Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
OlivePV | Indiana Michigan Power Co | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 8.4 GWh | Jul 2016 | Aug 2024 | Solar |
Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.5 GWh | Dec 2015 | Aug 2024 | Solar |
HP Hood CT | HP Hood LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 103.0 GWh | May 2015 | Aug 2024 | Natural Gas |
Twin Branch PV | Indiana Michigan Power Co | Mishawaka, IN | PJM Interconnection, LLC (PJM) | 3.9 GWh | Jul 2016 | Aug 2024 | Solar |
Fort Benning Solar Facility | Georgia Power Co | Fort Benning, GA | Southern Company Services, Inc. - Trans (SOCO) | 51.9 GWh | Nov 2015 | Aug 2024 | Solar |
Kings Bay Solar Facility | Georgia Power Co | Kings Bay, GA | Southern Company Services, Inc. - Trans (SOCO) | 52.1 GWh | Nov 2016 | Aug 2024 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 83.0 GWh | Nov 2020 | Aug 2024 | Solar |
Marshall Solar Energy Project | Marshall Solar Energy Project | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 88.8 GWh | Dec 2016 | Aug 2024 | Solar |
Marine Corps Logistics Base Solar | Georgia Power Co | Albany, GA | Southern Company Services, Inc. - Trans (SOCO) | 55.7 GWh | Jan 2018 | Aug 2024 | Solar |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 387.0 GWh | May 2019 | Aug 2024 | Solar |
Exelon West Medway II LLC | Constellation Power, Inc | Medway, MA | ISO New England (ISNE) | 210.2 GWh | Feb 2019 | Aug 2024 | Natural Gas : 99.6% |
Bloom Wind | CP Bloom Wind LLC | Minneola, KS | Southwest Power Pool (SWPP) | 657.0 GWh | May 2017 | Aug 2024 | Wind |
Butler Solar Project 103 | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 213.9 GWh | Nov 2016 | Aug 2024 | Solar |
Cardinal Point Wind | Cardinal Point LLC | Sciota, IL | Midcontinent Independent System Operator, Inc. (MISO) | 540.6 GWh | Feb 2020 | Aug 2024 | Wind |
New Frontier Wind | Meadowlark Wind I LLC | Ruso, ND | Midcontinent Independent System Operator, Inc. (MISO) | 378.2 GWh | Nov 2018 | Aug 2024 | Wind |
Western Branch High School | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 1.1 GWh | Mar 2016 | Aug 2024 | Solar |
Moxie Freedom Generation Plant | Moxie Freedom LLC | Salem Township, PA | PJM Interconnection, LLC (PJM) | 7.7 TWh | Jul 2018 | Aug 2024 | Natural Gas |
Greensville County Power Station | Virginia Electric & Power Co | Emporia, VA | PJM Interconnection, LLC (PJM) | 12.0 TWh | Nov 2018 | Aug 2024 | Natural Gas |
Nellis Solar PV II | Nevada Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 38.0 GWh | Oct 2015 | Aug 2024 | Solar |
Great Valley Solar Portfolio Holdings, LLC | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 555.3 GWh | Nov 2017 | Aug 2024 | Solar |
Iron Springs Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 214.0 GWh | Jul 2016 | Aug 2024 | Solar |
Rattlesnake Den | SunEdison LLC | Garden City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 680.4 GWh | Jun 2015 | Aug 2024 | Wind |
Granite Mountain Solar West, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 127.8 GWh | Aug 2016 | Aug 2024 | Solar |
Granite Mountain Solar East, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 211.2 GWh | Aug 2016 | Aug 2024 | Solar |
SR Camden | SR Camden, LLC | Camden, AR | Southwestern Power Administration (SPA) | 20.0 GWh | Nov 2015 | Aug 2024 | Solar |
Antrim Wind | Antrim Wind Energy LLC | Antrim, NH | ISO New England (ISNE) | 67.3 GWh | Nov 2019 | Aug 2024 | Wind |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 97.4 GWh | Nov 2016 | Aug 2024 | Solar |
Latigo Wind Park | AES Distributed Energy | Monticello, UT | PacifiCorp East (PACE) | 147.6 GWh | Feb 2016 | Aug 2024 | Wind |
Desert Wind Farm, LLC | Avangrid Renewables LLC | Hertford, NC | PJM Interconnection, LLC (PJM) | 493.3 GWh | Nov 2016 | Aug 2024 | Wind |
Bearkat | Bearkat Wind Energy 1, LLC | St. Lawrence, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 648.7 GWh | Jan 2018 | Aug 2024 | Wind |
Golden West Power Partners LLC | Golden West Power Partners, LLC | Calhan, CO | Public Service Company of Colorado (PSCO) | 803.4 GWh | Sep 2015 | Aug 2024 | Wind |
RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 237.7 GWh | Nov 2016 | Aug 2024 | Solar |
RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 163.3 GWh | Nov 2016 | Aug 2024 | Solar |
Babcock Solar Energy Center Hybrid | Florida Power & Light Co | Punta Gorda, FL | Florida Power & Light Co. (FPL) | 134.9 GWh | Nov 2016 | Aug 2024 | Solar |
RE Roserock | Southern Power Co | Fort Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 368.6 GWh | Oct 2016 | Aug 2024 | Solar |
Murphy Flat Solar | Murphy Flat Power, LLC | Murphy, ID | Idaho Power Company (IPCO) | 43.4 GWh | Mar 2017 | Aug 2024 | Solar |
Orchard Ranch Solar | Orchard Ranch Solar, LLC | Orchard, ID | Idaho Power Company (IPCO) | 42.8 GWh | Feb 2017 | Aug 2024 | Solar |
American Falls Solar | American Falls Solar LLC | American Falls, ID | Idaho Power Company (IPCO) | 43.8 GWh | Feb 2017 | Aug 2024 | Solar |
American Falls Solar II | American Falls Solar II, LLC | American Falls, ID | Idaho Power Company (IPCO) | 42.9 GWh | Feb 2017 | Aug 2024 | Solar |
Manatee Solar Energy Center | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 13.9 GWh | Nov 2016 | Aug 2024 | Solar |
Domino Farms Solar | DTE Electric Company | Ann Arbor, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Aug 2015 | Aug 2024 | Solar |
Greenwood Solar Farm | DTE Electric Company | Avoca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2015 | Aug 2024 | Solar |
Waipio Solar | Waipio PV, LLC | Waipio, HI | (HECO) | 90.5 GWh | Aug 2019 | Aug 2024 | Solar |
Pecan Solar | Dominion Renewable Energy | Pleasant Hill, NC | PJM Interconnection, LLC (PJM) | 142.2 GWh | Nov 2018 | Aug 2024 | Solar |
CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 230.4 GWh | Oct 2017 | Aug 2024 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 327.9 GWh | Jan 2019 | Aug 2024 | Solar |
UI RCP New Haven Fuel Cell | United Illuminating Co | New Haven, CT | ISO New England (ISNE) | 19.4 GWh | Jul 2015 | Aug 2024 | Natural Gas |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.8 GWh | Oct 2017 | Aug 2024 | Solar |
Buckthorn Westex | Buckthorn Westex, LLC | Ft. Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 377.4 GWh | Apr 2018 | Aug 2024 | Solar |
Shoreham Solar Commons | Duke Energy Renewables Services | Shoreham, NY | New York Independent System Operator (NYIS) | 46.9 GWh | Jun 2018 | Aug 2024 | Solar |
UI RCP Bridgeport Seaside | United Illuminating Co | Bridgeport, CT | ISO New England (ISNE) | 19.4 GWh | Oct 2015 | Aug 2024 | Natural Gas : 94.4% Solar : 5.6% |
River Bend Solar, LLC | River Bend Solar, LLC | Florence, AL | Tennessee Valley Authority (TVA) | 151.5 GWh | Aug 2016 | Aug 2024 | Solar |
Citrus Solar Energy Center Hybrid | Florida Power & Light Co | Arcadia, FL | Florida Power & Light Co. (FPL) | 137.6 GWh | Nov 2016 | Aug 2024 | Solar |
Live Oak Solar, LLC | Live Oak Solar, LLC | Metter, GA | Southern Company Services, Inc. - Trans (SOCO) | 96.8 GWh | Nov 2016 | Aug 2024 | Solar |
Grand View Solar Two | Grand View PV Solar Two, LLC | Grand View, ID | Idaho Power Company (IPCO) | 178.0 GWh | Nov 2016 | Aug 2024 | Solar |
South Plains II | Onward Energy | Lockney, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.0 TWh | May 2016 | Aug 2024 | Wind |
Sunflower Wind Project | Onward Energy | Mandan, ND | Western Area Power Administration - Rocky Mountain Region (WACM) | 426.4 GWh | Nov 2016 | Aug 2024 | Wind |
Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 329.3 GWh | Jun 2016 | Aug 2024 | Solar |
Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 340.1 GWh | Apr 2020 | Aug 2024 | Solar |
Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 284.6 GWh | Oct 2020 | Aug 2024 | Solar |
Javelina Wind Energy, LLC | Javelina Wind Energy, LLC | Mirando City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 811.3 GWh | Nov 2015 | Aug 2024 | Wind |
Western Michigan Solar Gardens | Consumers Energy Co - (MI) | Kalamazoo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jul 2016 | Aug 2024 | Solar |
Grand Valley Solar Gardens | Consumers Energy Co - (MI) | Allendale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Mar 2016 | Aug 2024 | Solar |
Granby Hydro | Northern Water Hydropower Enterprise | Granby, CO | Public Service Company of Colorado (PSCO) | 5.0 GWh | Apr 2016 | Aug 2024 | Water |
Colorado Bend II | Constellation Power, Inc | Wharton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 7.2 TWh | May 2017 | Aug 2024 | Natural Gas |
Castle Gap Solar Hybrid | Upton County Solar 2 LLC | McCarney, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 385.9 GWh | Apr 2018 | Aug 2024 | Solar |
Kawailoa Solar | Kawailoa Solar, LLC | Haleiwa, HI | (HECO) | 61.4 GWh | Oct 2019 | Aug 2024 | Solar |
Harpster Wind | OEE XVII, LLC | Harpster, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Dec 2015 | Aug 2024 | Wind |
Eastern Shore Solar, LLC | Dominion Renewable Energy | Oak Hall, VA | PJM Interconnection, LLC (PJM) | 132.4 GWh | Sep 2016 | Aug 2024 | Solar |
Big Sand Draw Plant | Denbury Inc | Riverton, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 39.2 GWh | Feb 2015 | Aug 2024 | Natural Gas |
New Creek Wind | New Creek Wind, LLC | New Creek, WV | PJM Interconnection, LLC (PJM) | 284.9 GWh | Nov 2016 | Aug 2024 | Wind |
Broadview Energy JN, LLC | Pattern Operators LP | Texico, NM | (GRIS) | 690.5 GWh | Feb 2017 | Aug 2024 | Wind |
Innovative Solar 43, LLC | Cypress Creek Renewables | Ivanhoe, NC | Duke Energy Progress East (CPLE) | 65.4 GWh | Nov 2016 | Aug 2024 | Solar |
Broadview Energy KW, LLC | Pattern Operators LP | Texico, NM | (GRIS) | 544.9 GWh | Feb 2017 | Aug 2024 | Wind |
Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 192.8 GWh | Nov 2016 | Aug 2024 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 114.2 GWh | Nov 2016 | Aug 2024 | Solar |
Cotton Plains Wind Farm | Cotton Plains Wind I, LLC | Floydada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 196.6 GWh | Feb 2017 | Aug 2024 | Wind |
Rocksprings | Rocksprings Val Verde Wind, LLC | Del Rio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 467.8 GWh | Aug 2017 | Aug 2024 | Wind |
Frontier Windpower | Duke Energy Renewables Services | Newkirk, OK | Southwestern Power Administration (SPA) | 523.2 GWh | Nov 2016 | Aug 2024 | Wind |
Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 66.6 GWh | Apr 2017 | Aug 2024 | Solar |
Bluestem | Bluestem Wind Energy, LLC | Beaver, OK | Southwest Power Pool (SWPP) | 781.3 GWh | Nov 2016 | Aug 2024 | Wind |
Alta Luna | TPE Alta Luna, LLC | Deming, NM | Public Service Company of New Mexico (PNM) | 35.2 GWh | Dec 2016 | Aug 2024 | Solar |
Playa Solar 2 | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | Nevada Power Company (NEVP) | 245.8 GWh | Jul 2017 | Aug 2024 | Solar |
Durham AWTF | Clean Water Services | Tigard, OR | Portland General Electric Company (PGE) | 9.2 GWh | Mar 2015 | Aug 2024 | Other Biomass Gas |
Bacliff | PHR Holdings LLC | Bacliff, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 126.9 GWh | Jun 2018 | Aug 2024 | Natural Gas |
Blue Cloud Wind Energy LLC | RWE Renewables Americas, LLC | Sudan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 567.7 GWh | Nov 2018 | Aug 2024 | Wind |
Canyon Wind Project, LLC | Canyon Wind Project, LLC | Scurry, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 695.6 GWh | - | Aug 2024 | Wind |
Southbridge Solar | AES Distributed Energy | Southbridge, MA | ISO New England (ISNE) | 2.3 GWh | Feb 2016 | Aug 2024 | Solar |
Keys Energy Center | PSEG Keys Energy Center, LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 4.7 TWh | Jun 2018 | Aug 2024 | Natural Gas |
Sumrall II Solar Farm | Onward Energy | Sumrall, MS | Midcontinent Independent System Operator, Inc. (MISO) | 99.7 GWh | Nov 2017 | Aug 2024 | Solar |
San Isabel Solar, LLC | San Isabel Solar, LLC | Trinidad, CO | Public Service Company of Colorado (PSCO) | 75.4 GWh | Nov 2016 | Aug 2024 | Solar |
Sumrall I Solar Farm | MS Solar 2, LLC | Sumrall, MS | Southern Company Services, Inc. - Trans (SOCO) | 100.0 GWh | May 2017 | Aug 2024 | Solar |
Mesquite Solar 2, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 281.1 GWh | Nov 2016 | Aug 2024 | Solar |
Mesquite Solar 3, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 462.5 GWh | Nov 2016 | Aug 2024 | Solar |
Grady Wind Energy Center, LLC | Pattern Operators LP | Clovis, NM | Public Service Company of New Mexico (PNM) | 866.9 GWh | Jul 2019 | Aug 2024 | Wind |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 238.0 GWh | Dec 2018 | Aug 2024 | Solar |
Schofield Generating Station | Hawaiian Electric Co Inc | Schofield Barracks, HI | (HECO) | 33.6 GWh | May 2018 | Aug 2024 | Other Biomass Liquids : 55.9% Distillate Fuel Oil : 44.1% |
Ringer Hill Wind Farm, LLC | Ringer Hill Wind LLC | Salisbury, PA | PJM Interconnection, LLC (PJM) | 92.7 GWh | Nov 2016 | Aug 2024 | Wind |
Grove Solar Center, LLC | Cypress Creek Renewables | Vale, OR | Idaho Power Company (IPCO) | 12.5 GWh | Aug 2016 | Aug 2024 | Solar |
Hyline Solar Center, LLC | Cypress Creek Renewables | Ontario, OR | Idaho Power Company (IPCO) | 18.3 GWh | Sep 2016 | Aug 2024 | Solar |
Summary of Power Plants By State
Figures are based on August 2024 generation numbers.State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Alabama | # 7 | 78 | 14,073.11 GWh |
Alaska | # 48 | 147 | 631.71 GWh |
Arizona | # 10 | 161 | 12,447.73 GWh |
Arkansas | # 23 | 77 | 6,473.81 GWh |
California | # 4 | 1,666 | 22,299.47 GWh |
Colorado | # 28 | 277 | 5,476.67 GWh |
Connecticut | # 33 | 159 | 4,351.57 GWh |
Delaware | # 49 | 31 | 481.79 GWh |
District of Columbia | # 51 | 12 | 19.18 GWh |
Florida | # 2 | 286 | 27,339.08 GWh |
Georgia | # 6 | 251 | 14,863.07 GWh |
Hawaii | # 47 | 69 | 841.39 GWh |
Idaho | # 43 | 142 | 1,655.52 GWh |
Illinois | # 5 | 335 | 17,196.16 GWh |
Indiana | # 18 | 202 | 9,001.13 GWh |
Iowa | # 26 | 283 | 5,529.62 GWh |
Kansas | # 31 | 165 | 5,363.63 GWh |
Kentucky | # 21 | 55 | 6,964.00 GWh |
Louisiana | # 14 | 82 | 10,133.66 GWh |
Maine | # 45 | 162 | 1,185.43 GWh |
Maryland | # 38 | 185 | 3,346.65 GWh |
Massachusetts | # 41 | 614 | 1,896.47 GWh |
Michigan | # 12 | 274 | 12,135.86 GWh |
Minnesota | # 27 | 748 | 5,511.98 GWh |
Mississippi | # 19 | 55 | 7,436.42 GWh |
Missouri | # 20 | 126 | 7,051.26 GWh |
State | Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,306.38 GWh |
Nebraska | # 36 | 125 | 3,559.93 GWh |
Nevada | # 32 | 110 | 4,699.98 GWh |
New Hampshire | # 42 | 60 | 1,808.14 GWh |
New Jersey | # 25 | 387 | 5,633.45 GWh |
New Mexico | # 39 | 139 | 3,198.26 GWh |
New York | # 11 | 848 | 12,289.60 GWh |
North Carolina | # 9 | 893 | 13,559.75 GWh |
North Dakota | # 35 | 59 | 3,641.88 GWh |
Ohio | # 8 | 190 | 13,652.00 GWh |
Oklahoma | # 15 | 130 | 10,062.87 GWh |
Oregon | # 29 | 262 | 5,448.37 GWh |
Pennsylvania | # 3 | 246 | 23,205.63 GWh |
Rhode Island | # 46 | 97 | 1,061.17 GWh |
South Carolina | # 16 | 203 | 9,629.88 GWh |
South Dakota | # 44 | 53 | 1,603.17 GWh |
Tennessee | # 22 | 87 | 6,912.16 GWh |
Texas | # 1 | 797 | 58,529.53 GWh |
Utah | # 37 | 122 | 3,440.26 GWh |
Vermont | # 50 | 114 | 207.44 GWh |
Virginia | # 13 | 213 | 10,408.51 GWh |
Washington | # 17 | 138 | 9,091.93 GWh |
West Virginia | # 30 | 36 | 5,412.86 GWh |
Wisconsin | # 24 | 230 | 6,416.93 GWh |
Wyoming | # 34 | 70 | 3,868.32 GWh |