Wyoming 2 CSG, LLC
8117 Pioneer Road, Wyoming, MN 55092Plant Summary Information
Wyoming 2 CSG, LLC is ranked #70 out of 482 solar farms in Minnesota in terms of total annual net electricity generation.
Wyoming 2 CSG, LLC generated 1.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wyoming 2 CSG, LLC |
---|---|
Utility Name | Ecoplexus, Inc |
Location | Chisago County, MN |
Initial Operation Date | March 2018 |
Last Update | Dec 2023 |
Annual Generation | 7.8 GWh |
Annual Consumption | 27.3 k MMBtu |
Ranked #6,673 out of 11,835 Power Plants Nationwide | |
Ranked #2,102 out of 5,643 Solar Power Plants Nationwide | |
Ranked #202 out of 736 Minnesota Power Plants | |
Ranked #70 out of 482 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of Wyoming 2 CSG, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wyoming 2 CSG, LLC.
Monthly Net Generation for Wyoming 2 CSG, LLC
Wyoming 2 CSG, LLC Details
Summary Information | |
---|---|
Plant Name | Wyoming 2 CSG, LLC (61486) |
Plant Address | 8117 Pioneer Road, Wyoming, MN 55092 |
Utility | Ecoplexus, Inc (58970) |
Latitude, Longitude | 45.35, -92.95 |
Generation Dates on File | Mar 2018 to Dec 2023 |
Initial Operation Date | March 2018 |
Annual Generation | 7.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1149-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator WY01 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.3 MW |
Generator WY02 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.3 MW |
Generator WY03 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.3 MW |
Generator WY04 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.3 MW |
Generator WY05 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.3 MW |
Wyoming 2 CSG, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2092 | Angelica Solar Site 2 | Belfast, NY | 7.9 GWh |
#2093 | Angelica Solar Site 3 | Belfast, NY | 7.9 GWh |
#2094 | Angelica Solar Site 4 | Angelica, NY | 7.9 GWh |
#2095 | Benthall Bridge PV 1 | Murfreesboro, NC | 7.9 GWh |
#2096 | IFF Union Beach Project | Union Beach, NJ | 7.9 GWh |
#2097 | Taylors Falls CSG | Taylor Falls, MN | 7.9 GWh |
#2098 | Big Bear | Los Angeles, CA | 7.9 GWh |
#2099 | Bright Hill Solar LLC(CSG) | Dansville, NY | 7.8 GWh |
#2100 | Dusenberry | Troy, NY | 7.8 GWh |
#2101 | Syncarpha Millbury Hybrid (CSG) | Millbury, MA | 7.8 GWh |
#2103 | Fisher Road Solar | Dartmouth, MA | 7.8 GWh |
#2104 | Freedom Solar | Nichols, SC | 7.8 GWh |
#2105 | Moraine CSG | Downs, IL | 7.8 GWh |
#2106 | Haynes Farm | Lincolnton, NC | 7.8 GWh |
#2107 | Allis Medina Solar LLC CSG | Medina, NY | 7.8 GWh |
#2108 | Farmingdale FA01 | Farmingdale, ME | 7.8 GWh |
#2109 | Palmyra PV - BD Solar Palmyra LLC | Palmyra, ME | 7.8 GWh |
#2110 | Waterville CSG Solar Holdings LLC | Waterville, MN | 7.8 GWh |
#2111 | Acme Solar, LLC | Riegelwood, NC | 7.8 GWh |
#2112 | Pine Hill | Johnston, RI | 7.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wyoming 2 CSG, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chisago Holdco LLC, CSG | Center City, MN | 4.2 GWh | 7.7 mi |
Chisago Solar | North Branch, MN | 11.6 GWh | 7.5 mi |
Cornillie | North Branch, MN | 1.6 GWh | 8 mi |
Cornillie 2 Community (CSG) | North Branch, MN | 1.5 GWh | 8 mi |
Cornillie Solar CSG | North Branch, MN | 1.7 GWh | 8 mi |
Eichtens II CSG | Winstead, MN | 1.6 GWh | 8.7 mi |
Forest Lake Solar CSG | Scandia, MN | 6.4 GWh | 7.2 mi |
Gemini Community Solar | Scandia, MN | 4.7 GWh | 7.9 mi |
Lindstrom Solar CSG | Lindstrom, MN | 5.3 GWh | 7.7 mi |
MSC-Scandia01 CSG | Scandia, MN | 1.7 GWh | 5.3 mi |
Nautilus Lindstrom Solar (CSG) | Lindstrom, MN | 3.4 GWh | 6.7 mi |
North Star Solar Project | North Branch, MN | 183.1 GWh | 8.5 mi |
Olinda Trail Solar | Lindstrom, MN | 2.1 GWh | 7.5 mi |
Scandia Community Solar Garden | Scandia, MN | 3.6 GWh | 8 mi |
Scandia CSG | Scandia, MN | 8.3 GWh | 7.6 mi |
USS Cheyenne Solar LLC CSG | Chisago City, MN | 1.9 GWh | 1.4 mi |
USS Good Solar CSG | Stacy, MN | 2.0 GWh | 6 mi |
USS Nillie Corn Solar CSG | North Branch, MN | 2.0 GWh | 7.8 mi |
USS Rockpoint Solar CSG | Stacy, MN | 1.9 GWh | 6.3 mi |
USS Solar Sources LLC CSG | Scandia, MN | 2.0 GWh | 8.7 mi |