West Campus Cogeneration Facility
515 Walnut Street, Madison, WI 53701Plant Summary Information
West Campus Cogeneration Facility is ranked #19 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.
West Campus Cogeneration Facility is comprised of 3 generators and generated 48.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | West Campus Cogeneration Facility |
---|---|
Utility Name | Madison Gas & Electric Co |
Location | Dane County, WI |
Initial Operation Date | April 2005 |
Last Update | Dec 2023 |
Annual Generation | 353.0 GWh |
Annual Consumption | 4.4 M MMBtu |
Ranked #1,640 out of 11,852 Power Plants Nationwide | |
Ranked #616 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #19 out of 216 Wisconsin Power Plants | |
Ranked #11 out of 50 Wisconsin Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of West Campus Cogeneration Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Campus Cogeneration Facility.
Monthly Net Generation for West Campus Cogeneration Facility
West Campus Cogeneration Facility Details
Summary Information | |
---|---|
Plant Name | West Campus Cogeneration Facility (7991) |
Plant Address | 515 Walnut Street, Madison, WI 53701 |
Utility | Madison Gas & Electric Co (11479) |
Latitude, Longitude | 43.07507, -89.4251 |
Generation Dates on File | Apr 2005 to Dec 2023 |
Initial Operation Date | April 2005 |
Annual Generation | 353.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Mendota |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | MADISON GAS ELEC CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | MGE.CC.WCCF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MGE.CC.WCCF |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 30 MW |
Winter Capacity | 39 MW |
Minimum Load | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 30 MW |
Net Winter Capacity With Natural Gas | 39 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator CT2 Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | MGE.CC.WCCF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MGE.CC.WCCF |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31.5 MW |
Winter Capacity | 40.5 MW |
Minimum Load | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 31.5 MW |
Net Winter Capacity With Natural Gas | 40.5 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator STG1 Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | Yes |
RTO ISO LMP Node Designation | MGE.CC.WCCF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MGE.CC.WCCF |
Nameplate Capacity | 61.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 65.4 MW |
Winter Capacity | 48.2 MW |
Minimum Load | 11 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 65.4 MW |
Net Winter Capacity With Natural Gas | 48.2 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
West Campus Cogeneration Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Madison Gas & Electric Co | 133 South Blair Street, Madison, WI 53701 | Generator STG1 | 75.00% |
University of Wisconsin | 1217 University Ave., Madison, WI 53706 | Generator STG1 | 25.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#606 | Combined Locks Energy Center | Combined Locks, WI | 376.3 GWh |
#607 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#608 | Aurora | Aurora, IL | 369.7 GWh |
#609 | Formosa Plastics | Baton Rouge, LA | 369.6 GWh |
#610 | Kimberly Clark Mobile - CHP Plant | Mobile, AL | 365.5 GWh |
#611 | Gadsby | Salt Lake City, UT | 361.7 GWh |
#612 | Humboldt Bay | Eureka, CA | 363.4 GWh |
#613 | Dighton Power Plant | Dighton, MA | 358.4 GWh |
#614 | Remington | Remington, VA | 365.5 GWh |
#615 | Hal C Weaver Power Plant | Austin, TX | 354.4 GWh |
#617 | Sycamore Cogeneration | Bakersfield, CA | 351.7 GWh |
#618 | RockGen Energy Center | Cambridge, WI | 352.3 GWh |
#619 | Braes Bayou Plant | Richmond, TX | 348.4 GWh |
#620 | THUMS | Long Beach, CA | 346.3 GWh |
#621 | Permian Basin | Monahans, TX | 344.7 GWh |
#622 | Selkirk Cogen | Selkirk, NY | 339.2 GWh |
#623 | Georgia-Pacific Muskogee | Muskogee, OK | 374.1 GWh |
#624 | Medical Area Total Energy Plant | Boston, MA | 338.6 GWh |
#625 | Walnut Creek Energy Park | Industry, CA | 336.7 GWh |
#626 | Malburg | Vernon, CA | 333.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Campus Cogeneration Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albany Solar (WI) | Broadhead, WI | 69.7 GWh | 28.4 mi |
Blount Street | Madison, WI | 9.6 GWh | 2.6 mi |
Columbia (WI) | Pardeville, WI | 4.2 TWh | 28.4 mi |
Crawfish River | Jefferson, WI | 80.6 GWh | 28.2 mi |
Dane County Airport Solar | Madison, WI | 18.1 GWh | 7.6 mi |
Dane County Solar LLC | Cottage Grove, WI | 14.7 GWh | 9.6 mi |
Diesel Generators | Madison, WI | 564.0 MWh | 2.6 mi |
Epic Verona | Verona, WI | 2.4 GWh | 9 mi |
Fitchburg | Madison, WI | 17.0 MWh | 4.5 mi |
Galactic Wind | Waunakee, WI | 20.3 GWh | 5 mi |
Hermsdorf Solar | Madison, WI | 15.4 GWh | 8.4 mi |
Jones Dairy | Fort Atkinson, WI | 3.2 GWh | 31.1 mi |
Middleton Airport Solar | Middleton, WI | 7.7 GWh | 6.1 mi |
Middleton Biogas Solar, LLC | Middleton, WI | 3.3 GWh | 7 mi |
Nine Springs | Madison, WI | 65.0 MWh | 4.2 mi |
North Rock | Edgerton, WI | 95.7 GWh | 24.5 mi |
O'Brien Solar Fields | Fitchburg, WI | 37.4 GWh | 5.6 mi |
Prairie Du Sac | Prairie du Sac, WI | 131.0 GWh | 22.3 mi |
RockGen Energy Center | Cambridge, WI | 352.3 GWh | 20.2 mi |
Sycamore (WI) | Madison, WI | 229.0 MWh | 6.3 mi |