774 Wilbur Dam Rd., Elizabethon, TN 37643Plant Summary Information
Wilbur is ranked #28 out of 28 hydroelectric power plants in Tennessee in terms of total annual net electricity generation.
Wilbur is comprised of 4 generators and generated 1.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wilbur |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Carter County, TN |
Initial Operation Date | December 1912 |
Last Update | Dec 2023 |
Annual Generation | 13.4 GWh |
Annual Consumption | 49.0 k MMBtu |
Ranked #5,497 out of 11,835 Power Plants Nationwide | |
Ranked #876 out of 1,371 Water Power Plants Nationwide | |
Ranked #63 out of 84 Tennessee Power Plants | |
Ranked #28 out of 28 Tennessee Water Power Plants | |
Fuel Types | Water |
Map of Wilbur
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wilbur.
Monthly Net Generation for Wilbur
Wilbur Details
Summary Information | |
---|---|
Plant Name | Wilbur (3421) |
Plant Address | 774 Wilbur Dam Rd., Elizabethon, TN 37643 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 36.34167, -82.12639 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1912 |
Annual Generation | 13.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Watauga River |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating December 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating January 1926
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1926 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating July 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7 MW |
Winter Capacity | 7 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Wilbur Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#866 | Turners Falls | Montague, MA | 13.9 GWh |
#867 | Oxbow (CA) | Foresthill, CA | 13.8 GWh |
#868 | Falls Creek | Cascadia, OR | 13.8 GWh |
#869 | Gregg Falls | Goffstown, NH | 13.7 GWh |
#870 | Bishop Creek 5 | Bishop, CA | 13.7 GWh |
#871 | Johnsonville Dam | Johnsonville, NY | 13.6 GWh |
#872 | Norwood | Norwood, NY | 13.6 GWh |
#873 | Middle Falls Hydro | Middle Falls, NY | 13.6 GWh |
#874 | Packaging of America Tomahawk Mill | Tomahawk, WI | 112.9 GWh |
#875 | Stony Gorge | Elk Creek, CA | 13.5 GWh |
#877 | Menominee Mill Marinette | Menominee, MI | 13.3 GWh |
#878 | Hewittville Hydroelectric | Norwood, NY | 13.2 GWh |
#879 | Belfort | Croghan, NY | 13.1 GWh |
#880 | Messalonskee 2 (Oakland) | Oakland, ME | 12.9 GWh |
#881 | Echo Dam | Echo, UT | 12.9 GWh |
#882 | Dillon Hydro Plant | Summit, CO | 12.9 GWh |
#883 | Wallace Dam | Eatonton, GA | 12.9 GWh |
#884 | Goodwin Hydroelectric | W. Hartland, CT | 12.9 GWh |
#885 | Stillwater B | Old Town, ME | 12.8 GWh |
#886 | Siphon Drop Power Plant | Winterhaven, CA | 12.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wilbur.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bernhardt Furniture Solar Farm | Lenoir, NC | 1.7 GWh | 47.1 mi |
Boone Dam | Kingsport, TN | 153.2 GWh | 18.6 mi |
Bridgewater | Morganton, NC | 40.3 GWh | 44.4 mi |
Bristol Plant | Bristol, VA | 2.3 GWh | 18 mi |
Catawba River Pollution Control | Morganton, NC | 4.0 MWh | 46.8 mi |
Clinch River | Cleveland, VA | 181.5 GWh | 41.1 mi |
Domtar Kingsport Mill | Kingsport, TN | 171.8 GWh | 28.4 mi |
Fort Patrick Henry | Kingsport, TN | 94.4 GWh | 23.8 mi |
Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 1.9 GWh | 49.9 mi |
John Sevier | Rogersville, TN | 3.9 TWh | 46.7 mi |
Mountain Home Energy Center | Mountain Home, TN | 4.6 GWh | 14.2 mi |
South Holston | Bristol, TN | 94.6 GWh | 12.7 mi |
SR Greenville I | Limestone, TN | 10.3 GWh | 32 mi |
SR Greenville II | Greeneville, TN | 10.2 GWh | 35.7 mi |
SR Jonesborough | Jonesborough, TN | 7.6 GWh | 22.8 mi |
SR Washington I, LLC | Jonesborough, TN | 20.2 GWh | 26.3 mi |
Tennessee Eastman Operations | Kingsport, TN | 1.1 TWh | 26.3 mi |
Virginia City Hybrid Energy Center | St. Paul, VA | 854.9 GWh | 41.4 mi |
Watauga | Elizabethton, TN | 113.0 GWh | 0 mi |
Wolf Hills Energy | Bristol, VA | 77.1 GWh | 22.3 mi |