2024 | Natural Gas |
Gila River Power Block 2 | Salt River Project | Gila Bend, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 3.4 TWh | May 2003 | Aug 2024 | Natural Gas |
Gila River Power Block 3 | Salt River Project | Gila Bend, AZ | Tucson Electric Power (TEPC) | 2.6 TWh | May 2003 | Aug 2024 | Natural Gas |
Gila River Power Block 4 | Salt River Project | Gila Bend, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 2.1 TWh | Apr 2003 | Aug 2024 | Natural Gas |
Gillette SBMC | The Gillette Company | Boston, MA | ISO New England (ISNE) | 61.0 GWh | Jan 1971 | Aug 2024 | Natural Gas : 99.9% |
Glacier Hills | Wisconsin Electric Power Co | Cambria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 361.1 GWh | Nov 2011 | Aug 2024 | Wind |
Glacier Sands Wind Power, LLC | Glacier Sands Wind Power, LLC | Mason City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 629.3 GWh | Oct 2021 | Aug 2024 | Wind |
Glaciers Edge Wind Project | EDF Renewable Asset Holdings, Inc. | Cleghorn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 856.1 GWh | Nov 2019 | Aug 2024 | Wind |
Glass Sands Wind Facility | Southern Power Co | Sulphur, OK | Southwest Power Pool (SWPP) | 449.9 GWh | Oct 2021 | Aug 2024 | Wind |
Glen Canyon Dam | U S Bureau of Reclamation | Page, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 2.8 TWh | Aug 1964 | Aug 2024 | Water |
Glen Ullin Energy Center | ALLETE Clean Energy | Glen Ullin, ND | Midcontinent Independent System Operator, Inc. (MISO) | 434.9 GWh | Nov 2019 | Aug 2024 | Wind |
Glover Creek Solar, LLC | Glover Creek Solar, LLC | Summer Shade, KY | PJM Interconnection, LLC (PJM) | 31.8 GWh | - | Aug 2024 | Solar |
GMP Solar - Hartford | Green Mountain Power Corp | Hartford, VT | ISO New England (ISNE) | 7.4 GWh | Nov 2016 | Aug 2024 | Solar |
GMP Solar - Panton Hybrid | Green Mountain Power Corp | Panton, VT | ISO New England (ISNE) | 8.0 GWh | Nov 2016 | Aug 2024 | Solar : 97.0% Electricity used for energy storage : 3.0% |
GMP Solar - Richmond | Green Mountain Power Corp | Richmond, VT | ISO New England (ISNE) | 2.7 GWh | Sep 2016 | Aug 2024 | Solar |
GMP Solar/Storage-Essex Hybrid | Green Mountain Power Corp | Essex, VT | ISO New England (ISNE) | 7.4 GWh | Aug 2019 | Aug 2024 | Solar : 90.9% Electricity used for energy storage : 9.1% |
GMP Solar/Storage-Ferrisburgh Hybrid | Green Mountain Power Corp | Ferrisburgh, VT | ISO New England (ISNE) | 8.7 GWh | Aug 2019 | Aug 2024 | Solar : 90.7% Electricity used for energy storage : 9.3% |
GMP Solar/Storage-Milton Hybrid | Green Mountain Power Corp | Milton, VT | ISO New England (ISNE) | 8.3 GWh | Aug 2019 | Aug 2024 | Solar : 91.0% Electricity used for energy storage : 9.0% |
GMP Solar - Williamstown | Green Mountain Power Corp | Williamstown, VT | ISO New England (ISNE) | 7.0 GWh | Nov 2016 | Aug 2024 | Solar |
GMP Solar - Williston | Green Mountain Power Corp | Williston, VT | ISO New England (ISNE) | 6.6 GWh | Oct 2016 | Aug 2024 | Solar |
Goal Line LP | Goal Line LP | Escondido, CA | California Independent System Operator (CISO) | 10.2 GWh | Jul 1994 | Aug 2024 | Natural Gas |
Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.3 GWh | Jun 2014 | Aug 2024 | Wind |
Golden Field Solar III, LLC | Golden Field Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 509.2 GWh | Nov 2020 | Aug 2024 | Solar |
Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 139.7 GWh | Nov 2016 | Aug 2024 | Solar |
Golden Hill Wind | Avangrid Renewables LLC | Wasco, OR | Avangrid Renewables, LLC (AVRN) | 584.0 GWh | Mar 2022 | Aug 2024 | Wind |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 127.1 GWh | Oct 2017 | Aug 2024 | Wind |
Golden Plains | Interstate Power and Light Co | Buffalo Center, IA | Midcontinent Independent System Operator, Inc. (MISO) | 744.5 GWh | Feb 2020 | Aug 2024 | Wind |
Golden West Power Partners LLC | Golden West Power Partners, LLC | Calhan, CO | Public Service Company of Colorado (PSCO) | 803.4 GWh | Sep 2015 | Aug 2024 | Wind |
Goodnight | FGE Goodnight I, LLC | Claude, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 334.8 GWh | - | Aug 2024 | Wind |
Goodsprings Waste Heat Recovery | Nevada Power Co | Jean, NV | Nevada Power Company (NEVP) | 22.2 GWh | Oct 2010 | Aug 2024 | Waste Heat |
Goodwell Wind Project LLC | Enel Green Power NA, Inc. | Goodwell, OK | Southwest Power Pool (SWPP) | 719.3 GWh | Nov 2015 | Aug 2024 | Wind |
Goodyear Beaumont Chemical Plant | Goodyear Tire & Rubber Co | Beaumont, TX | Midcontinent Independent System Operator, Inc. (MISO) | 277.9 GWh | Feb 1987 | Aug 2024 | Natural Gas : 98.8% Waste/Other Oil : 1.2% |
Gopher Creek Wind Farm | Fluvanna Wind Energy 2 LLC | Fluvanna, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 618.0 GWh | Aug 2019 | Aug 2024 | Wind |
Gordon Evans Energy Center | Evergy Kansas South, Inc | Colwich, KS | Southwest Power Pool (SWPP) | 423.9 GWh | May 1961 | Aug 2024 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
Gorge | City of Seattle - (WA) | Rockport, WA | Seattle City Light (SCL) | 676.4 GWh | Aug 1924 | Aug 2024 | Water |
Grady Wind Energy Center, LLC | Pattern Operators LP | Clovis, NM | Public Service Company of New Mexico (PNM) | 866.9 GWh | Jul 2019 | Aug 2024 | Wind |
Granby Hydro | Northern Water Hydropower Enterprise | Granby, CO | Public Service Company of Colorado (PSCO) | 5.0 GWh | Apr 2016 | Aug 2024 | Water |
Grand Ave Plant | Veolia Energy Kansas City | Kansas City, MO | Southwest Power Pool (SWPP) | 39.3 GWh | Jun 1991 | Aug 2024 | Natural Gas |
Grand Coulee | U S Bureau of Reclamation | Grand Coulee, WA | Bonneville Power Administration (BPAT) | 15.0 TWh | Feb 1941 | Aug 2024 | Water |
Grand Gulf | System Energy Resources, Inc | Port Gibson, MS | Midcontinent Independent System Operator, Inc. (MISO) | 10.6 TWh | Jun 1985 | Aug 2024 | Nuclear |
Grand Ridge Solar Farm | Invenergy Services LLC | Marseilles, IL | PJM Interconnection, LLC (PJM) | 25.4 GWh | Jun 2012 | Aug 2024 | Solar |
Grand Valley Solar Gardens | Consumers Energy Co - (MI) | Allendale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Mar 2016 | Aug 2024 | Solar |
Grand View Solar Two | Grand View PV Solar Two, LLC | Grand View, ID | Idaho Power Company (IPCO) | 178.0 GWh | Nov 2016 | Aug 2024 | Solar |
Grande Prairie Wind Farm | BHE Renewables, LLC | O'Neill, NE | Southwest Power Pool (SWPP) | 1.0 TWh | Nov 2016 | Aug 2024 | Wind |
Grandview Wind Farm, LLC | RWE Renewables Americas, LLC | Panhandle, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 908.6 GWh | Nov 2014 | Aug 2024 | Wind |
Grange Hall Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 103.3 GWh | Dec 2018 | Aug 2024 | Solar |
Granite City Works | United States Steel Granite City Works | Granite City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 506.8 GWh | May 2010 | Aug 2024 | Natural Gas : 50.4% Purchased Steam : 49.2% |
Granite Mountain Solar East, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 211.2 GWh | Aug 2016 | Aug 2024 | Solar |
Granite Mountain Solar West, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 127.8 GWh | Aug 2016 | Aug 2024 | Solar |
Granite Reliable Power | NexteraEnergy | Dummer, NH | ISO New England (ISNE) | 176.0 GWh | Jan 2012 | Aug 2024 | Wind |
Granite Ridge | Granite Ridge Energy LLC | Londonderry, NH | ISO New England (ISNE) | 3.2 TWh | Feb 2003 | Aug 2024 | Natural Gas |
Grant County | Wisconsin Power & Light Co | Town of Potosi, WI | Midcontinent Independent System Operator, Inc. (MISO) | 102.0 GWh | - | Aug 2024 | Solar |
Grant Plains Wind, LLC | Southern Power Co | Medford, OK | Southwest Power Pool (SWPP) | 546.3 GWh | Nov 2016 | Aug 2024 | Wind |
Graphite Solar I | Greenbacker Renewable Energy Corporation | Wellington, UT | PacifiCorp East (PACE) | 189.3 GWh | May 2022 | Aug 2024 | Solar |
Grasshopper Solar | Dominion Energy Inc. | Chase City, VA | PJM Interconnection, LLC (PJM) | 129.1 GWh | Aug 2020 | Aug 2024 | Solar |
Gratiot Farms Wind Project | Consumers Energy Co - (MI) | Carson City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 359.0 GWh | Nov 2020 | Aug 2024 | Wind |
Gratiot Wind Park | DTE Electric Company | Breckenridge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 202.3 GWh | Oct 2011 | Aug 2024 | Wind |
Gray Hawk Solar | Gray Hawk Solar, LLC | Kingman, AZ | Tucson Electric Power (TEPC) | 138.8 GWh | May 2018 | Aug 2024 | Solar |
Grays Harbor Energy Facility | Invenergy Services LLC | Elma, WA | Bonneville Power Administration (BPAT) | 3.2 TWh | Apr 2008 | Aug 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |