Woodmere Solar Farm
16161 Muller Road, Edison, CA 93307Plant Summary Information
Woodmere Solar Farm is ranked #221 out of 799 solar farms in California in terms of total annual net electricity generation.
Woodmere Solar Farm generated 5.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Woodmere Solar Farm |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | December 2015 |
Last Update | Dec 2023 |
Annual Generation | 31.0 GWh |
Annual Consumption | 110.3 k MMBtu |
Ranked #4,504 out of 11,835 Power Plants Nationwide | |
Ranked #982 out of 5,643 Solar Power Plants Nationwide | |
Ranked #609 out of 1,569 California Power Plants | |
Ranked #221 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
87RL 8me LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Woodmere Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodmere Solar Farm.
Monthly Net Generation for Woodmere Solar Farm
Woodmere Solar Farm Details
Summary Information | |
---|---|
Plant Name | Woodmere Solar Farm (59008) |
Plant Address | 16161 Muller Road, Edison, CA 93307 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.32306, -118.82139 |
Generation Dates on File | Dec 2015 to Dec 2023 |
Initial Operation Date | December 2015 |
Annual Generation | 31.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 18.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Woodmere Solar Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#972 | Buckingham Solar LLC | Cumberland, VA | 31.9 GWh |
#973 | Remington Solar Facility | Remington, VA | 31.9 GWh |
#974 | Glover Creek Solar, LLC | Summer Shade, KY | 31.8 GWh |
#975 | RE Bagdad Solar I LLC | Bagdad, AZ | 31.7 GWh |
#976 | Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 31.5 GWh |
#977 | NY8 - Puckett Solar | Chenango Forks, NY | 31.3 GWh |
#978 | Huron Solar Station | Huron, CA | 31.3 GWh |
#979 | High Shoals PV1 | High Shoals, NC | 31.2 GWh |
#980 | Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh |
#981 | UN-School House LLC | Morris Township, PA | 31.0 GWh |
#983 | North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh |
#984 | Williamston Speight Solar, LLC | Williamston, NC | 30.9 GWh |
#985 | Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh |
#986 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#987 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#988 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#989 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
#990 | Apple Data Center PV3 | Conover, NC | 30.3 GWh |
#991 | Hyder II Hybrid | Hyder, AZ | 30.3 GWh |
#992 | Correctional Solar LLC | Barhamsville, VA | 30.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodmere Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bakersfield 111 | Bakersfield, CA | 2.3 GWh | 9.5 mi |
Bakersfield College Solar 01 | Bakersfield, CA | 2.1 GWh | 10.3 mi |
Bakersfield Industrial PV 1 | Bakersfield, CA | 2.0 GWh | 9.7 mi |
Bakersfield PV 1 | Bakersfield, CA | 6.7 GWh | 9 mi |
Bear Mountain Limited | Bakersfield, CA | 40.4 GWh | 8.9 mi |
Hayworth Solar | Edison, CA | 58.4 GWh | 3.2 mi |
Improvement Dst No. 4 | Bakersfield, CA | 8.0 MWh | 13.4 mi |
Kern Oil & Refining Co | Bakersfield, CA | 34.6 GWh | 5.8 mi |
Kern River 1 | Bakersfield, CA | 167.0 GWh | 9.8 mi |
Kern River Cogeneration | Bakersfield, CA | 155.5 GWh | 12.8 mi |
Kern River Eastridge Cogen | Bakersfield, CA | 223.0 GWh | 11.3 mi |
Orion Solar I | Arvin, CA | 28.9 GWh | 12.3 mi |
Orion Solar II | Arvin, CA | 18.3 GWh | 12.3 mi |
Redcrest Solar Farm | Edison, CA | 28.0 GWh | 0.5 mi |
Redwood 4 Solar Farm | Edison, CA | 42.0 GWh | 0.8 mi |
Regulus Solar Project | Bakersfield, CA | 144.5 GWh | 2.3 mi |
Rio Bravo Hydro Project | Bakersfield, CA | 30.7 GWh | 7.4 mi |
Southeast Kern River Cogen | Bakersfield, CA | 95.7 GWh | 10.5 mi |
Sycamore Cogeneration | Bakersfield, CA | 376.5 GWh | 12.9 mi |
Western Power & Steam Inc | Bakersfield, CA | 37.6 GWh | 13.5 mi |