York Energy Center
1055 Pikes Peak Road, Delta, PA 17314Plant Summary Information
York Energy Center is ranked #16 out of 2,254 natural gas power plants nationwide in terms of total annual net electricity generation.
York Energy Center is comprised of 7 generators and generated 2.5 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | York Energy Center |
---|---|
Utility Name | Calpine Mid-Merit LLC |
Location | York County, PA |
Initial Operation Date | March 2011 |
Last Update | Sep 2024 |
Annual Generation | 9.0 TWh |
Annual Consumption | 70.8 M MMBtu |
Ranked #76 out of 11,852 Power Plants Nationwide | |
Ranked #16 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 231 Pennsylvania Power Plants | |
Ranked #2 out of 78 Pennsylvania Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of York Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for York Energy Center.
Monthly Net Generation for York Energy Center
York Energy Center Details
Summary Information | |
---|---|
Plant Name | York Energy Center (55524) |
Plant Address | 1055 Pikes Peak Road, Delta, PA 17314 |
Utility | Calpine Mid-Merit LLC (56608) |
Latitude, Longitude | 39.7375, -76.30667 |
Generation Dates on File | Mar 2011 to Sep 2024 |
Initial Operation Date | March 2011 |
Annual Generation | 9.0 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 00-177-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Conowingo Pool |
Ash Impoundment | No |
Transmission / Distribution Owner | PECO Energy Co (14940) PA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
Natural Gas Storage | No |
Generator CTG1 Details Operating March 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 120 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 108 MW |
Net Winter Capacity With Natural Gas | 110 MW |
Net Summer Capacity With Oil | 108 MW |
Net Winter Capacity With Oil | 110 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CTG2 Details Operating March 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 120 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 108 MW |
Net Winter Capacity With Natural Gas | 110 MW |
Net Summer Capacity With Oil | 108 MW |
Net Winter Capacity With Oil | 110 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CTG3 Details Operating March 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 120 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 108 MW |
Net Winter Capacity With Natural Gas | 110 MW |
Net Summer Capacity With Oil | 108 MW |
Net Winter Capacity With Oil | 110 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator STG1 Details Operating March 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCB1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 194 MW |
Winter Capacity | 194 MW |
Minimum Load | 112 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 188 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 188 MW |
Net Winter Capacity With Oil | 188 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CTG5 Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCB2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 234.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 214 MW |
Winter Capacity | 228 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 211 MW |
Net Winter Capacity With Natural Gas | 227 MW |
Net Summer Capacity With Oil | 211 MW |
Net Winter Capacity With Oil | 227 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CTG6 Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCB2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 234.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 214 MW |
Winter Capacity | 228 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 211 MW |
Net Winter Capacity With Natural Gas | 227 MW |
Net Summer Capacity With Oil | 211 MW |
Net Winter Capacity With Oil | 227 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator STG2 Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCB2 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | DLTAPLNT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DLTAPLNT |
Nameplate Capacity | 419.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 407 MW |
Winter Capacity | 408 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 395.1 MW |
Net Winter Capacity With Natural Gas | 395.1 MW |
Net Summer Capacity With Oil | 395.1 MW |
Net Winter Capacity With Oil | 395.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
York Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#7 | Hines Energy Complex | Bartow, FL | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.6 TWh |
#9 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.3 TWh |
#10 | Union Power Station | El Dorado, AR | 11.1 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.3 TWh |
#17 | Fort Myers | Ft. Myers, FL | 9.0 TWh |
#18 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#19 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh |
#20 | Nine Mile Point | Westwego, LA | 8.7 TWh |
#21 | Sanford | DeBary, FL | 8.6 TWh |
#22 | South Field Energy | Wellsville, OH | 8.6 TWh |
#23 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#24 | Seminole (FL) | Palatka, FL | 11.1 TWh |
#25 | Wansley Combined Cycle | Franklin, GA | 8.3 TWh |
#26 | Hummel Station LLC | Shamokin Dam, PA | 8.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding York Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
APG New Chesapeake | Aberdeen, MD | 4.0 GWh | 18.9 mi |
APG Old Bayside | Aberdeen, MD | 3.0 GWh | 18.6 mi |
Archdiocese of Baltimore J | Perryman, MD | 3.4 GWh | 20.8 mi |
Archdiocese of Baltimore L | Perryman, MD | 3.4 GWh | 20.8 mi |
Conowingo | Darlington, MD | 2.0 TWh | 8.9 mi |
Essential Power Rock Springs LLC | Rising Sun, MD | 213.7 GWh | 7.9 mi |
Frey Farm Landfill | Conestoga, PA | 16.4 GWh | 16.9 mi |
Holtwood | Holtwood, PA | 949.8 GWh | 6.3 mi |
IKEA Perryville 460 | Perryville, MD | 5.1 GWh | 18.1 mi |
Keystone Solar | Quarryville, PA | 7.2 GWh | 9.7 mi |
Macy's MD Joppa Solar Project | Joppa, MD | 221.0 MWh | 20.1 mi |
McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.4 GWh | 18 mi |
Meeting House | North East, MD | 1.3 GWh | 19.5 mi |
Peach Bottom | Delta, PA | 21.9 TWh | 2.5 mi |
Perryman | Harford County, MD | 196.0 GWh | 20.9 mi |
PPL Frey Farm Landfill Wind | Conestoga, PA | 5.6 GWh | 17.2 mi |
Safe Harbor | Conestoga, PA | 989.2 GWh | 13.6 mi |
The Clorox Company | Aberdeen, MD | 2.6 GWh | 19.2 mi |
Tolna | New Freedom, PA | 188.0 MWh | 17.5 mi |
Wildcat Point Generation Facility | Conowingo, MD | 3.2 TWh | 7.8 mi |