Wolf Hollow I LP
9201 Wolf Hollow Court, Granbury, TX 76048Plant Summary Information
Wolf Hollow I LP is ranked #46 out of 749 power plants in Texas in terms of total annual net electricity generation.
Wolf Hollow I LP is comprised of 3 generators and generated 1.2 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Wolf Hollow I LP |
---|---|
Utility Name | Wolf Hollow I Power, LLC |
Location | Hood County, TX |
Initial Operation Date | August 2003 |
Last Update | Aug 2024 |
Annual Generation | 3.0 TWh |
Annual Consumption | 25.6 M MMBtu |
Ranked #379 out of 11,835 Power Plants Nationwide | |
Ranked #226 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #46 out of 749 Texas Power Plants | |
Ranked #35 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Exelon Power (2013 to 2017) Wolf Hollow I Power, LLC (2018 to 2023) |
Map of Wolf Hollow I LP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wolf Hollow I LP.
Monthly Net Generation for Wolf Hollow I LP
Wolf Hollow I LP Details
Summary Information | |
---|---|
Plant Name | Wolf Hollow I LP (55139) |
Plant Address | 9201 Wolf Hollow Court, Granbury, TX 76048 |
Utility | Wolf Hollow I Power, LLC (313) |
Latitude, Longitude | 32.33422, -97.73169 |
Generation Dates on File | Aug 2003 to Aug 2024 |
Initial Operation Date | August 2003 |
Annual Generation | 3.0 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-111-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lake Granbury |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
ENTERPRISE TEXAS PIPELINE WORSHAM-STEED GAS STORAGE LLC |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WHCCS_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WHCCS_CC1 |
Nameplate Capacity | 243.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 236 MW |
Winter Capacity | 250.5 MW |
Minimum Load | 84 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WHCCS_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WHCCS_CC1 |
Nameplate Capacity | 243.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 234.5 MW |
Winter Capacity | 249 MW |
Minimum Load | 84 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | WHCCS_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WHCCS_CC1 |
Nameplate Capacity | 300.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 280 MW |
Winter Capacity | 293 MW |
Minimum Load | 84 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Wolf Hollow I LP Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#216 | Harrison County Power Project | Marshall, TX | 3.2 TWh |
#217 | Wansley Unit 9 | Franklin, GA | 3.2 TWh |
#218 | Desert Basin | Casa Grande, AZ | 3.2 TWh |
#219 | Jack Fusco Energy Center | Thompsons, TX | 3.2 TWh |
#220 | High Bridge | St. Paul, MN | 3.2 TWh |
#221 | Granite Ridge | Londonderry, NH | 3.2 TWh |
#222 | Los Medanos Energy Center | Pittsburg, CA | 3.1 TWh |
#223 | Carty Generating Station | Boardman, OR | 3.1 TWh |
#224 | Westbrook Energy Center Power Plant | Westbrook, ME | 3.1 TWh |
#225 | Hermiston Generating Plant | Hermiston, OR | 3.0 TWh |
#227 | McWilliams | Gantt, AL | 3.0 TWh |
#228 | Decatur Energy Center | Decatur, AL | 3.0 TWh |
#229 | Carville Energy LLC | St Gabriel, LA | 3.0 TWh |
#230 | Whiting Clean Energy | Whiting, IN | 3.0 TWh |
#231 | Metcalf Energy Center | San Jose, CA | 3.0 TWh |
#232 | Colusa Generating Station | Maxwell, CA | 3.0 TWh |
#233 | Gateway Generating Station | Antioch, CA | 2.9 TWh |
#234 | Arthur Von Rosenberg | Elmendorf, TX | 2.9 TWh |
#235 | Attala | Sallis, MS | 2.9 TWh |
#236 | East River | New York, NY | 2.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wolf Hollow I LP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Outlet Hydroelectric Generator | Fort Worth, TX | 6.9 MWh | 35.4 mi |
Buckthorn Wind | Mingus, TX | 374.6 GWh | 37.8 mi |
Comanche Peak | Glen Rose, TX | 19.7 TWh | 4 mi |
DeCordova Steam Electric Station | Granbury, TX | 95.5 GWh | 5.1 mi |
Johnson County | Cleburne, TX | 1.1 TWh | 19.4 mi |
OTHERTraditionClearfork | Fort Worth, TX | 42.0 MWh | 31.9 mi |
TPE Erath Solar, LLC | Stephenville, TX | 25.2 GWh | 28.2 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 18.8 GWh | 29.7 mi |
WAL284 | Mansfield, TX | 356.0 MWh | 38.9 mi |
WAL3284 | Arlington, TX | 313.0 MWh | 38.1 mi |
WAL3631 | Crowley, TX | 365.0 MWh | 28.4 mi |
WAL3773 | Fort Worth, TX | 371.0 MWh | 33.1 mi |
WAL4509 | Tarrant, TX | 353.0 MWh | 28.3 mi |
WAL940 | Westworth Village, TX | 338.0 MWh | 33.9 mi |
WAL972 | Fort Worth, TX | 287.0 MWh | 37.5 mi |
Walnut Springs Solar | Walnut Springs, TX | 10.9 GWh | 17.8 mi |
Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh | 29.3 mi |
Whitney | Clifton, TX | 2.5 GWh | 38.6 mi |
Wolf Hollow II | Granbury, TX | 7.2 TWh | 0.3 mi |
Yellow Jacket | Meridian, TX | 10.5 GWh | 28 mi |