Williams College - Campus CHP
50 Heating Plant Drive, Williamstown, MA 1267Plant Summary Information
Williams College - Campus CHP is ranked #36 out of 41 natural gas power plants in Massachusetts in terms of total annual net electricity generation.
Williams College - Campus CHP is comprised of 3 generators and generated 968.5 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Williams College - Campus CHP |
---|---|
Utility Name | President & Trustees of Williams College |
Location | Berkshire County, MA |
Initial Operation Date | March 2003 |
Last Update | Dec 2022 |
Annual Generation | 3.8 GWh |
Annual Consumption | 133.4 k MMBtu |
Ranked #8,133 out of 11,249 Power Plants Nationwide | |
Ranked #1,744 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #284 out of 573 Massachusetts Power Plants | |
Ranked #36 out of 41 Massachusetts Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.4% Distillate Fuel Oil : 1.6% |
Map of Williams College - Campus CHP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Williams College - Campus CHP.
Monthly Net Generation for Williams College - Campus CHP
Williams College - Campus CHP Details
Summary Information | |
---|---|
Plant Name | Williams College - Campus CHP (58160) |
Plant Address | 50 Heating Plant Drive Williamstown, MA 1267 |
Utility | President & Trustees of Williams College (58109) |
Latitude, Longitude | 42.70972, -73.20222 |
Generation Dates on File | Jan 2012 to Dec 2022 |
Initial Operation Date | March 2003 |
Annual Generation | 3.8 GWh |
Fuel Types | Natural Gas : 98.4% Distillate Fuel Oil : 1.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 15.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | BERKSHIRE GAS COMPANY THE |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN2 Details Operating March 2003
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2003 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 3 MW |
Net Winter Capacity With Natural Gas | 3 MW |
Net Winter Capacity With Oil | 3 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GEN4 Details Operating December 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2017 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating December 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2017 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Williams College - Campus CHP Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1734 | McClellan (CA) | Sacramento, CA | 4.0 GWh |
#1735 | Swift Creek Chemical Complex | White Springs, FL | 98.0 GWh |
#1736 | Overlook Medical Center | Summit, NJ | 4.0 GWh |
#1737 | Sunnyvale City of WPCP | Sunnyvale, CA | 9.2 GWh |
#1738 | Riverside RWQCP Fuel Cell | Riverside, CA | 11.4 GWh |
#1739 | Verizon-Torrance | Torrance, CA | 3.9 GWh |
#1740 | POET Biorefining - Chancellor | Chancellor, SD | 34.5 GWh |
#1741 | Chanute 3 | Chanute, KS | 4.7 GWh |
#1742 | Fort Lupton | Ft. Lupton, CO | 5.0 GWh |
#1743 | Sterling Power Plant | Sherrill, NY | 3.8 GWh |
#1745 | University of Washington Power Plant | Seattle, WA | 3.9 GWh |
#1746 | One Market Plaza | San Francisco, CA | 3.8 GWh |
#1747 | York County Resource Recovery | York, PA | 271.7 GWh |
#1748 | Valencia | Nogales, AZ | 3.6 GWh |
#1749 | Powerton | Pekin, IL | 1.5 TWh |
#1750 | AltaGas Ripon Energy Inc. | Ripon, CA | 3.6 GWh |
#1751 | Henrietta Peaker | Lemoore, CA | 3.6 GWh |
#1752 | Paxton Creek Cogeneration | Harrisburg, PA | 4.2 GWh |
#1753 | Dutchess Cnty Resource Recovery Facility | Poughkeepsie, NY | 31.4 GWh |
#1754 | Morgan Creek | Colorado City, TX | 21.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Williams College - Campus CHP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Battle Creek Solar | Bennington, VT | 3.7 GWh | 14.1 mi |
Berkshire Wind Power Project | Lanesboro, MA | 34.9 GWh | 9.3 mi |
Charlemont A | Charlemont, MA | 4.0 GWh | 16.2 mi |
Deerfield 5 | Florida, MA | 49.7 GWh | 12.6 mi |
Deerfield Wind LLC | Searsburg, VT | 97.8 GWh | 15.7 mi |
East Acres Solar NG, LLC | Pittsfield, MA | 5.7 GWh | 15.5 mi |
Fairhaven E | Fairhaven, MA | 3.6 GWh | 16.2 mi |
Fife Brook | Florida, MA | 28.0 GWh | 11.5 mi |
Harbor Road Solar 1 | Cheshire, MA | 2.9 GWh | 9.1 mi |
Harriman | Whitingham, VT | 91.7 GWh | 15.7 mi |
Jiminy Peak Wind QF | Hancock, MA | 1.2 MWh | 12.4 mi |
New England Wind LLC | Florida, MA | 73.4 GWh | 9.2 mi |
Nexamp Peak CSG | Hancock, MA | 2.3 GWh | 11.1 mi |
North Adams Landfill | North Adams, MA | 3.8 GWh | 6.3 mi |
Pittsfield 44 - M&W PV | Pittsfield, MA | 1.7 GWh | 15.4 mi |
Pittsfield Generating LP | Pittsfield, MA | 22.2 GWh | 17.5 mi |
Savoy Solar PV | Savoy, MA | 3.4 GWh | 12.9 mi |
Searsburg Wind Turbine | Searsburg, VT | 10.6 GWh | 16.1 mi |
Sherman | Rowe, MA | 28.1 GWh | 13.9 mi |
SVEP Solar Project Company | Pownal, VT | 2.3 GWh | 3.3 mi |