Woodsdale
2100 Woodsdale Rd, Trenton, OH 45067Plant Summary Information
Woodsdale is ranked #36 out of 183 power plants in Ohio in terms of total annual net electricity generation.
Woodsdale is comprised of 6 generators and generated 120.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Woodsdale |
---|---|
Utility Name | Duke Energy Kentucky Inc |
Location | Butler County, OH |
Initial Operation Date | May 1992 |
Last Update | Sep 2024 |
Annual Generation | 326.8 GWh |
Annual Consumption | 4.7 M MMBtu |
Ranked #1,750 out of 11,852 Power Plants Nationwide | |
Ranked #631 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #36 out of 183 Ohio Power Plants | |
Ranked #19 out of 54 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
Map of Woodsdale
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodsdale.
Monthly Net Generation for Woodsdale
Woodsdale Details
Summary Information | |
---|---|
Plant Name | Woodsdale (7158) |
Plant Address | 2100 Woodsdale Rd, Trenton, OH 45067 |
Utility | Duke Energy Kentucky Inc (55729) |
Latitude, Longitude | 39.4492, -84.4611 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 1992 |
Annual Generation | 326.8 GWh |
Fuel Types | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT3 Details Operating May 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 80 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT5 Details Operating May 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 80 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT6 Details Operating May 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 80 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating July 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 80 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT4 Details Operating July 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 78 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT1 Details Operating May 1993
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 78 MW |
Winter Capacity | 94 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1993 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Woodsdale Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#621 | Permian Basin | Monahans, TX | 344.7 GWh |
#622 | Selkirk Cogen | Selkirk, NY | 339.2 GWh |
#623 | Georgia-Pacific Muskogee | Muskogee, OK | 374.1 GWh |
#624 | Medical Area Total Energy Plant | Boston, MA | 338.6 GWh |
#625 | Walnut Creek Energy Park | Industry, CA | 336.7 GWh |
#626 | Malburg | Vernon, CA | 333.2 GWh |
#627 | Trinidad (TX) | Trinidad, TX | 330.6 GWh |
#628 | Buchanan Generation LLC | Keen Mountain, VA | 329.2 GWh |
#629 | Ceredo Generating Station | Huntington, WV | 327.3 GWh |
#630 | Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh |
#632 | Calhoun Energy Center | Eastaboga, AL | 328.2 GWh |
#633 | Redding Power | Redding, CA | 320.3 GWh |
#634 | Yucca | Yuma, AZ | 320.2 GWh |
#635 | Culbertson Generation Station | Culbertson, MT | 316.6 GWh |
#636 | Sam Rayburn | Nursery, TX | 314.2 GWh |
#637 | Reeves | Albuquerque, NM | 309.4 GWh |
#638 | Zion Energy Center | Zion, IL | 310.5 GWh |
#639 | Shady Hills Generating Station | Shady Hills, FL | 307.7 GWh |
#640 | RED-Rochester, LLC | Rochester, NY | 303.0 GWh |
#641 | Primient Decatur Plant Cogen | Decatur, IL | 300.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodsdale.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 30.8 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 238.9 GWh | 21.9 mi |
Dicks Creek | Monroe, OH | 1.9 GWh | 4.6 mi |
East Campus Utility Plant | Cincinnati, OH | 212.7 MWh | 21.6 mi |
Hamilton (OH) | Hamilton, OH | 776.0 MWh | 5.7 mi |
Hamilton Hydro | HAMILTON, OH | 5.7 GWh | 5.6 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 7.3 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 32.8 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh | 32.9 mi |
Madison | Trenton, OH | 928.1 GWh | 0.3 mi |
Miami Fort | North Bend, OH | 5.1 TWh | 29.6 mi |
Middletown Coke Company, LLC | Middletown, OH | 333.0 GWh | 3.6 mi |
Middletown Energy Center | Middletown, OH | 3.5 TWh | 6.1 mi |
Monument | Dayton, OH | 30.0 MWh | 26.7 mi |
O H Hutchings | Miamisburg, OH | 208.0 MWh | 14.2 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 21.4 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 19.1 mi |
Richmond Solar Site 2 | Richmond, IN | 13.3 GWh | 32.6 mi |
Tait Electric Generating Station | Moraine, OH | 1.3 TWh | 23.4 mi |
Yankee Street | Centerville, OH | 4.7 GWh | 17.3 mi |