Windy Flats Wind Project
24 Stringstreet Rd, Centerville, WA 98613Plant Summary Information
Windy Flats Wind Project is ranked #31 out of 134 power plants in Washington in terms of total annual net electricity generation.
Windy Flats Wind Project generated 71.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Windy Flats Wind Project |
---|---|
Utility Name | Windy Flats Partners LLC |
Location | Klickitat County, WA |
Initial Operation Date | October 2009 |
Last Update | Dec 2023 |
Annual Generation | 567.8 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,151 out of 11,835 Power Plants Nationwide | |
Ranked #282 out of 1,343 Wind Power Plants Nationwide | |
Ranked #31 out of 134 Washington Power Plants | |
Ranked #4 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Windy Flats Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Windy Flats Wind Project.
Monthly Net Generation for Windy Flats Wind Project
Windy Flats Wind Project Details
Summary Information | |
---|---|
Plant Name | Windy Flats Wind Project (57159) |
Plant Address | 24 Stringstreet Rd, Centerville, WA 98613 |
Utility | Windy Flats Partners LLC (56514) |
Latitude, Longitude | 45.7269, -120.8339 |
Generation Dates on File | Oct 2009 to Dec 2023 |
Initial Operation Date | October 2009 |
Annual Generation | 567.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 09-33-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Klickitat County (10393) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating October 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 262.2 MW |
Summer Capacity | 262.2 MW |
Winter Capacity | 262.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 114 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 114 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 15 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 262.4 |
Windy Flats Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#272 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 574.4 GWh |
#273 | Solano Wind | Rio Vista, CA | 574.4 GWh |
#274 | English Farms | Montezuma, IA | 573.5 GWh |
#275 | FPL Energy Story Wind LLC | Zearing, IA | 572.6 GWh |
#276 | Weatherford Wind Energy Center | Weatherford, OK | 571.7 GWh |
#277 | Limon Wind I | Limon, CO | 571.6 GWh |
#278 | Century | Blairsburg, IA | 570.0 GWh |
#279 | Alta Farms II Wind Project, LLC | Clinton, IL | 568.9 GWh |
#280 | Blue Canyon Windpower II | Carnegie, OK | 568.5 GWh |
#281 | Pilot Hill Wind Farm | Herscher, IL | 568.0 GWh |
#283 | Blue Cloud Wind Energy LLC | Sudan, TX | 567.7 GWh |
#284 | Colorado Green Holdings LLC | Lamar, CO | 566.9 GWh |
#285 | Wheatridge Hybrid | Morrow, OR | 688.0 GWh |
#286 | Bishop Hill Energy LLC | Cambridge, IL | 564.1 GWh |
#287 | Stella Wind Farm | Armstrong, TX | 563.3 GWh |
#288 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 561.6 GWh |
#289 | Old Settler Wind | Floydada, TX | 561.5 GWh |
#290 | King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh |
#291 | Panorama Wind, LLC | Grover, CO | 561.2 GWh |
#292 | Marengo Wind Plant | Dayton, WA | 560.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Windy Flats Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biglow Canyon Wind Farm | Wasco, OR | 926.4 GWh | 12.2 mi |
Dalles Dam North Fishway Project | The Dalles, OR | 41.6 GWh | 16.6 mi |
Golden Hill Wind | Wasco, OR | 584.0 GWh | 12.9 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 5.8 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 15.5 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 24.2 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 19 mi |
John Day | Rufus, OR | 6.9 TWh | 6.8 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 18.1 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 15.9 mi |
Klondike Windpower III | Wasco, OR | 681.0 GWh | 18.7 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 2.7 mi |
Lund Hill Solar | Bickleton, WA | 342.2 GWh | 25.6 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 13.1 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 22.7 mi |
The Dalles | The Dalles, OR | 5.4 TWh | 16.5 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 10.6 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 25.1 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 24.5 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 15 mi |