Wheelabrator Portsmouth
3809 Elm Avenue, Portsmouth, VA 23704Plant Summary Information
Wheelabrator Portsmouth is ranked #4 out of 64 distillate fuel oil power plants in Virginia in terms of total annual net electricity generation.
Wheelabrator Portsmouth is comprised of 3 generators and generated 7.8 GWh during the 3-month period between April 2024 to July 2024.
Plant Name | Wheelabrator Portsmouth |
---|---|
Utility Name | Wheelabrator Environmental Systems |
Location | Portsmouth city, VA |
Initial Operation Date | February 1987 |
Last Update | Jul 2024 |
Annual Generation | 35.6 GWh |
Annual Consumption | 5.8 M MMBtu |
Ranked #4,310 out of 11,835 Power Plants Nationwide | |
Ranked #62 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #97 out of 211 Virginia Power Plants | |
Ranked #4 out of 64 Virginia Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil : 46.5% Non-biogenic Municipal Solid Waste : 29.4% Biogenic Municipal Solid Waste : 24.1% |
Map of Wheelabrator Portsmouth
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wheelabrator Portsmouth.
Monthly Net Generation for Wheelabrator Portsmouth
Wheelabrator Portsmouth Details
Summary Information | |
---|---|
Plant Name | Wheelabrator Portsmouth (54998) |
Plant Address | 3809 Elm Avenue, Portsmouth, VA 23704 |
Utility | Wheelabrator Environmental Systems (20541) |
Latitude, Longitude | 36.8083, -76.3036 |
Generation Dates on File | Jan 2001 to Jul 2024 |
Initial Operation Date | February 1987 |
Annual Generation | 35.6 GWh |
Fuel Types | Distillate Fuel Oil : 46.5% Non-biogenic Municipal Solid Waste : 29.4% Biogenic Municipal Solid Waste : 24.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 01-88-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Water Transportation (483) |
Sector | Commercial CHP (5) |
Water Source | City Of Portsmouth |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1410 Details Operating October 1987
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 15.5 MW |
Winter Capacity | 15.3 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1987 |
Planned Retirement | July 2024 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Municipal Solid Waste |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1430 Details Operating February 1987
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 15.5 MW |
Winter Capacity | 15.3 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1987 |
Planned Retirement | July 2024 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Municipal Solid Waste |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1420 Details Operating March 1987
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 15.5 MW |
Winter Capacity | 15.3 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1987 |
Planned Retirement | July 2024 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Municipal Solid Waste |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Wheelabrator Portsmouth Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#52 | Westward Seafoods | Dutch Harbor, AK | 18.8 GWh |
#53 | Dillingham | Dillingham, AK | 18.7 GWh |
#54 | Richard M Flynn | Holtsville, NY | 429.5 GWh |
#55 | McManus | Brunswick, GA | 18.1 GWh |
#56 | Wheaton | Eau Claire, WI | 30.9 GWh |
#57 | W H Sammis | Stratton, OH | 3.1 TWh |
#58 | Rockingham County CT Station | Reidsville, NC | 1.3 TWh |
#59 | Rowan | Salisbury, NC | 4.2 TWh |
#60 | Kleen Energy Systems Project | Middletown, CT | 2.7 TWh |
#61 | J H Campbell | West Olive, MI | 7.2 TWh |
#63 | Bowen | Cartersville, GA | 11.0 TWh |
#64 | Sooner | Red Rock, OK | 1.3 TWh |
#65 | Fruita | Grand Junction, CO | 33.9 GWh |
#66 | Wateree | Eastover, SC | 2.1 TWh |
#67 | Jeffrey Energy Center | St. Mary's, KS | 5.4 TWh |
#68 | Darbytown | Richmond, VA | 143.5 GWh |
#69 | Intercession City | Intercession City, FL | 295.1 GWh |
#70 | R W Miller | Palo Pinto, TX | 472.8 GWh |
#71 | Mountaineer | New Haven, WV | 6.1 TWh |
#72 | Croydon CT Generating Station | Bristol Twp., PA | 15.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wheelabrator Portsmouth.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bedford Solar | Chesapeake, VA | 108.4 GWh | 10.7 mi |
Caden Energix Hickory LLC | Chesapeake, VA | 58.5 GWh | 14.1 mi |
Chesapeake | Chesapeake, VA | 178.0 MWh | 2.6 mi |
Chesapeake Solar Project | Chesapeake, VA | 162.6 GWh | 8.5 mi |
Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh | 2.3 mi |
Grassfield Solar | Chesapeake, VA | 41.0 GWh | 11.2 mi |
IKEA Norfolk Rooftop PV System | Norfolk, VA | 1.5 GWh | 7.4 mi |
Morgan's Corner | Elizabeth City, NC | 28.3 GWh | 27 mi |
Oak Trail Solar, LLC | Moyock, NC | 242.4 GWh | 21.9 mi |
Oceana Solar | Virginia Beach, VA | 29.0 GWh | 14 mi |
Pleasant Hill Solar | Suffolk, VA | 20.7 GWh | 17.2 mi |
Ranchland Solar, LLC | Moyock, NC | 118.4 GWh | 24.6 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 23.2 mi |
Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh | 17.5 mi |
Summit Farms Solar | Moyock, NC | 80.6 GWh | 24.7 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 20.3 mi |
Virginia Beach | Virginia Beach, VA | 4.2 GWh | 5.8 mi |
Waste Management Bethel LFGTE | Hampton, VA | 37.4 GWh | 20.1 mi |
Western Branch High School | Chesapeake, VA | 1.1 GWh | 6.4 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 17.9 mi |