West Valley High School Solar
3401 Mustang Way, Hemet, CA 92545Plant Summary Information
West Valley High School Solar is ranked #720 out of 799 solar farms in California in terms of total annual net electricity generation.
West Valley High School Solar generated 274.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | West Valley High School Solar |
---|---|
Utility Name | AES Distributed Energy |
Location | Riverside County, CA |
Initial Operation Date | September 2012 |
Last Update | Dec 2023 |
Annual Generation | 1.4 GWh |
Annual Consumption | 4.9 k MMBtu |
Ranked #10,573 out of 11,835 Power Plants Nationwide | |
Ranked #5,222 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,461 out of 1,569 California Power Plants | |
Ranked #720 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
sPower (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2023) |
Map of West Valley High School Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Valley High School Solar.
Monthly Net Generation for West Valley High School Solar
West Valley High School Solar Details
Summary Information | |
---|---|
Plant Name | West Valley High School Solar (58244) |
Plant Address | 3401 Mustang Way, Hemet, CA 92545 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 33.71972, -117.00972 |
Generation Dates on File | Sep 2012 to Dec 2023 |
Initial Operation Date | September 2012 |
Annual Generation | 1.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator WEST Details Operating September 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 90 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1 MW |
Virtual Net Metering Agreement | No |
West Valley High School Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5212 | Malone Solar Site | Malone, NY | 1.4 GWh |
#5213 | IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh |
#5214 | Renewable Energy Center at BJH | St Louis, MO | 1.4 GWh |
#5215 | Manchester Community College East | Manchester, CT | 1.4 GWh |
#5216 | Kearsarge Upper Union | Franklin, MA | 1.3 GWh |
#5217 | AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 1.4 GWh |
#5218 | Holliston Solar CSG | Holliston, MA | 1.4 GWh |
#5219 | Port Reading 8 Solar | Carteret, NJ | 1.4 GWh |
#5220 | IKEA Miami 327 | Miami, FL | 1.4 GWh |
#5221 | Greenville | Greenville, GA | 1.4 GWh |
#5223 | Pleasantdale Road Community Solar | Rutland, MA | 1.4 GWh |
#5224 | FastSun 18 CSG | La Crescent, MN | 1.4 GWh |
#5225 | Arrache 4013 | Palmdale, CA | 1.4 GWh |
#5226 | Ledeaux Solar, LLC CSG | North Brookfield, MA | 1.4 GWh |
#5227 | E-Volve Energy Holdings LLC | Sealy, TX | 1.4 GWh |
#5228 | Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh |
#5229 | GSPP Onyx New Brunswick LLC | New Brunswick, NJ | 1.4 GWh |
#5230 | MEVS DOT 109 | Augusta, ME | 1.4 GWh |
#5231 | Hartmann Project CSG | Saint Cloud, MN | 1.4 GWh |
#5232 | Novel Jewison Solar CSG | Janesville, MN | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Valley High School Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon PSP1 | Beaumont, CA | 7.5 GWh | 14.3 mi |
AP North Lake I, LP | Hemet, CA | 27.6 GWh | 1.4 mi |
Cabazon Wind Partners | Cabazon, CA | 118.0 GWh | 20.9 mi |
Diamond Valley Lake | Winchester, CA | 2.9 GWh | 4.4 mi |
Diamond Valley Solar Project | Winchester, CA | 2.3 GWh | 3.6 mi |
EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.3 GWh | 15.6 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.0 GWh | 10.6 mi |
EMWD - San Jacinto RES BCT | San Jacinto, CA | 3.2 GWh | 5.8 mi |
EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 9.5 GWh | 5.5 mi |
EMWD - Sun City RWRF | Menifee, CA | 3.6 GWh | 12.1 mi |
Foundation NWNA | Cabazon, CA | 23.0 GWh | 20.1 mi |
Foundation RRM | Cabazon, CA | 9.6 GWh | 17.6 mi |
Green Power I | North Palm Springs, CA | 318.0 MWh | 21 mi |
Lake Elsinore Canopies - Lakeside HS | Lake Elsinore, CA | 2.0 GWh | 21.8 mi |
Park Meridian #1 | Riverside, CA | 2.4 GWh | 19.9 mi |
Perris | Perris, CA | 5.2 GWh | 12.8 mi |
RCWD PV Project | Murrieta, CA | 8.2 GWh | 16.8 mi |
Soboba Community Solar Project | San Jacinto, CA | 3.3 GWh | 6.8 mi |
SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 1.3 GWh | 16.2 mi |
Tahquitz High School | Hemet, CA | 1.6 GWh | 3.3 mi |