Windsor Floating Solar
84000 Windsor Road, Windsor, CA 95492Plant Summary Information
Windsor Floating Solar is ranked #576 out of 799 solar farms in California in terms of total annual net electricity generation.
Windsor Floating Solar generated 420.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Windsor Floating Solar |
---|---|
Utility Name | CA ODEVI LLC |
Location | Sonoma County, CA |
Initial Operation Date | November 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.5 GWh |
Annual Consumption | 9.0 k MMBtu |
Ranked #9,374 out of 11,835 Power Plants Nationwide | |
Ranked #4,171 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,301 out of 1,569 California Power Plants | |
Ranked #576 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Windsor Floating Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Windsor Floating Solar.
Monthly Net Generation for Windsor Floating Solar
Windsor Floating Solar Details
Summary Information | |
---|---|
Plant Name | Windsor Floating Solar (62902) |
Plant Address | 84000 Windsor Road, Windsor, CA 95492 |
Utility | CA ODEVI LLC (62772) |
Latitude, Longitude | 38.53917, -122.81508 |
Generation Dates on File | Nov 2020 to Dec 2023 |
Initial Operation Date | November 2020 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator WUS15 Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Windsor Floating Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4161 | Jeffco Community Solar Gardens LLC | Arvada, CO | 2.5 GWh |
#4162 | Washington Solar (SC) | Mullins, SC | 2.5 GWh |
#4163 | Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.5 GWh |
#4164 | Dartmouth Solar | Dartmouth, MA | 2.5 GWh |
#4165 | Acushnet-Braley Road 1 | Freetown, MA | 2.5 GWh |
#4166 | Cenergy - Wiscasset (CSG) | Wiscasset, ME | 2.5 GWh |
#4167 | 46 Meadowlands Parkway | Secaucus, NJ | 2.5 GWh |
#4168 | IGS Solar I - BWI2 | Baltimore, MD | 2.5 GWh |
#4169 | Skalbeck Solar | Sacred Heart, MN | 2.5 GWh |
#4170 | Emmitsburg Solar Arrays | Emmitsburg, MD | 2.5 GWh |
#4172 | Whittier | Ogden, NY | 2.5 GWh |
#4173 | Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh |
#4174 | Open View Solar Farm | New Haven, VT | 2.5 GWh |
#4175 | Bell Bay Solar Farm | Conway, SC | 2.5 GWh |
#4176 | Heliocentric | Palmdale, CA | 2.5 GWh |
#4177 | Spring Hill Road | Barre, MA | 2.5 GWh |
#4178 | RV CSU Power LLC | Fort Collins, CO | 2.5 GWh |
#4179 | Lebanon Solar | Glen Gardner, NJ | 2.5 GWh |
#4180 | Lineage Logistics Solar | University Park, IL | 2.5 GWh |
#4181 | Warren County Solar | Belvidere, NJ | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Windsor Floating Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aidlin Geothermal Power Plant | Middletown, CA | 77.3 GWh | 20.7 mi |
ASTI | Cloverdale, CA | 1.3 GWh | 17.6 mi |
Beringer | Saint Helena, CA | 1.3 GWh | 18.2 mi |
Bodega Avenue Solar LLC | Petaluma, CA | 4.1 GWh | 19.6 mi |
Calistoga Power Plant | Middletown, CA | 467.3 GWh | 17.6 mi |
Cloverdale Solar Center | Cloverdale, CA | 2.3 GWh | 19.4 mi |
Cloverdale Solar I | Cloverdale, CA | 1.6 GWh | 19.5 mi |
Dissigno Healdsburg FPV, LLC | Healdsburg, CA | 5.9 GWh | 4.2 mi |
Geothermal 1 | Middletown, CA | 254.1 GWh | 15.6 mi |
Geothermal 2 | Middletown, CA | 279.8 GWh | 15.5 mi |
Geysers Unit 5-20 | Middletown, CA | 4.4 TWh | 16.9 mi |
Keysight - Santa Rosa | Santa Rosa, CA | 34.4 GWh | 6.9 mi |
Laguna Water Reclamation Facility | Santa Rosa, CA | 14.2 GWh | 12.1 mi |
Lavio Solar | Petaluma, CA | 1.8 GWh | 25.2 mi |
Santa Rosa Junior College Petaluma Solar | Petaluma, CA | 1.8 GWh | 7 mi |
Sonoma California Geothermal | Middletown, CA | 431.5 GWh | 17.6 mi |
Sonoma Central Landfill Phase I | Petaluma, CA | 8.1 GWh | 16.8 mi |
Sonoma Central Landfill Phase II | Petaluma, CA | 6.6 GWh | 16.8 mi |
Stage Gulch Solar | Petaluma, CA | 1.6 GWh | 26.7 mi |
Waste Mangement Redwood LFGTE | Novato, CA | 5.9 GWh | 29.4 mi |