Willmar Municipal East Substation
1214 High Ave NE, Willmar, MN 56209Plant Summary Information
Willmar Municipal East Substation is ranked #62 out of 76 distillate fuel oil power plants in Minnesota in terms of total annual net electricity generation.
Willmar Municipal East Substation is comprised of 3 generators and generated 3.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Willmar Municipal East Substation |
---|---|
Utility Name | Willmar Municipal Utilities |
Location | Kandiyohi County, MN |
Initial Operation Date | June 2000 |
Last Update | Dec 2023 |
Annual Generation | 14.0 MWh |
Annual Consumption | 375 MMBtu |
Ranked #11,735 out of 11,852 Power Plants Nationwide | |
Ranked #1,084 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #726 out of 736 Minnesota Power Plants | |
Ranked #62 out of 76 Minnesota Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Willmar Municipal East Substation
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Willmar Municipal East Substation.
Monthly Net Generation for Willmar Municipal East Substation
Willmar Municipal East Substation Details
Summary Information | |
---|---|
Plant Name | Willmar Municipal East Substation (57034) |
Plant Address | 1214 High Ave NE, Willmar, MN 56209 |
Utility | Willmar Municipal Utilities (20737) |
Latitude, Longitude | 45.1272, -95.025 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | June 2000 |
Annual Generation | 14.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Willmar Municipal Utilities (20737) MN |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator E04 Details Operating June 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E05 Details Operating June 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E06 Details Operating June 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Willmar Municipal East Substation Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1074 | Alliant SBD 8602 Marion Sub | Marion, IA | 14.7 MWh |
#1075 | Danville New Design Plant | Danville, VA | 14.7 MWh |
#1076 | Beloit | Beloit, KS | 114.0 MWh |
#1077 | Coggon | Coggon, IA | 14.0 MWh |
#1078 | Rockford | Rockford, IA | 14.0 MWh |
#1079 | Wakefield | Wakefield, NE | 14.0 MWh |
#1080 | Greenport | Greenport, NY | 14.0 MWh |
#1081 | La Farge | La Farge, WI | 14.0 MWh |
#1082 | St. Joseph Hospital | Yonkers, NY | 14.0 MWh |
#1083 | State Auto Insurance | Milbank, SD | 14.0 MWh |
#1085 | Willmar Municipal SW Substation | Willmar, MN | 14.0 MWh |
#1086 | Cane Island | Intercession City, FL | 4.2 TWh |
#1087 | Russell Downtown | Russell, KS | 78.0 MWh |
#1088 | IXYS - Beverly | Beverly, MA | 23.0 MWh |
#1089 | Alsey | Alsey, IL | 20.1 GWh |
#1090 | Rock Rapids | Rock Rapids, IA | 13.0 MWh |
#1091 | Villisca Municipal Power Plant | Villisca, IA | 13.0 MWh |
#1092 | Lakefield Utilities | Lakefield, MN | 13.0 MWh |
#1093 | Saint Catherine of Siena Medical Center | Smithtown, NY | 13.0 MWh |
#1094 | Ubly | Ubly, MI | 16.7 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Willmar Municipal East Substation.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Wind Generations LLC | Cosmos, MN | 52.4 GWh | 20.3 mi |
Andresen Solar | Clara City, MN | 2.4 GWh | 21.6 mi |
Aster Community Solar Garden, LLC | Raymond, MN | 2.2 GWh | 12.9 mi |
Atwater Solar | Atwater, MN | 8.4 GWh | 12.5 mi |
Canopus Community Solar | Belgrade, MN | 1.9 GWh | 23 mi |
Clara City Solar | Clara City, MN | 1.9 GWh | 20.2 mi |
Danielson Wind Farms LLC | Cosmos, MN | 49.4 GWh | 13.8 mi |
Deneb Community Solar | Belgrade, MN | 1.9 GWh | 21.3 mi |
Geranium Solar, LLC | Raymond, MN | 2.3 GWh | 15 mi |
Rafterville Solar | Atwater, MN | 940.0 MWh | 14.1 mi |
Sagitta Community Solar | Clara City, MN | 1.9 GWh | 21.5 mi |
Spica Community Solar | Lake Lillian, MN | 3.4 GWh | 15.6 mi |
Syncarpha Clara City CSG I (Stamer) | Clara City, MN | 1.9 GWh | 20.1 mi |
Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg, MN | 1.9 GWh | 15.7 mi |
USS Pheasant Solar LLC CSG | Clara City, MN | 2.3 GWh | 17.3 mi |
USS Turkey Solar LLC CSG | Atwater, MN | 2.1 GWh | 13.9 mi |
Vega Community Solar | Glenwood, MN | 8.4 GWh | 19.7 mi |
Westport Community Solar, LLC | Lake Lillian, MN | 2.1 GWh | 14.3 mi |
Willmar | Willmar, MN | 3.3 GWh | 1.4 mi |
Willmar Municipal SW Substation | Willmar, MN | 14.0 MWh | 3.3 mi |