West County Energy Center
20505 State Rd 80, Loxahatchee, FL 33470Plant Summary Information
West County Energy Center is ranked #7 out of 11,835 power plants nationwide in terms of total annual net electricity generation.
West County Energy Center is comprised of 12 generators and generated 6.3 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | West County Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Palm Beach County, FL |
Initial Operation Date | August 2009 |
Last Update | Aug 2024 |
Annual Generation | 21.1 TWh |
Annual Consumption | 163.4 M MMBtu |
Ranked #7 out of 11,835 Power Plants Nationwide | |
Ranked #1 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #2 out of 279 Florida Power Plants | |
Ranked #1 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of West County Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West County Energy Center.
Monthly Net Generation for West County Energy Center
West County Energy Center Details
Summary Information | |
---|---|
Plant Name | West County Energy Center (56407) |
Plant Address | 20505 State Rd 80, Loxahatchee, FL 33470 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 26.6986, -80.3747 |
Generation Dates on File | Jul 2009 to Aug 2024 |
Initial Operation Date | August 2009 |
Annual Generation | 21.1 TWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Village of Wellington, Wells |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator 2A Details Operating November 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.7 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2B Details Operating November 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.7 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2C Details Operating November 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.7 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2ST Details Operating November 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | WC2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 527 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 485.9 MW |
Winter Capacity | 482.2 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 423 MW |
Net Winter Capacity With Natural Gas | 482.2 MW |
Net Summer Capacity With Oil | 290 MW |
Net Winter Capacity With Oil | 268 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1A Details Operating August 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1B Details Operating August 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1C Details Operating August 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1ST Details Operating August 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | WC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 527 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 486.2 MW |
Winter Capacity | 482.2 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 423 MW |
Net Winter Capacity With Natural Gas | 482.2 MW |
Net Summer Capacity With Oil | 290 MW |
Net Winter Capacity With Oil | 268 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3A Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3B Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 244 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3C Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | WC3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 298 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 257.6 MW |
Winter Capacity | 295.6 MW |
Minimum Load | 232 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 243 MW |
Net Winter Capacity With Natural Gas | 243 MW |
Net Summer Capacity With Oil | 202 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3ST Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | WC3 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 527 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 486.2 MW |
Winter Capacity | 482.2 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 423 MW |
Net Winter Capacity With Natural Gas | 486.8 MW |
Net Summer Capacity With Oil | 290 MW |
Net Winter Capacity With Oil | 268 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
West County Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2 | Jack McDonough | Smyrna, GA | 18.3 TWh |
#3 | Crystal River | Crystal River, FL | 16.5 TWh |
#4 | H Allen Franklin Combined Cycle | Smiths, AL | 12.3 TWh |
#5 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#6 | Barry | Bucks, AL | 12.4 TWh |
#7 | Union Power Station | El Dorado, AR | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.5 TWh |
#9 | Hines Energy Complex | Bartow, FL | 11.3 TWh |
#10 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West County Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluefield Preserve Solar | Okeechobee, FL | 149.4 GWh | 41.8 mi |
Clewiston Sugar House | Clewiston, FL | 272.6 GWh | 34.8 mi |
CSL Gas Recovery | Pompano Beach, FL | 40.0 GWh | 31.2 mi |
Hibiscus Solar Energy Center | Westlake, FL | 146.0 GWh | 6 mi |
Lakeside Solar Center | Okeechobee, FL | 137.2 GWh | 42.3 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 134.8 GWh | 38.6 mi |
Martin | Indiantown, FL | 7.2 TWh | 27.1 mi |
Monarch | TBD, FL | 99.3 GWh | 24.7 mi |
Okeelanta Cogeneration | South Bay, FL | 40.4 GWh | 24.5 mi |
Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 318.5 GWh | 15.2 mi |
Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 528.8 GWh | 15.2 mi |
Pineapple | Port St Lucie, FL | 111.5 GWh | 40.3 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.4 GWh | 42.7 mi |
Riviera | Riviera Beach, FL | 7.6 TWh | 20.4 mi |
Sabal Palm Solar Center | Loxahatchee, FL | 153.7 GWh | 6 mi |
Silver Palm | TBD, FL | 113.2 GWh | 6.3 mi |
Sundew | Port St Lucie, FL | 147.8 GWh | 40.5 mi |
Sweetbay Solar Center | North of Indiantown, FL | 116.6 GWh | 25.7 mi |
Tom G Smith | Lake Worth, FL | 444.0 MWh | 19.9 mi |
White Tail | TBD, FL | 121.1 GWh | 26.2 mi |