Wheeler Ridge
Basic School Road, Bakersfield, CA 93311Plant Summary Information
Wheeler Ridge is ranked #590 out of 799 solar farms in California in terms of total annual net electricity generation.
Wheeler Ridge generated 2.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wheeler Ridge |
---|---|
Utility Name | AFTW Holdings, LLC |
Location | Kern County, CA |
Initial Operation Date | September 2023 |
Last Update | Dec 2023 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.1 k MMBtu |
Ranked #9,492 out of 11,852 Power Plants Nationwide | |
Ranked #4,261 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,319 out of 1,570 California Power Plants | |
Ranked #590 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Wheeler Ridge
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wheeler Ridge.
Monthly Net Generation for Wheeler Ridge
Wheeler Ridge Details
Summary Information | |
---|---|
Plant Name | Wheeler Ridge (66713) |
Plant Address | Basic School Road, Bakersfield, CA 93311 |
Utility | AFTW Holdings, LLC (65718) |
Latitude, Longitude | 35.082, -119.316 |
Generation Dates on File | Oct 2023 to Dec 2023 |
Initial Operation Date | September 2023 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-417-002, 22-417-001, 22-417-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator WHRPV Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Wheeler Ridge Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4251 | Sand Lake DPC Solar | Centuria, WI | 2.4 GWh |
#4252 | MN CSG 2019-38 DE LLC | Cleveland, MN | 2.4 GWh |
#4253 | DeGraff Butler Electric | Burns, KS | 2.4 GWh |
#4254 | Dynamic Energy NJ - Ferrero | Somerset, NJ | 2.4 GWh |
#4255 | Norton Landfill Solar | Norton, MA | 2.4 GWh |
#4256 | Oakley Solar Project | Oakley, CA | 2.4 GWh |
#4257 | 20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh |
#4258 | Villa Roma Rd #1 | Delaware, NY | 2.4 GWh |
#4259 | McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.4 GWh |
#4260 | Oregon University System OIT Klamath Falls | Klamath Falls, OR | 2.4 GWh |
#4262 | SCE-Snowline-Duncan Road (South) | Phelan, CA | 2.4 GWh |
#4263 | ASA Volney NY Solar I LLC | Fulton, NY | 2.4 GWh |
#4264 | Niagara Depot Solar | Niagara Falls, NY | 2.4 GWh |
#4265 | Goya Foods, Inc- Secaucus Solar | Secaucus, NJ | 2.4 GWh |
#4266 | Solar BESS Hybrid | Marietta, GA | 2.3 GWh |
#4267 | Whiskey Hill Solar | Walden, CO | 2.4 GWh |
#4268 | Depot Park Solar System | Sacramento, CA | 2.4 GWh |
#4269 | CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 2.4 GWh |
#4270 | FedEx Woodbridge | Keasbey, NJ | 2.4 GWh |
#4271 | USS Rosebud Solar LLC | Morgan, MN | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wheeler Ridge.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 7.8 GWh | 11.1 mi |
ABEC #4 dba CE&S Dairy | Bakersfield, CA | 8.5 GWh | 12.9 mi |
ABEC Bidart-Old River LLC | Bakersfield, CA | 16.0 GWh | 13.3 mi |
Algonquin SKIC 10 Solar, LLC | Taft, CA | 17.7 GWh | 5.1 mi |
Algonquin SKIC20 Solar LLC | Taft, CA | 45.5 GWh | 5.1 mi |
Berry Cogen | Taft, CA | 16.9 GWh | 7.3 mi |
Berry Cogen Tanne Hills 18 | Maricopa, CA | 137.1 GWh | 7.1 mi |
Castor Solar | Dustin Acres, CA | 917.0 MWh | 9.8 mi |
Cawelo Water District Solar | Famoso, CA | 927.0 MWh | 8 mi |
Chalk Cliff Limited | Bakersfield, CA | 21.7 GWh | 6.5 mi |
Dome Project | Fellows, CA | 48.7 GWh | 17.9 mi |
Eagle Creek | Taft, CA | 7.6 GWh | 10.2 mi |
Elk Hills Power LLC | Tupman, CA | 2.3 TWh | 16.3 mi |
Maricopa West Solar PV, LLC | Taft, CA | 40.6 GWh | 2.3 mi |
RE Old River One, LLC | Bakersfield, CA | 34.7 GWh | 16.1 mi |
SEPV Cuyama Hybrid | New Cuyama, CA | 107.0 MWh | 19.5 mi |
Sunny Cow Solar, LLC | Bakersfield, CA | 847.0 MWh | 15.4 mi |
Sunrise Power LLC | Fellows, CA | 2.6 TWh | 17.6 mi |
Taft 26C Cogen | Taft, CA | 58.4 GWh | 9 mi |
Vulcan San Emidio Solar | Bakersfield, CA | 3.4 GWh | 8 mi |