West Campus Cogeneration Facility

515 Walnut Street, Madison, WI 53701

Plant Summary Information

West Campus Cogeneration Facility is ranked #19 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.

West Campus Cogeneration Facility is comprised of 3 generators and generated 48.0 GWh during the 3-month period between September 2023 to December 2023.

Plant NameWest Campus Cogeneration Facility
Utility NameMadison Gas & Electric Co
LocationDane County, WI
Initial Operation DateApril 2005
Last Update Dec 2023
Annual Generation 353.0 GWh
Annual Consumption 4.4 M MMBtu
Ranked #1,643 out of 11,835 Power Plants Nationwide
Ranked #617 out of 2,253 Natural Gas Power Plants Nationwide
Ranked #19 out of 216 Wisconsin Power Plants
Ranked #11 out of 50 Wisconsin Natural Gas Power Plants
Fuel Types Natural Gas

Map of West Campus Cogeneration Facility

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Campus Cogeneration Facility.

Create Your Account Today

Monthly Net Generation for West Campus Cogeneration Facility

West Campus Cogeneration Facility Details

Summary Information
Plant NameWest Campus Cogeneration Facility (7991)
Plant Address515 Walnut Street, Madison, WI 53701
UtilityMadison Gas & Electric Co (11479)
Latitude, Longitude43.07507, -89.4251
Generation Dates on FileApr 2005 to Dec 2023
Initial Operation DateApril 2005
Annual Generation 353.0 GWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceLake Mendota
Ash Impoundment No
Transmission / Distribution OwnerAmerican Transmission Co (659)
Grid Voltage 69.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)MADISON GAS ELEC CO
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator 1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity30 MW
Winter Capacity39 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas30 MW
Net Winter Capacity With Natural Gas39 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator CT2 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity31.5 MW
Winter Capacity40.5 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas31.5 MW
Net Winter Capacity With Natural Gas40.5 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator STG1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipJointly Owned
Duct BurnersYes
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity61.3 MW
Nameplate Power Factor0.9
Summer Capacity65.4 MW
Winter Capacity48.2 MW
Minimum Load11 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas65.4 MW
Net Winter Capacity With Natural Gas48.2 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

West Campus Cogeneration Facility Plant Owners

Owner NameAddressGeneratorOwnership
Madison Gas & Electric Co133 South Blair Street, Madison, WI 53701Generator STG175.00%
University of Wisconsin1217 University Ave., Madison, WI 53706Generator STG125.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#607Combined Locks Energy CenterCombined Locks, WI376.3 GWh
#608Valley (WI)Milwaukee, WI375.0 GWh
#609International Paper Riverdale MillSelma, AL462.7 GWh
#610Formosa PlasticsBaton Rouge, LA369.6 GWh
#611GadsbySalt Lake City, UT366.2 GWh
#612Humboldt BayEureka, CA367.5 GWh
#613Kimberly Clark Mobile - CHP PlantMobile, AL365.5 GWh
#614Dighton Power PlantDighton, MA358.4 GWh
#615RemingtonRemington, VA365.5 GWh
#616Hal C Weaver Power PlantAustin, TX354.4 GWh
#618Braes Bayou PlantRichmond, TX352.1 GWh
#619THUMSLong Beach, CA342.8 GWh
#620Permian BasinMonahans, TX344.7 GWh
#621Selkirk CogenSelkirk, NY339.2 GWh
#622Georgia-Pacific MuskogeeMuskogee, OK373.6 GWh
#623Medical Area Total Energy PlantBoston, MA338.6 GWh
#624Walnut Creek Energy ParkIndustry, CA336.7 GWh
#625Trinidad (TX)Trinidad, TX330.6 GWh
#626Redding PowerRedding, CA329.7 GWh
#627Buchanan Generation LLCKeen Mountain, VA329.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding West Campus Cogeneration Facility.

Plant NamePlant LocationAnnual GenerationDistance
Albany Solar (WI)Broadhead, WI59.9 GWh28.4 mi
Blount StreetMadison, WI9.6 GWh2.6 mi
Columbia (WI)Pardeville, WI4.2 TWh28.4 mi
Crawfish RiverJefferson, WI68.5 GWh28.2 mi
Dane County Airport SolarMadison, WI18.1 GWh7.6 mi
Dane County Solar LLCCottage Grove, WI14.7 GWh9.6 mi
Diesel GeneratorsMadison, WI551.0 MWh2.6 mi
Epic VeronaVerona, WI2.4 GWh9 mi
FitchburgMadison, WI17.0 MWh4.5 mi
Galactic WindWaunakee, WI20.3 GWh5 mi
Hermsdorf SolarMadison, WI15.4 GWh8.4 mi
Jones DairyFort Atkinson, WI3.2 GWh31.1 mi
Middleton Airport SolarMiddleton, WI7.7 GWh6.1 mi
Middleton Biogas Solar, LLCMiddleton, WI3.3 GWh7 mi
Nine SpringsMadison, WI65.0 MWh4.2 mi
North RockEdgerton, WI93.9 GWh24.5 mi
O'Brien Solar FieldsFitchburg, WI37.4 GWh5.6 mi
Prairie Du SacPrairie du Sac, WI131.0 GWh22.3 mi
RockGen Energy CenterCambridge, WI329.3 GWh20.2 mi
Sycamore (WI)Madison, WI229.0 MWh6.3 mi