Yellow Pine Solar
6901 Tecopa Road, Enterprise, NV 89124Plant Summary Information
Yellow Pine Solar is ranked #30 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Yellow Pine Solar generated 124.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Yellow Pine Solar |
---|---|
Utility Name | Yellow Pine Solar, LLC |
Location | Clark County, NV |
Initial Operation Date | July 2023 |
Last Update | Aug 2024 |
Annual Generation | 377.8 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,570 out of 11,835 Power Plants Nationwide | |
Ranked #95 out of 5,643 Solar Power Plants Nationwide | |
Ranked #30 out of 109 Nevada Power Plants | |
Ranked #11 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Yellow Pine Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Yellow Pine Solar.
Monthly Net Generation for Yellow Pine Solar
Yellow Pine Solar Details
Summary Information | |
---|---|
Plant Name | Yellow Pine Solar (66357) |
Plant Address | 6901 Tecopa Road, Enterprise, NV 89124 |
Utility | Yellow Pine Solar, LLC (65453) |
Latitude, Longitude | 36.06627, -115.77514 |
Generation Dates on File | Jul 2023 to Aug 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 377.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Gridliance West () NV |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator YPES Details Operating July 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 65 MW |
Summer Capacity | 48.8 MW |
Winter Capacity | 48.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 260 |
---|---|
Maximum Charge Rate | 65 MW |
Maximum Discharge Rate | 65 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 21.4 |
Storage Enclosure Type | CS |
Arbitrage | P |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 66357 |
Direct Support Gen Id | YPS1 |
Support T D Asset | No |
Generator YPS1 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Summer Capacity | 93.8 MW |
Winter Capacity | 93.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 141.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Yellow Pine Solar Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#85 | Fort Bend Solar LLC | East Bernard, TX | 410.5 GWh |
#86 | Brazoria West | Damon, TX | 408.5 GWh |
#87 | Aquamarine | Lemoore, CA | 406.2 GWh |
#88 | Mount Signal Solar Farm II | Calexico, CA | 405.6 GWh |
#89 | CED Crane Solar | Crane, TX | 405.5 GWh |
#90 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#91 | Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh |
#92 | Daggett 2 | Daggett, CA | 397.4 GWh |
#93 | Big Plain Solar, LLC | London, OH | 403.0 GWh |
#94 | RE Garland | Rosamond, CA | 383.7 GWh |
#96 | Buena Vista Energy Center | Chaparral, NM | 386.6 GWh |
#97 | Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh |
#98 | Arica Solar | Desert Center, CA | 387.7 GWh |
#99 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#100 | Samson Solar Energy | Cunningham, TX | 388.3 GWh |
#101 | North Rosamond Solar LLC | Rosamond, CA | 387.0 GWh |
#102 | Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh |
#103 | Riverstart Solar Park LLC | Modoc, IN | 386.0 GWh |
#104 | Brazoria County Solar Project (Danciger) | Damon, TX | 385.6 GWh |
#105 | Mustang Two | Lemoore, CA | 385.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Yellow Pine Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CityCenter Central Plant Cogen Units | Las Vegas, NV | 63.8 GWh | 33.4 mi |
Clark (NVE) | Las Vegas, NV | 693.0 GWh | 40.5 mi |
Dignity - San Martin | Las Vegas, NV | 3.7 GWh | 28.1 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 37.1 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 22.2 GWh | 27 mi |
Higgins Generating Station | Primm, NV | 2.3 TWh | 39.1 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 35.8 mi |
IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh | 27.6 mi |
Ivanpah 1 | Nipton, CA | 230.3 GWh | 41 mi |
Ivanpah 2 | Nipton, CA | 268.3 GWh | 39.2 mi |
Ivanpah 3 | Nipton, CA | 270.0 GWh | 37.3 mi |
Las Vegas Generating Station | North Las Vegas, NV | 410.0 GWh | 38.2 mi |
MDU / NVSS-II | Pahrump, NV | 18.7 GWh | 18.1 mi |
NVSS-II | Pahrump, NV | 32.7 GWh | 18.1 mi |
Silver State Solar Power North | Primm, NV | 112.8 GWh | 30.4 mi |
Silver State Solar Power South | Primm Valley, NV | 647.5 GWh | 39.5 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 3.7 GWh | 33.5 mi |
Solar Las Vegas MB-1 | Las Vegas, NV | 8.7 GWh | 33.4 mi |
Stateline Solar | Nipton, CA | 618.5 GWh | 38.5 mi |
Yellow Pine II | Enterprise, NV | 109.8 GWh | 1.1 mi |