Wylie is ranked #39 out of 190 power plants in South Carolina in terms of total annual net electricity generation.
Wylie is comprised of 4 generators and generated 18.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wylie |
---|---|
Utility Name | Duke Energy Carolinas, LLC |
Location | York County, SC |
Initial Operation Date | August 1925 |
Last Update | Dec 2023 |
Annual Generation | 128.9 GWh |
Annual Consumption | 486.0 k MMBtu |
Ranked #2,865 out of 11,835 Power Plants Nationwide | |
Ranked #296 out of 1,371 Water Power Plants Nationwide | |
Ranked #39 out of 190 South Carolina Power Plants | |
Ranked #8 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Map of Wylie
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wylie.
Monthly Net Generation for Wylie
Wylie Details
Summary Information | |
---|---|
Plant Name | Wylie (3271) |
Plant Address | 2701 Grey Rock Rd, Fort Mill, SC 29708 |
Utility | Duke Energy Carolinas, LLC (5416) |
Latitude, Longitude | 35.0218, -81.0078 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1925 |
Annual Generation | 128.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Catawba River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Minimum Load | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating August 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Minimum Load | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating August 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Minimum Load | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating August 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Wylie Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#286 | Cabin Creek | Georgetown, CO | 136.8 GWh |
#287 | Cowans Ford | Stanley, NC | 136.5 GWh |
#288 | Tenkiller Ferry | Gore, OK | 136.1 GWh |
#289 | Flatiron | Loveland, CO | 135.9 GWh |
#290 | Whillock | Morrilton, AR | 135.3 GWh |
#291 | Chicago Park | Colfax, CA | 134.7 GWh |
#292 | Oliver Dam | Columbus, GA | 134.4 GWh |
#293 | Stewarts Bridge | Corinth, NY | 133.6 GWh |
#294 | Wissota | Chippewa Falls, WI | 132.9 GWh |
#295 | Prairie Du Sac | Prairie du Sac, WI | 131.0 GWh |
#297 | Harris Dam | Lineville, AL | 128.9 GWh |
#298 | Red Rock Hydro Plant | Pella, IA | 128.8 GWh |
#299 | Webbers Falls | Webbers Falls, OK | 127.2 GWh |
#300 | Loon Lake | Fresh Pond, CA | 126.4 GWh |
#301 | Harriman | Whitingham, VT | 125.9 GWh |
#302 | Tulloch | Jamestown, CA | 124.9 GWh |
#303 | Tuckertown Hydro | New London, NC | 124.6 GWh |
#304 | Sand Bar Power Plant | Stanislaus Ntl. Fores, CA | 124.3 GWh |
#305 | Falls Hydro | Badin, NC | 124.1 GWh |
#306 | Columbus | Columbus, NE | 123.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wylie.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auten Road Farm, LLC | Gastonia, NC | 9.6 GWh | 20.9 mi |
Battleground | Kings Mountain, NC | 5.4 GWh | 22.8 mi |
Catawba | York, SC | 19.6 TWh | 4 mi |
DE Solar 10240 Old Dowd Rd | Charlotte, NC | 1.4 GWh | 15.5 mi |
DE Solar 1725 Drywall Dr | Mt. Holly, NC | 796.0 MWh | 21 mi |
G G Allen | Belmont, NC | 179.0 GWh | 11.6 mi |
Gaston Memorial Hospital | Gastonia, NC | 39.0 MWh | 19 mi |
Gaston Solar Power Plant | Cherryville Township, NC | 48.1 GWh | 22 mi |
Gastonia Solar Center | Gastonia, NC | 8.1 GWh | 17.6 mi |
Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh | 21.6 mi |
Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh | 23.6 mi |
Long Creek Waste Water Plant | Dallas, NC | 428.0 MWh | 21.4 mi |
Monroe Moore Farm | Monroe, NC | 9.3 GWh | 23.2 mi |
Monroe Solar Facility | Monroe, NC | 102.1 GWh | 22.5 mi |
Mountain Island | Mount Holly, NC | 99.6 GWh | 21.6 mi |
Orbit Energy Charlotte | Charlotte, NC | 8.5 GWh | 20 mi |
Reventure Park | Charlotte, NC | 22.4 GWh | 18.8 mi |
Sediver | York, SC | 63.0 MWh | 10.9 mi |
Thermal Kem | Rock Hill, SC | 55.0 MWh | 9.9 mi |
York Road Solar I, LLC | Kings Mountain, NC | 3.1 GWh | 23 mi |