Wonderful Orchards - Belridge
West of Hwy 33, North of Lerdo, Lost Hills, CA 93249Plant Summary Information
Wonderful Orchards - Belridge is ranked #283 out of 806 solar farms in California in terms of total annual net electricity generation.
Wonderful Orchards - Belridge generated 2.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wonderful Orchards - Belridge |
---|---|
Utility Name | Wonderful Renewable Energy, LLC. |
Location | Kern County, CA |
Initial Operation Date | December 2020 |
Last Update | Dec 2023 |
Annual Generation | 11.9 GWh |
Annual Consumption | 42.4 k MMBtu |
Ranked #5,716 out of 11,949 Power Plants Nationwide | |
Ranked #1,463 out of 5,739 Solar Power Plants Nationwide | |
Ranked #798 out of 1,577 California Power Plants | |
Ranked #283 out of 806 California Solar Power Plants | |
Fuel Types | Solar |
Map of Wonderful Orchards - Belridge
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wonderful Orchards - Belridge.
Monthly Net Generation for Wonderful Orchards - Belridge
Wonderful Orchards - Belridge Details
Summary Information | |
---|---|
Plant Name | Wonderful Orchards - Belridge (64221) |
Plant Address | West of Hwy 33, North of Lerdo, Lost Hills, CA 93249 |
Utility | Wonderful Renewable Energy, LLC. (63689) |
Latitude, Longitude | 35.50012, -119.74935 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | December 2020 |
Annual Generation | 11.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Crop Production (111) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator WOC Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 4.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 35 |
DC Net Capacity | 6.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5 MW |
Virtual Net Metering Agreement | No |
Wonderful Orchards - Belridge Plant Owners
Owner Name | Address | Ownership |
---|---|---|
DG California Solar LLC | 700 Universe Blvd, Juno Beach, FL 33408 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1453 | NorthPark Solar | Millstone, NJ | 12.2 GWh |
#1454 | Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.2 GWh |
#1455 | Raritan Solar - 53 Highway | Raritan Township, NJ | 12.2 GWh |
#1456 | Norton Creek | TBD, FL | 12.2 GWh |
#1457 | Azalea Solar, LLC | Davisboro, GA | 12.2 GWh |
#1458 | Grants CDEC 2 | Grants, NM | 12.2 GWh |
#1459 | Saluda Solar, LLC | Saluda, SC | 12.1 GWh |
#1460 | Bullock Road Solar 1 | Freetown, MA | 12.1 GWh |
#1461 | Blue Star | Massey, MD | 12.1 GWh |
#1462 | Grove Solar Center, LLC | Vale, OR | 12.0 GWh |
#1464 | Springfield Solar Project | Springfield Twp., NJ | 11.9 GWh |
#1465 | Hecate Energy Clarke County LLC | White Post, VA | 11.9 GWh |
#1466 | Peacock Energy Project | TX | 11.8 GWh |
#1467 | Wonderful Orchards - Westside | Lost Hills, CA | 11.8 GWh |
#1468 | Wyandot Solar Farm | Upper Sandusky, OH | 11.8 GWh |
#1469 | Raritan Solar | Ringoes, NJ | 11.8 GWh |
#1470 | Whiskey Solar | Cumberland, NC | 11.8 GWh |
#1471 | Pitkin County Solar | Aspen, CO | 11.8 GWh |
#1472 | SCDA Solar 1 | Sacramento, CA | 11.8 GWh |
#1473 | Volkswagen Solar System | Chattanooga, TN | 11.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wonderful Orchards - Belridge.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blackwell Solar Park | Lost Hills, CA | 40.1 GWh | 9.4 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 64.9 GWh | 8.9 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 25.3 GWh | 11.5 mi |
Cymric 31X Cogen | McKittrick, CA | 37.2 GWh | 10.7 mi |
Cymric 36W Cogen | McKittrick, CA | 54.4 GWh | 10.3 mi |
Cymric 6Z Cogen | McKittrick, CA | 37.1 GWh | 12.2 mi |
Elk Hills Cogen | Tupman, CA | 95.5 GWh | 1.6 mi |
Lost Hills Cogeneration Plant | Lost Hills, CA | 2.6 GWh | 11.5 mi |
Lost Hills Oilfield | Lost Hills, CA | 4.4 GWh | 11.8 mi |
Lost Hills/Blackwell | Lost Hills, CA | 77.1 GWh | 10 mi |
McKittrick Limited | Bakersfield, CA | 10.7 GWh | 13.4 mi |
Nickel 1 Solar Facility | Lost Hills, CA | 2.8 GWh | 10.3 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh | 6.9 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 48.0 GWh | 8.6 mi |
Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 13.2 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 484.6 GWh | 4.9 mi |
Welport Lease Project | McKittrick, CA | 20.7 GWh | 11.2 mi |
Wildwood Solar I, LLC | Wasco, CA | 44.7 GWh | 12.5 mi |
Wildwood Solar II | Wasco, CA | 36.6 GWh | 13.3 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 3.8 GWh | 5.7 mi |