West Campus Cogeneration Facility is ranked #15 out of 198 power plants in Wisconsin in terms of total annual net electricity generation.

West Campus Cogeneration Facility is comprised of 3 generators and generated 127.8 GWh during the 3-month period between September 2022 to December 2022.

Plant NameWest Campus Cogeneration Facility
Utility NameMadison Gas & Electric Co
LocationDane County, WI
Initial Operation DateApril 2005
Last Update Dec 2022
Annual Generation 443.0 GWh
Annual Consumption 4.9 M MMBtu
Ranked #1,471 out of 11,249 Power Plants Nationwide
Ranked #577 out of 2,188 Natural Gas Power Plants Nationwide
Ranked #15 out of 198 Wisconsin Power Plants
Ranked #8 out of 45 Wisconsin Natural Gas Power Plants
Fuel Types Natural Gas : 99.7%

Map of West Campus Cogeneration Facility

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Campus Cogeneration Facility.

Create Your Account Today

Monthly Net Generation for West Campus Cogeneration Facility

West Campus Cogeneration Facility Details

Summary Information
Plant NameWest Campus Cogeneration Facility (7991)
Plant Address515 Walnut Street Madison, WI 53701
UtilityMadison Gas & Electric Co (11479)
Latitude, Longitude43.07507, -89.4251
Generation Dates on FileApr 2005 to Dec 2022
Initial Operation DateApril 2005
Annual Generation 443.0 GWh
Fuel Types Natural Gas : 99.7%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceLake Mendota
Ash Impoundment No
Transmission / Distribution OwnerAmerican Transmission Co (659)
Grid Voltage 69.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)MADISON GAS ELEC CO
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator 1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity30.9 MW
Winter Capacity30.9 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas30.9 MW
Net Winter Capacity With Natural Gas30.9 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator CT2 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity32.6 MW
Winter Capacity32.6 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas32.6 MW
Net Winter Capacity With Natural Gas32.6 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator STG1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipJointly Owned
Duct BurnersYes
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity61.3 MW
Nameplate Power Factor0.9
Summer Capacity66.1 MW
Winter Capacity66.1 MW
Minimum Load11 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas66.1 MW
Net Winter Capacity With Natural Gas66.1 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

West Campus Cogeneration Facility Plant Owners

Owner NameAddressGeneratorOwnership
Madison Gas & Electric Co133 South Blair Street, Madison, WI 53701Generator STG175.00%
University of Wisconsin1217 University Ave., Madison, WI 53706Generator STG125.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#567Nikiski Combined CycleNikiski, AK473.1 GWh
#568Bethpage Power PlantHicksville, NY472.2 GWh
#569R W MillerPalo Pinto, TX486.2 GWh
#570Cheyenne Prairie Generating StationCheyenne, WY467.0 GWh
#571NAFTA Region Olefins Complex Cogen FacPort Arthur, TX458.1 GWh
#572Sewell Creek EnergyCedartown, GA455.2 GWh
#573AuroraAurora, IL452.9 GWh
#574Coolidge Generation StationCoolidge, AZ452.6 GWh
#575Cherokee County CogenGaffney, SC450.0 GWh
#576HO Clarke GeneratingHouston, TX444.7 GWh
#578Fort ChurchillYerington, NV440.9 GWh
#579BluffviewFarmington, NM436.9 GWh
#580Blue Spruce Energy CenterAurora, CO444.2 GWh
#581Androscoggin Energy CenterJay, ME434.5 GWh
#582BeatriceBeatrice, NE427.6 GWh
#583Humboldt BayEureka, CA428.6 GWh
#584Walnut Creek Energy ParkIndustry, CA420.8 GWh
#585Sheboygan FallsSheboygan, WI416.8 GWh
#586Washington County Power LLCSandersville, GA416.3 GWh
#587Oleander Power Project LPCocoa, FL415.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding West Campus Cogeneration Facility.

Plant NamePlant LocationAnnual GenerationDistance
Albany Solar (WI)Broadhead, WI13.8 GWh28.4 mi
Ameresco JanesvilleJanesville, WI8.1 GWh32.6 mi
ArgyleArgyle, WI26.8 MWh34.2 mi
Blount StreetMadison, WI21.5 GWh2.6 mi
Columbia (WI)Pardeville, WI5.0 TWh28.4 mi
Crawfish RiverJefferson, WI16.5 GWh28.2 mi
Dane County Airport SolarMadison, WI17.3 GWh7.6 mi
Deertrack Park Gas RecoveryWatertown, WI36.5 GWh34.6 mi
Diesel GeneratorsMadison, WI572.0 MWh2.6 mi
Epic VeronaVerona, WI2.6 GWh9 mi
Galactic WindWaunakee, WI26.2 GWh5 mi
Hermsdorf SolarMadison, WI12.8 GWh8.4 mi
Jefferson Solar ParkJefferson, WI1.1 GWh31.9 mi
Middleton Airport SolarMiddleton, WI8.0 GWh6.1 mi
Middleton Biogas Solar, LLCMiddleton, WI2.1 GWh7 mi
Nine SpringsMadison, WI37.0 MWh4.2 mi
North RockEdgerton, WI103.0 GWh24.5 mi
O'Brien Solar FieldsFitchburg, WI39.0 GWh5.6 mi
Prairie Du SacPrairie du Sac, WI149.6 GWh22.3 mi
RockGen Energy CenterCambridge, WI516.1 GWh20.2 mi