Wise County Power LLC
800 Boons Creek Lane, Poolville, TX 76487Plant Summary Information
Wise County Power LLC is ranked #40 out of 774 power plants in Texas in terms of total annual net electricity generation.
Wise County Power LLC is comprised of 3 generators and generated 524.6 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Wise County Power LLC |
---|---|
Utility Name | Wise County Power Company LLC |
Location | Wise County, TX |
Initial Operation Date | July 2004 |
Last Update | Jan 2025 |
Annual Generation | 3.4 TWh |
Annual Consumption | 26.7 M MMBtu |
Ranked #341 out of 11,979 Power Plants Nationwide | |
Ranked #198 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #40 out of 774 Texas Power Plants | |
Ranked #30 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Wise County Power Company LLC (2013 to 2015) Wise County Power Company LLC (2016 to 2023) |
Map of Wise County Power LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wise County Power LLC.
Monthly Net Generation for Wise County Power LLC
Wise County Power LLC Details
Summary Information | |
---|---|
Plant Name | Wise County Power LLC (55320) |
Plant Address | 800 Boons Creek Lane, Poolville, TX 76487 |
Utility | Wise County Power Company LLC (21668) |
Latitude, Longitude | 33.0583, -97.9103 |
Generation Dates on File | Aug 2004 to Jan 2025 |
Initial Operation Date | July 2004 |
Annual Generation | 3.4 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 00-240-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 350.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
ENLINK TUSCALOOSA LLC ENERGY TRANSFER FUEL LP WORSHAM-STEED GAS STORAGE LLC |
Natural Gas Storage | No |
Generator GT1 Details Operating July 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | WCPP_CT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WCPP CT1 |
Nameplate Capacity | 261 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 245 MW |
Winter Capacity | 261 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2004 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating July 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | WCPP CT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WCPP CT2 |
Nameplate Capacity | 261 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 245 MW |
Winter Capacity | 261 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2004 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating July 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | WCPP ST1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WCPP ST1 |
Nameplate Capacity | 299.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 245 MW |
Winter Capacity | 260 MW |
Minimum Load | 130 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2004 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Wise County Power LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#188 | Northport | Northport, NY | 3.7 TWh |
#189 | Lagoon Creek | Brownsville, TN | 3.5 TWh |
#190 | Arlington Valley Energy Facility | Arlington, AZ | 3.5 TWh |
#191 | Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.5 TWh |
#192 | Bethlehem Energy Center | Glenmont, NY | 3.5 TWh |
#193 | Rhode Island State Energy Center | Johnston, RI | 3.5 TWh |
#194 | Bridgeport Station | Bridgeport, CT | 3.5 TWh |
#195 | Woodbridge Energy Center | Keasbey, NJ | 3.5 TWh |
#196 | West Phoenix | Phoenix, AZ | 3.5 TWh |
#197 | Bear Garden | New Canton, VA | 3.5 TWh |
#199 | Curtis H Stanton Energy Center | Orlando, FL | 3.4 TWh |
#200 | Wansley Unit 9 | Franklin, GA | 3.4 TWh |
#201 | Marshalltown Generating Station | Marshalltown, IA | 3.4 TWh |
#202 | Osprey Energy Center Power Plant | Auburndale, FL | 3.4 TWh |
#203 | Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh |
#204 | Cherokee | Denver, CO | 3.4 TWh |
#205 | Hermiston Generating Plant | Hermiston, OR | 3.4 TWh |
#206 | Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh |
#207 | Riverside Energy Center | Beloit, WI | 3.3 TWh |
#208 | Harry Allen | Las Vegas, NV | 3.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wise County Power LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barton Chapel Wind Farm | Jacksboro, TX | 241.6 GWh | 24.2 mi |
Bridgeport Gas Processing Plant | Bridgeport, TX | 49.6 GWh | 11.4 mi |
Connolly BESS | Decatur, TX | 13.5 GWh | 30.3 mi |
Graham | Graham, TX | 1.2 TWh | 40.9 mi |
Jack County | Bridgeport, TX | 6.8 TWh | 4 mi |
Keechi Wind | Jacksboro, TX | 411.9 GWh | 15.7 mi |
OTHERTraditionClearfork | Fort Worth, TX | 42.0 MWh | 37.9 mi |
Porter Solar, LLC (TX) | Krum, TX | 113.6 GWh | 35.8 mi |
R W Miller | Palo Pinto, TX | 519.2 GWh | 36.1 mi |
Senate Wind LLC | Bryson, TX | 463.1 GWh | 28.2 mi |
Shannon Wind | Windhorst, TX | 474.2 GWh | 40.6 mi |
WAL2980 | Fort Worth, TX | 315.0 MWh | 37.9 mi |
WAL3773 | Fort Worth, TX | 371.0 MWh | 32 mi |
WAL4509 | Tarrant, TX | 353.0 MWh | 36.8 mi |
WAL5312 | Fort Worth, TX | 296.0 MWh | 40.9 mi |
WAL5316 | Saginaw, TX | 354.0 MWh | 32.7 mi |
WAL5764 | Fort Worth, TX | 318.0 MWh | 29.5 mi |
WAL940 | Westworth Village, TX | 338.0 MWh | 34.7 mi |
WAL972 | Fort Worth, TX | 287.0 MWh | 32.9 mi |
Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh | 31.6 mi |