Woodland Solar
W Main Street & US Hwy 258 W, Woodland, NC 27897Plant Summary Information
Woodland Solar is ranked #264 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Woodland Solar generated 2.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Woodland Solar |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Northampton County, NC |
Initial Operation Date | April 2016 |
Last Update | Dec 2023 |
Annual Generation | 9.1 GWh |
Annual Consumption | 32.6 k MMBtu |
Ranked #6,166 out of 11,852 Power Plants Nationwide | |
Ranked #1,716 out of 5,655 Solar Power Plants Nationwide | |
Ranked #338 out of 863 North Carolina Power Plants | |
Ranked #264 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Woodland Solar LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Woodland Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodland Solar.
Monthly Net Generation for Woodland Solar
Woodland Solar Details
Summary Information | |
---|---|
Plant Name | Woodland Solar (59175) |
Plant Address | W Main Street & US Hwy 258 W, Woodland, NC 27897 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 36.34194, -77.22111 |
Generation Dates on File | Apr 2016 to Dec 2023 |
Initial Operation Date | April 2016 |
Annual Generation | 9.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 13-683-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) NC |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 5MWPV Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Woodland Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Woodland Solar, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1706 | Tiburon Holdings | Advance, NC | 9.2 GWh |
#1707 | Bayboro Solar Farm | Alliance, NC | 9.2 GWh |
#1708 | Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 9.2 GWh |
#1709 | Mustang Solar | Robbins, NC | 9.2 GWh |
#1710 | Windsor Solar | Windsor, NC | 9.2 GWh |
#1711 | Lincoln Solar, LLC (NC) | Bostic, NC | 9.2 GWh |
#1712 | Monroe County Sites C, D, & E | Hilton, NY | 9.2 GWh |
#1713 | Sweetgum Solar | Sanford, NC | 9.2 GWh |
#1714 | Scenic Hill Solar III | Clarksville, AR | 9.1 GWh |
#1715 | Creech Solar 2, LLC | Garner, NC | 9.1 GWh |
#1717 | Walcott Solar CSG | Faribault, MN | 9.1 GWh |
#1718 | Long Farm 46 Solar, LLC | Garysburg, NC | 9.1 GWh |
#1719 | Owen Solar | Lincolnton, NC | 9.1 GWh |
#1720 | Richmond CSG | Richmond, MN | 9.1 GWh |
#1721 | Bordentown Solar | Burlington, NJ | 9.1 GWh |
#1722 | Route 19 #2 Community Solar Farm | Pike, NY | 9.1 GWh |
#1723 | Roxboro Farm | Roxboro, NC | 9.1 GWh |
#1724 | Bearford Farm Solar Project | Willard, NC | 9.1 GWh |
#1725 | GKS Solar | Belvidere, NC | 9.1 GWh |
#1726 | Soluga Farms III | Godwin, NC | 9.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodland Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ahoskie | Ahoskie, NC | 7.4 GWh | 12.9 mi |
Aulander Holloman Solar, LLC | Aulander, NC | 190.9 GWh | 9.3 mi |
Aulander Hwy 42 Solar, LLC | Aulander, NC | 8.4 GWh | 9.9 mi |
Baker PV 1 | Aulander, NC | 8.3 GWh | 10.2 mi |
Benthall Bridge PV 1 | Murfreesboro, NC | 7.9 GWh | 8.6 mi |
Bradley PV1 | Aulander, NC | 7.7 GWh | 9.8 mi |
Colice Hall Solar | Ahoskie, NC | 18.1 GWh | 11.8 mi |
Hertford Solar Power, LLC | Ahoskie, NC | 20.7 GWh | 11.9 mi |
HWY 158 PV | Murfreesboro, NC | 18.4 GWh | 9.9 mi |
Kelford | Lewiston Woodville, NC | 27.5 GWh | 13.4 mi |
Kelford | Kelford, NC | 8.6 GWh | 13 mi |
Lewiston Solar | Lewiston, NC | 8.8 GWh | 13.9 mi |
Phelps 158 Solar Farm | Conway, NC | 9.8 GWh | 7.7 mi |
Simons Farm | Ahoskie, NC | 9.0 GWh | 12.7 mi |
Solar Star North Carolina II LLC | Murfreesboro, NC | 8.7 GWh | 10.5 mi |
Turkey Creek PV1 | Kirby, NC | 20.0 GWh | 8.4 mi |
Underwood PV2 | Murfreesboro, NC | 27.9 GWh | 10.9 mi |
Vaughn Creek PV1 | Murfreesboro, NC | 33.4 GWh | 9.4 mi |
White Farm Solar, LLC | Woodland, NC | 9.8 GWh | 0.4 mi |
Winton Solar | Winton, NC | 9.0 GWh | 15.9 mi |