Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
E B Harris Electric Generating Plant | Southern Power Co | Autaugaville, AL | Southern Company Services, Inc. - Trans (SOCO) | 5.1 TWh | May 2003 | Feb 2025 | Natural Gas |
E C Gaston | Alabama Power Co | Wilsonville, AL | Southern Company Services, Inc. - Trans (SOCO) | 3.7 TWh | Apr 1960 | Feb 2025 | Bituminous Coal : 56.4% Natural Gas : 43.5% |
E F Barrett | National Grid Generation LLC | Island Park, NY | New York Independent System Operator (NYIS) | 1.3 TWh | Oct 1956 | Feb 2025 | Natural Gas : 98.8% Residual Fuel Oil : 0.9% |
E W Brown | Kentucky Utilities Co | Harrodsburg, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 1.6 TWh | Apr 1957 | Feb 2025 | Bituminous Coal : 85.5% Natural Gas : 13.5% Solar : 0.9% |
Eagle Pass | Maverick Cty Water Control & Improvement | Eagle Pass, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 33.3 GWh | Jul 1932 | Feb 2025 | Water |
Eagle Shadow Mountain Solar Farm | 325MK 8me LLC | Moapa River Indian Re, NV | Nevada Power Company (NEVP) | 924.5 GWh | Apr 2023 | Feb 2025 | Solar |
Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 TWh | Nov 1951 | Feb 2025 | Natural Gas |
Earp Solar, LLC | Birch Creek Power, LLC | Monmouth, IL | Midcontinent Independent System Operator, Inc. (MISO) | 43.7 GWh | - | Feb 2025 | Solar |
East Bend | Duke Energy Kentucky Inc | Union, KY | PJM Interconnection, LLC (PJM) | 2.3 TWh | Feb 1981 | Feb 2025 | Bituminous Coal : 99.5% |
East Blackland Solar Project 1 | Duke Energy Renewables Services | Manor, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 258.7 GWh | Jun 2021 | Feb 2025 | Solar |
East Campus Steam Plant | Penn State University | University Park, PA | PJM Interconnection, LLC (PJM) | 45.5 GWh | May 2011 | Feb 2025 | Natural Gas : 99.9% |
East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 155.8 MWh | Jun 2006 | Feb 2025 | Distillate Fuel Oil |
East Fork Wind Project, LLC | Engie North America | Colby, KS | Southwest Power Pool (SWPP) | 738.9 GWh | Feb 2020 | Feb 2025 | Wind |
East Kansas Agri-Energy, LLC | East Kansas Agri-Energy, LLC | Garnett, KS | Southwest Power Pool (SWPP) | 5.0 GWh | May 2005 | Feb 2025 | Waste Heat |
East Line Solar | AES Distributed Energy | Coolidge, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 248.0 GWh | Nov 2020 | Feb 2025 | Solar |
East Pecos Solar | Southern Power Co | McCamey, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 242.3 GWh | Mar 2017 | Feb 2025 | Solar |
East Point Energy Center, LLC | East Point Energy Center, LLC | Sharon Springs, NY | New York Independent System Operator (NYIS) | 67.3 GWh | - | Feb 2025 | Solar |
East River | Consolidated Edison Co-NY Inc | New York, NY | New York Independent System Operator (NYIS) | 2.9 TWh | Oct 1951 | Feb 2025 | Natural Gas |
Eastern Correctional Institute | Maryland Environmental Service | Westover, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Jul 1987 | Feb 2025 | Natural Gas : 99.6% |
Eastern Maine Medical Center | Eastern Maine Medical Center | Bangor, ME | ISO New England (ISNE) | 31.2 GWh | Sep 2006 | Feb 2025 | Natural Gas |
Eastern Shore Solar, LLC | Dominion Renewable Energy | Oak Hall, VA | PJM Interconnection, LLC (PJM) | 140.2 GWh | Sep 2016 | Feb 2025 | Solar |
Eastman Cogeneration Facility | Eastman Cogeneration LP | Longview, TX | Southwest Power Pool (SWPP) | 2.8 TWh | Mar 2001 | Feb 2025 | Natural Gas |
Eastover Solar | Eastover Solar, LLC | Eastover, SC | Duke Energy Progress East (CPLE) | 142.4 GWh | Feb 2023 | Feb 2025 | Solar |
Echo River Solar | Florida Power & Light Co | Live Oak, FL | Florida Power & Light Co. (FPL) | 146.5 GWh | Mar 2020 | Feb 2025 | Solar |
Echo Wind Park | DTE Electric Company | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 582.7 GWh | Dec 2013 | Feb 2025 | Wind |
Eclipse Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 871.5 GWh | Aug 2012 | Feb 2025 | Wind |
Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 TWh | Jun 1951 | Feb 2025 | Subbituminous Coal : 99.9% |
Edward C Hyatt | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 2.4 TWh | Feb 1968 | Feb 2025 | Water |
Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 331.3 GWh | Jul 2022 | Feb 2025 | Solar |
Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 344.8 GWh | Oct 2022 | Feb 2025 | Solar |
Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 297.2 GWh | Nov 2021 | Feb 2025 | Solar |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 51.0 GWh | Nov 2021 | Feb 2025 | Solar |
Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 300.4 GWh | Nov 2022 | Feb 2025 | Solar |
Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 133.6 GWh | Nov 2022 | Feb 2025 | Solar |
Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 93.3 GWh | Feb 2022 | Feb 2025 | Solar |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.1 GWh | Feb 2022 | Feb 2025 | Solar |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 74.0 GWh | Oct 2022 | Feb 2025 | Solar |
Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 TWh | May 2013 | Feb 2025 | Natural Gas : 46.5% Coal-Derived Synthesis Gas : 45.6% Bituminous Coal : 7.9% |
Edwin I Hatch | Georgia Power Co | Baxley, GA | Southern Company Services, Inc. - Trans (SOCO) | 14.1 TWh | Nov 1975 | Feb 2025 | Nuclear |
EE Waianae Solar Project | EE Waianae Solar Project LLC | Waianae, HI | (HECO) | 48.2 GWh | Dec 2016 | Feb 2025 | Solar |
Effingham Energy Facility | Oglethorpe Power Corporation | Rincon, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.8 TWh | Jul 2003 | Feb 2025 | Natural Gas |
Egret Solar Center | Florida Power & Light Co | Glen St. Mary, FL | Florida Power & Light Co. (FPL) | 136.1 GWh | Nov 2020 | Feb 2025 | Solar |
Eiffel Solar Project | Paris Farm Solar, LLC | Paris, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 558.1 GWh | Oct 2023 | Feb 2025 | Solar |
Eight Point Wind | Eight Point Wind, LLC | Rexville, NY | New York Independent System Operator (NYIS) | 277.7 GWh | Jan 2023 | Feb 2025 | Wind |
Ekola Flats | PacifiCorp | Hanna, WY | PacifiCorp East (PACE) | 773.0 GWh | Nov 2020 | Feb 2025 | Wind |
El Algodon Alto Wind Farm, LLC | El Algodon Alto Wind Farm, LLC | Mathis, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 622.8 GWh | Apr 2022 | Feb 2025 | Wind |
El Cabo Wind | Avangrid Renewables LLC | Encino, NM | Public Service Company of New Mexico (PNM) | 1.1 TWh | Nov 2017 | Feb 2025 | Wind |
El Campo Wind | El Campo Wind, LLC (Longroad) | Truscott, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 778.5 GWh | Nov 2020 | Feb 2025 | Wind |
El Centro Hybrid | Imperial Irrigation District | El Centro, CA | Imperial Irrigation District (IID) | 1.0 TWh | Jul 1952 | Feb 2025 | Natural Gas |
El Dorado Refinery | Frontier El Dorado Refinery LLC | El Dorado, KS | Southwest Power Pool (SWPP) | 218.6 GWh | Dec 1995 | Feb 2025 | Natural Gas |
El Sauz Ranch Wind, LLC | El Sauz Ranch Wind, LLC | San Perlita, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 154.2 GWh | - | Feb 2025 | Wind |
El Segundo Cogen | Chevron USA Inc-El Segundo | El Segundo, CA | California Independent System Operator (CISO) | 1.3 TWh | Nov 1987 | Feb 2025 | Natural Gas : 99.7% |
El Segundo Energy Center LLC | El Segundo Energy Center, LLC | El Segundo, CA | California Independent System Operator (CISO) | 138.8 GWh | Jun 2013 | Feb 2025 | Natural Gas |
Eland Solar & Storage Center, Phase 1 Hybrid | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 155.5 GWh | - | Feb 2025 | Solar |
Elara Solar | Lightsource Renewable Energy Asset Management, LLC | Pearsall, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 240.1 GWh | Nov 2021 | Feb 2025 | Solar |
Elder Branch | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 164.6 GWh | Dec 2021 | Feb 2025 | Solar |
Eldorado Solar I | Sol Systems | Saline County, IL | 26.5 GWh | - | Feb 2025 | Solar | |
Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 263.4 GWh | May 1948 | Feb 2025 | Water |
Elektron Solar, LLC | Elektron Solar, LLC | Grantsville, UT | PacifiCorp East (PACE) | 145.4 GWh | - | Feb 2025 | Solar |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 101.9 GWh | Nov 2016 | Feb 2025 | Solar |
Eleven Mile Solar Center | Eleven Mile Solar Center, LLC | Coolidge, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 477.4 GWh | - | Feb 2025 | Solar |
Elizabeth Solar Plant | Horus Louisiana 1, LLC | Pitkin, LA | Midcontinent Independent System Operator, Inc. (MISO) | 138.5 GWh | - | Feb 2025 | Solar |
Elk City LLC | Elk City LLC | Sweetwater, OK | Southwest Power Pool (SWPP) | 492.6 GWh | Nov 2009 | Feb 2025 | Wind |
Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 76.3 GWh | Oct 1994 | Feb 2025 | Natural Gas |
Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 2.4 TWh | Jun 2003 | Feb 2025 | Natural Gas |
Ellis Solar LLC | 174 Power Global Corp. | Midlothian, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 154.3 GWh | Sep 2023 | Feb 2025 | Solar |
Elm Branch Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Bardwell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 261.8 GWh | Nov 2021 | Feb 2025 | Solar |
Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 TWh | Jan 2010 | Feb 2025 | Subbituminous Coal : 72.0% Bituminous Coal : 17.7% Natural Gas : 10.3% |
Elora Solar | Elora Solar | Elora, TN | Tennessee Valley Authority (TVA) | 307.0 GWh | Feb 2022 | Feb 2025 | Solar |
Emerald Grove | Luminant Generation Company LLC | Crane, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 276.2 GWh | Feb 2023 | Feb 2025 | Solar |
Emery Station | Interstate Power and Light Co | Clear Lake, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 TWh | Apr 2004 | Feb 2025 | Natural Gas |
Emmitsburg Solar Arrays | UGI Energy Services, LLC | Emmitsburg, MD | PJM Interconnection, LLC (PJM) | 2.5 GWh | Mar 2014 | Feb 2025 | Solar |
Emmons-Logan Wind, LLC | Emmons-Logan Wind, LLC | Linton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 920.8 GWh | Nov 2019 | Feb 2025 | Wind |
Empire Generating Co LLC | Empire Generating Co LLC | Rensselaer, NY | New York Independent System Operator (NYIS) | 2.9 TWh | Aug 2010 | Feb 2025 | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
Emporia Energy Center | Evergy Kansas Central, Inc | Emporia, KS | Southwest Power Pool (SWPP) | 1.4 TWh | May 2008 | Feb 2025 | Natural Gas |
Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 14.1 GWh | Oct 2008 | Feb 2025 | Other Biomass Gas : 96.0% Natural Gas : 4.0% |
Encino Solar Energy Center | NMRD Data Center, LLC | Rio Rancho Estates, NM | Public Service Company of New Mexico (PNM) | 143.8 GWh | Jun 2020 | Feb 2025 | Solar |
Encogen | Puget Sound Energy Inc | Bellingham, WA | Puget Sound Energy, Inc. (PSEI) | 604.4 GWh | Feb 1993 | Feb 2025 | Natural Gas |
Energy Center Dover | Cartier Energy, LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 119.9 GWh | Apr 1985 | Feb 2025 | Natural Gas : 99.8% |
ENGIE Long Draw Solar LLC | Engie North America | Gail, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 526.8 GWh | Nov 2020 | Feb 2025 | Solar |
ENGIE Solidago Solar Project - Hybrid | ENGIE Solidago Solar LLC | Townsend, DE | PJM Interconnection, LLC (PJM) | 99.1 GWh | Nov 2022 | Feb 2025 | Solar |
English Farms | Interstate Power and Light Co | Montezuma, IA | Midcontinent Independent System Operator, Inc. (MISO) | 605.1 GWh | Feb 2019 | Feb 2025 | Wind |
Enterprise Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Newcastle, UT | PacifiCorp East (PACE) | 232.1 GWh | Jun 2016 | Feb 2025 | Solar |
Envoy Solar, LLC | Birch Creek Development | Mexico, MO | Midcontinent Independent System Operator, Inc. (MISO) | 427.0 MWh | - | Feb 2025 | Solar |
Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 367.6 GWh | Nov 1982 | Feb 2025 | Other Gas : 96.9% Natural Gas : 3.1% |
Erving Paper Mills | Erving Paper Mills Inc | Erving, MA | ISO New England (ISNE) | 42.9 GWh | Nov 2013 | Feb 2025 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
Escalante Solar I, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 213.9 GWh | Jul 2016 | Feb 2025 | Solar |
Escalante Solar II, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 215.3 GWh | Jul 2016 | Feb 2025 | Solar |
Escalante Solar III, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 212.4 GWh | Jul 2016 | Feb 2025 | Solar |
Escanaba Mill | Billerud Escanaba LLC | Escanaba, MI | Midcontinent Independent System Operator, Inc. (MISO) | 450.7 GWh | Dec 1968 | Feb 2025 | Black Liquor : 45.0% Natural Gas : 30.7% Wood/Wood Waste Solids : 23.1% Residual Fuel Oil : 0.6% Bituminous Coal : 0.5% |
Essex Junction 19 | Green Mountain Power Corp | Essex Junction, VT | ISO New England (ISNE) | 39.1 GWh | Dec 1916 | Feb 2025 | Water : 99.6% |
Essex Solar Center | Arevon Energy, Inc. | Dunnsville, VA | PJM Interconnection, LLC (PJM) | 35.9 GWh | Nov 2017 | Feb 2025 | Solar |
Estill Solar | Estill Solar I, LLC | Estill, SC | Dominion Energy South Carolina, Inc. (SCEG) | 30.3 GWh | Nov 2017 | Feb 2025 | Solar |
Estonian Solar Project, LLC | Enel Green Power Estonian Solar Project, LLC | Cooper, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 26.9 GWh | - | Feb 2025 | Solar |
Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 113.3 GWh | Nov 2023 | Feb 2025 | Solar |
Everglades Solar Energy Center | Florida Power & Light Co | Homestead, FL | Florida Power & Light Co. (FPL) | 140.8 GWh | Dec 2022 | Feb 2025 | Solar |
Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 11.5 GWh | Nov 2009 | Feb 2025 | Solar |
Exelon West Medway II LLC | Constellation Power, Inc | Medway, MA | ISO New England (ISNE) | 213.2 GWh | Feb 2019 | Feb 2025 | Natural Gas : 98.1% Kerosene : 1.9% |
Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 84.3 GWh | Apr 1981 | Feb 2025 | Blast Furnace Gas |
ExxonMobil Baytown Turbine | Exxon Mobil Refining and Supply Co. | Baytown, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.6 TWh | Jan 1989 | Feb 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on February 2025 generation numbers.State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,454.23 GWh |
Alaska | # 48 | 136 | 486.57 GWh |
Arizona | # 15 | 165 | 7,949.76 GWh |
Arkansas | # 28 | 80 | 4,750.62 GWh |
California | # 5 | 1,593 | 15,002.38 GWh |
Colorado | # 30 | 265 | 4,484.87 GWh |
Connecticut | # 34 | 152 | 3,568.74 GWh |
Delaware | # 49 | 31 | 376.39 GWh |
District of Columbia | # 51 | 12 | 16.79 GWh |
Florida | # 3 | 304 | 17,498.62 GWh |
Georgia | # 8 | 241 | 10,439.72 GWh |
Hawaii | # 46 | 66 | 666.80 GWh |
Idaho | # 44 | 143 | 1,423.14 GWh |
Illinois | # 4 | 338 | 15,696.94 GWh |
Indiana | # 12 | 203 | 9,055.86 GWh |
Iowa | # 20 | 281 | 6,506.74 GWh |
Kansas | # 24 | 157 | 5,156.03 GWh |
Kentucky | # 21 | 56 | 6,138.53 GWh |
Louisiana | # 17 | 80 | 7,192.83 GWh |
Maine | # 45 | 159 | 1,123.08 GWh |
Maryland | # 39 | 181 | 2,579.41 GWh |
Massachusetts | # 42 | 599 | 1,604.74 GWh |
Michigan | # 10 | 267 | 10,280.63 GWh |
Minnesota | # 27 | 740 | 5,066.98 GWh |
Mississippi | # 22 | 55 | 5,414.37 GWh |
Missouri | # 19 | 118 | 6,559.07 GWh |
State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Montana | # 40 | 69 | 2,324.85 GWh |
Nebraska | # 36 | 119 | 3,333.41 GWh |
Nevada | # 37 | 109 | 3,002.03 GWh |
New Hampshire | # 43 | 56 | 1,435.29 GWh |
New Jersey | # 31 | 375 | 4,428.89 GWh |
New Mexico | # 38 | 140 | 2,585.31 GWh |
New York | # 11 | 830 | 10,266.35 GWh |
North Carolina | # 9 | 880 | 10,422.85 GWh |
North Dakota | # 33 | 57 | 3,825.72 GWh |
Ohio | # 6 | 190 | 12,150.65 GWh |
Oklahoma | # 18 | 131 | 6,818.46 GWh |
Oregon | # 25 | 259 | 5,152.36 GWh |
Pennsylvania | # 2 | 240 | 21,039.59 GWh |
Rhode Island | # 47 | 95 | 598.64 GWh |
South Carolina | # 14 | 198 | 8,120.13 GWh |
South Dakota | # 41 | 52 | 1,740.50 GWh |
Tennessee | # 26 | 84 | 5,101.16 GWh |
Texas | # 1 | 813 | 43,152.96 GWh |
Utah | # 35 | 119 | 3,334.96 GWh |
Vermont | # 50 | 112 | 195.02 GWh |
Virginia | # 13 | 215 | 8,814.15 GWh |
Washington | # 16 | 137 | 7,908.11 GWh |
West Virginia | # 29 | 36 | 4,645.25 GWh |
Wisconsin | # 23 | 221 | 5,315.49 GWh |
Wyoming | # 32 | 73 | 3,941.95 GWh |