Wonderful Orchards - Westside
Twisselman rd. 1/4 mile east o, Lost Hills, CA 93250Plant Summary Information
Wonderful Orchards - Westside is ranked #274 out of 747 solar farms in California in terms of total annual net electricity generation.
Wonderful Orchards - Westside generated 3.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Wonderful Orchards - Westside |
---|---|
Utility Name | Wonderful Renewable Energy, LLC. |
Location | Kern County, CA |
Initial Operation Date | August 2021 |
Last Update | Dec 2022 |
Annual Generation | 12.9 GWh |
Annual Consumption | 47.2 k MMBtu |
Ranked #5,477 out of 11,249 Power Plants Nationwide | |
Ranked #1,274 out of 5,158 Solar Power Plants Nationwide | |
Ranked #769 out of 1,501 California Power Plants | |
Ranked #274 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Wonderful Orchards - Westside
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wonderful Orchards - Westside.
Monthly Net Generation for Wonderful Orchards - Westside
Wonderful Orchards - Westside Details
Summary Information | |
---|---|
Plant Name | Wonderful Orchards - Westside (64220) |
Plant Address | Twisselman rd. 1/4 mile east o Lost Hills, CA 93250 |
Utility | Wonderful Renewable Energy, LLC. (63689) |
Latitude, Longitude | 35.73277, -119.74523 |
Generation Dates on File | Aug 2021 to Dec 2022 |
Initial Operation Date | August 2021 |
Annual Generation | 12.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Crop Production (111) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator WOC Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 4.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 35 |
DC Net Capacity | 6.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 6.9 MW |
Virtual Net Metering Agreement | No |
Wonderful Orchards - Westside Plant Owners
Owner Name | Address | Ownership |
---|---|---|
DG Harvest Solar, LLC | 700 Universe Boulevard, Juno Beach, FL 33408 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1264 | Raritan Solar | Ringoes, NJ | 13.1 GWh |
#1265 | Valley Center 2 | Valley Center, CA | 13.1 GWh |
#1266 | Exelon Solar Chicago | Chicago, IL | 13.1 GWh |
#1267 | SunE CPS3 LLC | Somerset, TX | 13.1 GWh |
#1268 | USPS PV | Los Angeles, CA | 13.1 GWh |
#1269 | Springfield Solar Project | Springfield Twp., NJ | 13.1 GWh |
#1270 | Pine Tree Solar Project | Owenyo, CA | 13.1 GWh |
#1271 | Spartan PV 1, LLC | East Lansing, MI | 13.1 GWh |
#1272 | Summer North Solar | Lancaster, CA | 13.0 GWh |
#1273 | Kearney NPPD Solar Project | Kearney, NE | 12.9 GWh |
#1275 | Hermsdorf Solar | Madison, WI | 12.8 GWh |
#1276 | Blake Solar Plant | Charles Town, WV | 12.8 GWh |
#1277 | Gaston II | Swansea, SC | 12.8 GWh |
#1278 | Flemington Solar | Flemington, NJ | 12.8 GWh |
#1279 | Grants CDEC 2 | Grants, NM | 12.7 GWh |
#1280 | Volkswagen Solar System | Chattanooga, TN | 12.7 GWh |
#1281 | Dodge Center Solar | Dodge Center, MN | 12.7 GWh |
#1282 | West Pemberton | Pemberton Twp, NJ | 12.6 GWh |
#1283 | Bartow Solar Energy LLC | Bartow, FL | 12.6 GWh |
#1284 | Parkland Landfill Solar | Bordentown, NJ | 12.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wonderful Orchards - Westside.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alpaugh North | Alpaugh, CA | 48.5 GWh | 20.6 mi |
Atwell Island | Alpaugh, CA | 39.0 GWh | 17.3 mi |
Atwell Island West Solar | Alpaugh, CA | 45.6 GWh | 17 mi |
Blackwell Solar Park | Lost Hills, CA | 47.0 GWh | 10 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 72.3 GWh | 8.4 mi |
Coronal Lost Hills | Lost Hills, CA | 49.5 GWh | 9 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 34.1 GWh | 13.4 mi |
Elk Hills Cogen | Tupman, CA | 54.3 GWh | 17.5 mi |
Lost Hills Cogeneration Plant | Lost Hills, CA | 3.0 GWh | 4.8 mi |
Lost Hills/Blackwell | Lost Hills, CA | 91.1 GWh | 9.8 mi |
Morelos del Sol | Lost Hills, CA | 35.7 GWh | 4.1 mi |
Nickel 1 Solar Facility | Lost Hills, CA | 2.8 GWh | 6.1 mi |
Roll Lost Hills | Lost Hills, CA | 6.9 GWh | 9.8 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 479.9 GWh | 20.4 mi |
White River Solar | Alpaugh, CA | 50.4 GWh | 18.5 mi |
Wildwood Solar I, LLC | Wasco, CA | 48.9 GWh | 12.4 mi |
Wildwood Solar II | Wasco, CA | 38.0 GWh | 12 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 4.5 GWh | 11.1 mi |
Wonderful Lost Hills | Lost Hills, CA | 50.4 GWh | 8.6 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 12.1 GWh | 16.1 mi |