West Group Data Center
610 Opperman Dr, Eagan, MN 55123Plant Summary Information
West Group Data Center is ranked #29 out of 76 distillate fuel oil power plants in Minnesota in terms of total annual net electricity generation.
West Group Data Center is comprised of 4 generators and generated 27.0 MWh during the 3-month period between June 2024 to September 2024.
Plant Name | West Group Data Center |
---|---|
Utility Name | Thomson Corp |
Location | Dakota County, MN |
Initial Operation Date | May 2005 |
Last Update | Sep 2024 |
Annual Generation | 72.0 MWh |
Annual Consumption | 818 MMBtu |
Ranked #11,494 out of 11,852 Power Plants Nationwide | |
Ranked #819 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #699 out of 736 Minnesota Power Plants | |
Ranked #29 out of 76 Minnesota Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of West Group Data Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Group Data Center.
Monthly Net Generation for West Group Data Center
West Group Data Center Details
Summary Information | |
---|---|
Plant Name | West Group Data Center (54294) |
Plant Address | 610 Opperman Dr, Eagan, MN 55123 |
Utility | Thomson Corp (18981) |
Latitude, Longitude | 44.8256, -93.1139 |
Generation Dates on File | Jan 2002 to Sep 2024 |
Initial Operation Date | May 2005 |
Annual Generation | 72.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services (518) |
Sector | Commercial Non-CHP (4) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Dakota Electric Association (25177) MN |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Standby May 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Standby May 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Standby May 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Standby May 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
West Group Data Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#809 | Malden | Malden, MO | 75.0 MWh |
#810 | Woodville RTO BTM | Woodville, OH | 75.0 MWh |
#811 | Ephrata PA BTM | Lancaster, PA | 75.0 MWh |
#812 | Midulla Generating Station | Bowling Green, FL | 2.1 TWh |
#813 | BYUI Central Energy Facility | Rexburg, ID | 39.4 GWh |
#814 | Algonquin Windsor Locks | Windsor Locks, CT | 128.9 GWh |
#815 | IMEA Flora | Flora, IL | 73.0 MWh |
#816 | Southwark | Philadelphia, PA | 73.0 MWh |
#817 | St Marys | St. Marys, OH | 73.0 MWh |
#818 | Vitro Architectural Glass (PA) | Carlisle, PA | 72.5 MWh |
#820 | Chappell | Chappell, NE | 72.0 MWh |
#821 | Beaver Island | Beaver Island, MI | 71.0 MWh |
#822 | Winterset | Winterset, IA | 115.0 MWh |
#823 | NCAH Central Utility Plant | Ames, IA | 14.7 GWh |
#824 | Benson City of | Benson, MN | 69.0 MWh |
#825 | Waterloo Lundquist | Waterloo, IA | 69.0 MWh |
#826 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#827 | Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh |
#828 | Luverne | Luverne, MN | 68.0 MWh |
#829 | Osceola Generating Station (FL) | St. Cloud, FL | 676.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Group Data Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Dog | Burnsville, MN | 1.8 TWh | 6.8 mi |
Crane Garden | Lester Prairie, MN | 193.0 MWh | 7 mi |
Eolos Wind Energy Research Field Station | Rosemount, MN | 2.3 GWh | 7.5 mi |
Equuleus Community Solar Gardens | Rosemount, MN | 8.2 GWh | 8.2 mi |
High Bridge | St. Paul, MN | 3.2 TWh | 7.3 mi |
Inver Hills | Inver Grove Heights, MN | 78.2 GWh | 4.7 mi |
LSP-Cottage Grove LP | Cottage Grove, MN | 1.0 TWh | 10.1 mi |
MNDOT Standby Generation | St. Paul, MN | 30.0 MWh | 8.8 mi |
MSC-Empire01, LLC | Farmington, MN | 235.8 MWh | 10.5 mi |
MSC-GreyCloud01 Community Solar | St. Paul Park, MN | 1.8 GWh | 6 mi |
Rosemount Community Solar | Rosemount, MN | 8.1 GWh | 8.4 mi |
St Paul Cogeneration | St. Paul, MN | 153.1 GWh | 8.1 mi |
St. Paul Intl Airport Red & Blue Parking | St. Paul, MN | 3.0 GWh | 6 mi |
STAG St. Paul Project CSG | Saint Paul, MN | 1.3 GWh | 6 mi |
Thomson Reuters Campus Bldg A-D | Eagan, MN | 99.0 MWh | 0.4 mi |
Thomson Reuters Data Center Bldg ES101 | Eagan, MN | 9.0 MWh | 0.1 mi |
Thomson Reuters Data Center Bldg H | Eagan, MN | 52.0 MWh | 0.3 mi |
Twin Cities Hydro LLC | St. Paul, MN | 71.6 GWh | 7.5 mi |
West Group Data Center F | Eagan, MN | 57.0 MWh | 0.2 mi |
Woodbury Solar | Woodbury, MN | 4.2 GWh | 8.2 mi |