Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.9 GWh | Oct 2015 | Dec 2023 | Solar |
Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Nov 2014 | Dec 2023 | Solar |
Oak Tree Energy | Consolidated Edison Development Inc. | Clark, SD | Southwest Power Pool (SWPP) | 66.7 GWh | Nov 2014 | Dec 2023 | Wind |
Lennon Generating | North American Natural Res | Lennon, MI | Midcontinent Independent System Operator, Inc. (MISO) | 27.3 GWh | Jan 2001 | Dec 2023 | Landfill Gas |
Stillwater B | Brookfield Black Bear Hydro, LLC | Old Town, ME | ISO New England (ISNE) | 12.8 GWh | Aug 2013 | Dec 2023 | Water |
Orono B | Brookfield Black Bear Hydro, LLC | Orono, ME | ISO New England (ISNE) | 25.5 GWh | Oct 2013 | Dec 2023 | Water |
COC Surry LFG, LLC | Petra Engineering | Mount Airy, NC | Duke Energy Carolinas (DUK) | 7.6 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 17.0 GWh | Jun 2015 | Dec 2023 | Solar |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 54.9 GWh | Aug 2015 | Dec 2023 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 53.4 GWh | Oct 2014 | Dec 2023 | Solar |
Desert Star Hybrid | Arizona Public Service Co | Buckeye, AZ | Arizona Public Service Company (AZPS) | 30.0 GWh | Aug 2015 | Dec 2023 | Solar |
St. Albans SPEED Project | St. Albans Solar Partners, LLC | St. Albans, VT | ISO New England (ISNE) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
Cranbury | RE Cranbury Solar 1, LLC | Cranbury, NJ | PJM Interconnection, LLC (PJM) | 6.5 GWh | Nov 2011 | Dec 2023 | Solar |
Decatur County Solar Project | Southern Power Co | Bainbridge, GA | Southern Company Services, Inc. - Trans (SOCO) | 41.6 GWh | Nov 2015 | Dec 2023 | Solar |
Decatur Parkway Solar Project, LLC | Southern Power Co | Bainbridge, GA | Southern Company Services, Inc. - Trans (SOCO) | 171.6 GWh | Nov 2015 | Dec 2023 | Solar |
CBC Solar Energy Gen Fac Phase 2 | CBC Alternative Energy, LLC | Garner, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2013 | Dec 2023 | Solar |
East. Michigan Univ. Heating Plant | East. Michigan Univ. Heating Plant | Ypsilanti, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.0 GWh | Sep 1987 | Dec 2023 | Natural Gas |
Albany Medical Ctr Cogen Plant | Albany Medical Center | Albany, NY | New York Independent System Operator (NYIS) | 31.3 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Valencia Solar | RWE Renewables Americas, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 26.2 GWh | May 2013 | Dec 2023 | Solar |
Tech Park Solar | RWE Renewables Americas, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 13.7 GWh | Nov 2012 | Dec 2023 | Solar |
Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 161.1 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Denver Intl Airport IV Solar | Denver Int'l Airport IV Solar | Denver, CO | Southwest Power Pool (SWPP) | 3.1 GWh | Jun 2014 | Dec 2023 | Solar |
Ayers Village Solar | Altus Power America Management, LLC | Methuen, MA | ISO New England (ISNE) | 2.8 GWh | May 2014 | Dec 2023 | Solar |
Monson Solar | Altus Power America Management, LLC | Monson, MA | ISO New England (ISNE) | 4.1 GWh | Jun 2014 | Dec 2023 | Solar |
Sullivan Solar | Altus Power America Management, LLC | New Bedford, MA | ISO New England (ISNE) | 2.0 GWh | Jul 2014 | Dec 2023 | Solar |
Winchendon Solar | Altus Power America Management, LLC | Winchendon, MA | ISO New England (ISNE) | 2.3 GWh | Mar 2014 | Dec 2023 | Solar |
Coldwater Peaking Plant | Coldwater Board of Public Util | Coldwater, MI | Midcontinent Independent System Operator, Inc. (MISO) | 786.0 MWh | Jun 2015 | Dec 2023 | Natural Gas |
KS Solar Six LLC | Kearsarge Solar LLC | Hubbardston, MA | ISO New England (ISNE) | 2.9 GWh | Nov 2013 | Dec 2023 | Solar |
Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 43.7 GWh | Apr 2015 | Dec 2023 | Solar |
Cornell Snyder Road Solar Array | Ulysses Solar, LLC | Lansing, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Oct 2014 | Dec 2023 | Solar |
Ft. Churchill PV | Sierra Pacific Power Co | Yerington, NV | Nevada Power Company (NEVP) | 23.7 GWh | Apr 2015 | Dec 2023 | Solar |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 15.6 GWh | May 2017 | Dec 2023 | Solar |
Apple Data Center PV3 | Apple, Inc | Conover, NC | Duke Energy Carolinas (DUK) | 30.3 GWh | Nov 2015 | Dec 2023 | Solar |
Clarendon Solar Farm | Clarendon Solar Farm, LLC | North Clarendon, VT | ISO New England (ISNE) | 2.8 GWh | Jun 2014 | Dec 2023 | Solar |
Claire Solar Farm | Claire Solar Partners LLC | South Burlington, VT | ISO New England (ISNE) | 3.0 GWh | Jun 2014 | Dec 2023 | Solar |
IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 770.0 MWh | Aug 2014 | Dec 2023 | Solar |
IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2023 | Solar |
IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Jul 2015 | Dec 2023 | Solar |
IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Jun 2015 | Dec 2023 | Solar |
IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Aug 2015 | Dec 2023 | Solar |
Hadley Solar NG, LLC | NuGen Capital Management | Hadley, MA | ISO New England (ISNE) | 3.4 GWh | Jun 2014 | Dec 2023 | Solar |
265 Pleasant Solar NG, LLC | NuGen Capital Management | Lunenburg, MA | ISO New England (ISNE) | 1.3 GWh | Jun 2014 | Dec 2023 | Solar |
Lanier Solar | Cypress Creek Renewables | Beulaville, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Aug 2016 | Dec 2023 | Solar |
Highwater Solar I | Cypress Creek Renewables | Stoney Creek, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Nov 2015 | Dec 2023 | Solar |
Bearford Solar II | Bearford Solar II, LLC | Burgaw, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Jan 2018 | Dec 2023 | Solar |
Anthony Wayne Solar #1 | GEM Energy LLC | Toledo, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2014 | Dec 2023 | Solar |
Jett Creek Windfarm (Burnt River) | Jett Creek | Huntington, OR | Idaho Power Company (IPCO) | 25.7 GWh | Feb 2017 | Dec 2023 | Wind |
Benson Creek Windfarm (Burnt River) | Benson Creek | Huntington, OR | Idaho Power Company (IPCO) | 26.8 GWh | Feb 2017 | Dec 2023 | Wind |
Durbin Creek Windfarm (Burnt River) | Durbin Creek | Huntington, OR | Idaho Power Company (IPCO) | 22.9 GWh | Feb 2017 | Dec 2023 | Wind |
Prospector Windfarm (Burnt River) | Prospector | Huntington, OR | Idaho Power Company (IPCO) | 25.2 GWh | Feb 2017 | Dec 2023 | Wind |
Willow Spring Windfarm (Burnt River) | Willow Spring | Huntington, OR | Idaho Power Company (IPCO) | 29.0 GWh | Feb 2017 | Dec 2023 | Wind |
Andrew Solar | Cypress Creek Renewables | New Bern, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Nov 2015 | Dec 2023 | Solar |
Tracy Solar | Cypress Creek Renewables | Bailey, NC | Duke Energy Carolinas (DUK) | 16.6 GWh | Nov 2015 | Dec 2023 | Solar |
Candace Solar | Cypress Creek Renewables | Princeton, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2016 | Dec 2023 | Solar |
Sarah Solar | USF Surry, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | Jun 2015 | Dec 2023 | Solar |
Nitro Solar | USF Surry, LLC | Smitfield, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Jun 2015 | Dec 2023 | Solar |
Melinda Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Jul 2015 | Dec 2023 | Solar |
Jacob Solar | Cypress Creek Renewables | Reidsville, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Dec 2015 | Dec 2023 | Solar |
Porter Solar | Cypress Creek Renewables | New Bern, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2015 | Dec 2023 | Solar |
Sun Devil Solar | Cypress Creek Renewables | Littleton, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2015 | Dec 2023 | Solar |
Quincy Solar | Cypress Creek Renewables | Fayetteville, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Oct 2015 | Dec 2023 | Solar |
Kenneth Solar | Cypress Creek Renewables | Warrenton, NC | Duke Energy Progress East (CPLE) | 4.8 GWh | Dec 2015 | Dec 2023 | Solar |
Chei Solar | Cypress Creek Renewables | Middlesex, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Dec 2015 | Dec 2023 | Solar |
Murdock Solar | Cypress Creek Renewables | Clayton, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Dec 2015 | Dec 2023 | Solar |
Husky Solar | Cypress Creek Renewables | Reidsville, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Nov 2016 | Dec 2023 | Solar |
Beetle Solar | Cypress Creek Renewables | Mooresboro, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Nov 2016 | Dec 2023 | Solar |
Happy Solar | Cypress Creek Renewables | Four Oaks, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Dec 2015 | Dec 2023 | Solar |
Meadows PV 1 | Fresh Air Energy XVIII, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 18.2 GWh | May 2016 | Dec 2023 | Solar |
Flat Meeks PV 1 | Ecoplexus, Inc | Robersonville, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Sep 2017 | Dec 2023 | Solar |
Benthall Bridge PV 1 | Ecoplexus, Inc | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 7.9 GWh | Nov 2016 | Dec 2023 | Solar |
American Legion PV 1 | Ecoplexus, Inc | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 24.5 GWh | Nov 2017 | Dec 2023 | Solar |
Baker PV 1 | Ecoplexus, Inc | Aulander, NC | PJM Interconnection, LLC (PJM) | 8.3 GWh | Nov 2016 | Dec 2023 | Solar |
Grandy PV 1 | Ecoplexus, Inc | Grandy, NC | PJM Interconnection, LLC (PJM) | 28.0 GWh | Jan 2020 | Dec 2023 | Solar |
Old Catawba PV 1 | Ecoplexus, Inc | Claremont, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2015 | Dec 2023 | Solar |
Manning PV 1 | Ecoplexus, Inc | Elon, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2018 | Dec 2023 | Solar |
Little River PV 1 | Ecoplexus, Inc | Randolph, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Nov 2015 | Dec 2023 | Solar |
Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 21.9 GWh | May 2017 | Dec 2023 | Solar |
Five Points Solar Park | Five Points Solar Park, LLC | Five Points, CA | California Independent System Operator (CISO) | 102.0 GWh | Aug 2016 | Dec 2023 | Solar |
Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 40.1 GWh | Dec 2018 | Dec 2023 | Solar |
Whitakers | Duke Energy Renewables Services | Whitakers, NC | PJM Interconnection, LLC (PJM) | 22.7 GWh | Nov 2015 | Dec 2023 | Solar |
Kelford | Duke Energy Renewables Services | Lewiston Woodville, NC | PJM Interconnection, LLC (PJM) | 27.5 GWh | Nov 2015 | Dec 2023 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2023 | Solar |
Pasquotank | Duke Energy Renewables Services | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 34.4 GWh | Nov 2014 | Dec 2023 | Solar |
Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 291.6 GWh | Jun 2016 | Dec 2023 | Solar |
Princeton | USF Surry, LLC | Princeton, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Jun 2015 | Dec 2023 | Solar |
4Oaks | USF Surry, LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2015 | Dec 2023 | Solar |
SR Hazlehurst | SR Hazlehurst, LLC | Hazlehurst, GA | Southern Company Services, Inc. - Trans (SOCO) | 34.8 GWh | Oct 2015 | Dec 2023 | Solar |
Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2023 | Solar |
Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2023 | Solar |
Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.4 GWh | Feb 2015 | Dec 2023 | Solar |
Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2015 | Dec 2023 | Solar |
Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2015 | Dec 2023 | Solar |
Innovative Solar 6 | Cypress Creek Renewables | Leicester, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Dec 2015 | Dec 2023 | Solar |
Acton Solar Landfill | Heliovaas LLC | Acton, MA | ISO New England (ISNE) | 1.5 GWh | Nov 2013 | Dec 2023 | Solar |
Springfield Solar LLC | Laurel Capital Partners | Springfield, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2012 | Dec 2023 | Solar |
Beaver Solar LLC | Laurel Capital Partners | Beaver, PA | PJM Interconnection, LLC (PJM) | 514.0 MWh | Nov 2012 | Dec 2023 | Solar |
Creswell Alligood Solar, LLC | Duke Energy Renewables Services | Creswell, NC | PJM Interconnection, LLC (PJM) | 23.7 GWh | Apr 2015 | Dec 2023 | Solar |
Everetts Wildcat Solar, LLC | Duke Energy Renewables Services | Williamston, NC | PJM Interconnection, LLC (PJM) | 7.4 GWh | Mar 2015 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |