Woodland Pulp, LLC
144 Main Street, Baileyville, ME 4694Plant Summary Information
Woodland Pulp, LLC is ranked #9 out of 161 power plants in Maine in terms of total annual net electricity generation.
Woodland Pulp, LLC is comprised of 12 generators and generated 103.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Woodland Pulp, LLC |
---|---|
Utility Name | Woodland Pulp LLC |
Location | Washington County, ME |
Initial Operation Date | June 1906 |
Last Update | Dec 2023 |
Annual Generation | 366.6 GWh |
Annual Consumption | 9.4 M MMBtu |
Ranked #1,607 out of 11,852 Power Plants Nationwide | |
Ranked #52 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #9 out of 161 Maine Power Plants | |
Ranked #3 out of 5 Maine Black Liquor Power Plants | |
Fuel Types | Black Liquor : 41.9% Natural Gas : 33.3% Water : 17.5% Wood/Wood Waste Solids : 7.3% |
Map of Woodland Pulp, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodland Pulp, LLC.
Monthly Net Generation for Woodland Pulp, LLC
Woodland Pulp, LLC Details
Summary Information | |
---|---|
Plant Name | Woodland Pulp, LLC (10613) |
Plant Address | 144 Main Street, Baileyville, ME 4694 |
Utility | Woodland Pulp LLC (5232) |
Latitude, Longitude | 45.1554, -67.4012 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1906 |
Annual Generation | 366.6 GWh |
Fuel Types | Black Liquor : 41.9% Natural Gas : 33.3% Water : 17.5% Wood/Wood Waste Solids : 7.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 93-121-000 |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 93-121-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New Brunswick System Operator (NBSO) |
NAICS Code | (322122) |
Sector | Industrial CHP (7) |
Water Source | Treated Surface water |
Ash Impoundment | No |
Transmission / Distribution Owner | Eastern Maine Electric Coop (5609) ME |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | MARITIMES NORTHEAST PIPELINE LLC |
Natural Gas Storage | No |
Generator HG4 Details Standby June 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1906 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator HG5 Details Standby June 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1906 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator HG6 Details Standby June 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1906 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator HG1 Details Operating June 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.9 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1912 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HG2 Details Standby June 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.9 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1912 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HG3 Details Operating June 1929
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.1 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1929 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator TG10 Details Operating March 1966
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1966 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Black Liquor / Natural Gas / Wood/Wood Waste Solids / Residual Fuel Oil |
Startup Source | Residual Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BLQ / RFO / WDS |
---|
Generator TG11 Details Operating March 1970
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 26.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1970 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
Energy Source | Black Liquor / Natural Gas / Wood/Wood Waste Solids / Residual Fuel Oil |
Startup Source | Residual Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BLQ / RFO / WDS |
---|
Generator HG10 Details Standby June 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HG7 Details Operating June 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator HG8 Details Operating June 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator HG9 Details Operating June 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Woodland Pulp, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#42 | International Paper Texarkana Mill | Queen City, TX | 378.2 GWh |
#43 | Alabama River Pulp | Perdue Hill, AL | 302.9 GWh |
#44 | WestRock Demopolis Mill | Demopolis, AL | 290.7 GWh |
#45 | Georgia-Pacific Palatka Operations | Palatka, FL | 320.3 GWh |
#46 | Escanaba Mill | Escanaba, MI | 408.7 GWh |
#47 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 344.1 GWh |
#48 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 278.9 GWh |
#49 | International Paper Pensacola | Cantonment, FL | 336.2 GWh |
#50 | Riverwood International Macon Mill | Macon, GA | 359.3 GWh |
#51 | International Paper Co. - New Bern Mill | New Bern, NC | 197.8 GWh |
#53 | Buckeye Florida LP | Perry, FL | 270.5 GWh |
#54 | International Paper - Orange | Orange, TX | 238.6 GWh |
#55 | Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh |
#56 | Nippon Dynawave Packaging Longview WA | Longview, WA | 293.2 GWh |
#57 | Plant 31 Paper Mill | West Monroe, LA | 490.9 GWh |
#58 | Hopewell Mill | Hopewell, VA | 285.1 GWh |
#59 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 196.5 GWh |
#60 | Canton North Carolina | Canton, NC | 281.5 GWh |
#61 | International Paper Vicksburg Mill | Vicksburg, MS | 205.1 GWh |
#62 | WestRock (WA) | Tacoma, WA | 196.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodland Pulp, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BD Solar Ellsworth LLC | Augusta, ME | 1.9 GWh | 64.3 mi |
BD Solar Hancock LLC | Augusta, ME | 6.2 GWh | 63.4 mi |
Bull Hill Wind Project | Eastbrook, ME | 81.6 GWh | 50.8 mi |
Corkwood Solar (CSG) | Howland, ME | 344.0 MWh | 62 mi |
Hancock Wind Plant | T22 MD, ME | 108.2 GWh | 45.5 mi |
Indeck West Enfield Energy Center | West Enfield, ME | 13.5 GWh | 60.1 mi |
Medway Hydro | Medway, ME | 27.5 GWh | 63.7 mi |
Milford Hydro Station | Milford, ME | 53.0 GWh | 62.5 mi |
Orono B | Orono, ME | 25.5 GWh | 64.4 mi |
Orono Hydro Station | Orono, ME | 11.6 GWh | 64.6 mi |
Passadumkeag Windpark LLC | Greenbush, ME | 121.1 GWh | 39.9 mi |
Pisgah Mountain Wind | Clifton, ME | 24.2 GWh | 60.8 mi |
Pumpkin Hill | Lowell, ME | 5.5 GWh | 51.9 mi |
Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh | 62.5 mi |
Rollins Wind Project | Winn Village, ME | 132.2 GWh | 49.4 mi |
Silver Maple | Clifton, ME | 52.1 GWh | 60.5 mi |
Stetson Wind I | Danforth, ME | 106.6 GWh | 36.6 mi |
Stetson Wind II | Danforth, ME | 45.7 GWh | 42.1 mi |
Weaver Wind | Township 16, ME | 195.2 GWh | 47.8 mi |
West Enfield Hydro | West Enfield, ME | 100.4 GWh | 61.1 mi |