Yucca
7522 South Somerton Ave., Yuma, AZ 85364Plant Summary Information
Yucca is ranked #43 out of 150 power plants in Arizona in terms of total annual net electricity generation.
Yucca is comprised of 8 generators and generated 90.8 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Yucca |
---|---|
Utility Name | Arizona Public Service Co |
Location | Yuma County, AZ |
Initial Operation Date | April 1959 |
Last Update | Mar 2024 |
Annual Generation | 267.9 GWh |
Annual Consumption | 3.2 M MMBtu |
Ranked #2,008 out of 11,249 Power Plants Nationwide | |
Ranked #669 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #43 out of 150 Arizona Power Plants | |
Ranked #21 out of 33 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.6% |
Map of Yucca
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Yucca.
Monthly Net Generation for Yucca
Yucca Details
Summary Information | |
---|---|
Plant Name | Yucca (120) |
Plant Address | 7522 South Somerton Ave. Yuma, AZ 85364 |
Utility | Arizona Public Service Co (803) |
Latitude, Longitude | 32.7214, -114.7106 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | April 1959 |
Annual Generation | 267.9 GWh |
Fuel Types | Natural Gas : 99.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
Natural Gas Storage | No |
Generator ST1 Details Operating April 1959
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 86.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1959 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 75 MW |
Net Winter Capacity With Natural Gas | 75 MW |
Net Summer Capacity With Oil | 75 MW |
Net Winter Capacity With Oil | 75 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator GT1 Details Operating July 1971
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18 MW |
Winter Capacity | 22 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 18 MW |
Net Winter Capacity With Natural Gas | 19 MW |
Net Summer Capacity With Oil | 18 MW |
Net Winter Capacity With Oil | 19 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT2 Details Operating July 1971
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18 MW |
Winter Capacity | 22 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 18 MW |
Net Winter Capacity With Natural Gas | 19 MW |
Net Summer Capacity With Oil | 18 MW |
Net Winter Capacity With Oil | 19 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT3 Details Operating June 1973
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 72.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 62 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT4 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 72.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 51 MW |
Winter Capacity | 61 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GT21 Details Operating December 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 25.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 20 MW |
Winter Capacity | 22 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT5 Details Operating June 2008
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 49 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT6 Details Operating June 2008
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 49 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Yucca Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Imperial Irrigation District | 333 East Barioni BoulevardP O Box 937, Imperial, CA 92251 | Generator GT21 | 100.00% |
Imperial Irrigation District | 333 East Barioni BoulevardP O Box 937, Imperial, CA 92251 | Generator ST1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#659 | University Park North | University Park, IL | 281.9 GWh |
#660 | Gramercy Holdings LLC | Gramercy, LA | 277.9 GWh |
#661 | Ticona Polymers Inc | Bishop, TX | 275.3 GWh |
#662 | Corpus Refinery | Corpus Christi, TX | 271.3 GWh |
#663 | Empire Energy Center | Sarcoxie, MO | 283.9 GWh |
#664 | Kern River Eastridge Cogen | Bakersfield, CA | 268.8 GWh |
#665 | Ada Cogeneration LP | Ada, MI | 268.5 GWh |
#666 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 268.5 GWh |
#667 | UCLA So Campus Cogen Project | Los Angeles, CA | 268.1 GWh |
#668 | Dighton Power Plant | Dighton, MA | 267.7 GWh |
#670 | Antelope Station | Abernathy, TX | 266.6 GWh |
#671 | Geismar | Geismar, LA | 460.4 GWh |
#672 | New-Indy Ontario Mill | Ontario, CA | 264.1 GWh |
#673 | Bacliff | Bacliff, TX | 263.8 GWh |
#674 | AES Redondo Beach LLC | Redondo Beach, CA | 263.5 GWh |
#675 | Rio Bravo | Albuquerque, NM | 263.1 GWh |
#676 | T B Simon Power Plant | East Lansing, MI | 262.2 GWh |
#677 | Tulsa | Tulsa, OK | 262.0 GWh |
#678 | Sumpter | Belleville, MI | 261.5 GWh |
#679 | Consumer Operations LLC | Green Bay, WI | 257.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Yucca.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arizona Western College PV | Yuma, AZ | 6.5 GWh | 12.7 mi |
Community Solar 1 | Brawley, CA | 14.6 GWh | 48.3 mi |
Drop 1 | Holtville, CA | 7.1 GWh | 13.5 mi |
Drop 2 (CA) | Holtville, CA | 44.9 GWh | 18.7 mi |
Drop 3 (CA) | Holtville, CA | 36.9 GWh | 24.2 mi |
Drop 4 | Holtville, CA | 98.7 GWh | 29.6 mi |
Drop 5 | Calexico, CA | 14.0 GWh | 39.8 mi |
East Highline | Holtville, CA | 3.3 GWh | 33.3 mi |
El Centro Hybrid | El Centro, CA | 1.2 TWh | 48.5 mi |
Foothills Solar Plant Hybrid | Yuma, AZ | 101.6 GWh | 17.1 mi |
Heber Geothermal | Heber, CA | 174.7 GWh | 46.9 mi |
Heber Solar | Heber, CA | 26.8 GWh | 48.3 mi |
IVC Solar | Imperial, CA | 5.4 GWh | 46.9 mi |
Ormesa I | Holtville, CA | 115.5 GWh | 32.4 mi |
Ormesa II | Holtville, CA | 108.0 GWh | 31.6 mi |
Ormesa III | Holtville, CA | 77.9 GWh | 32.4 mi |
Pilot Knob | Winterhaven, CA | 29.5 GWh | 1.1 mi |
Second Imperial Geothermal | Heber, CA | 159.6 GWh | 48 mi |
Siphon Drop Power Plant | Winterhaven, CA | 12.6 GWh | 6 mi |
Yuma Cogeneration Associates | Yuma, AZ | 129.3 GWh | 3.3 mi |