Wells
28905 Highway 97, Pateros, WA 98846Plant Summary Information
Wells is ranked #12 out of 1,369 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Wells is comprised of 10 generators and generated 762.4 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Wells |
---|---|
Utility Name | PUD No 1 of Douglas County |
Location | Douglas County, WA |
Initial Operation Date | September 1967 |
Last Update | Oct 2024 |
Annual Generation | 3.4 TWh |
Annual Consumption | 12.4 M MMBtu |
Ranked #340 out of 11,866 Power Plants Nationwide | |
Ranked #12 out of 1,369 Water Power Plants Nationwide | |
Ranked #7 out of 134 Washington Power Plants | |
Ranked #6 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Wells
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wells.
Monthly Net Generation for Wells
Wells Details
Summary Information | |
---|---|
Plant Name | Wells (3886) |
Plant Address | 28905 Highway 97, Pateros, WA 98846 |
Utility | PUD No 1 of Douglas County (5326) |
Latitude, Longitude | 47.9469, -119.8653 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | September 1967 |
Annual Generation | 3.4 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | PUD No. 1 of Douglas County (DOPD) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Douglas County (5326) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator U-2 Details Operating October 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-1 Details Operating September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-3 Details Operating September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-4 Details Operating September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-5 Details Operating September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-6 Details OA September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | September 1967 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 5.6 MW |
Planned Net Winter Capacity Uprate | 5.6 MW |
Planned Uprate | August 2024 |
Multiple Fuels | No |
Generator U-7 Details Operating September 1967
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-8 Details Operating October 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1968 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 5.6 MW |
Planned Net Winter Capacity Uprate | 5.6 MW |
Planned Uprate | October 2025 |
Multiple Fuels | No |
Generator U-10 Details Operating January 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 89.6 MW |
Winter Capacity | 89.6 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator U-9 Details Operating January 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 77.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1969 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 5.6 MW |
Planned Net Winter Capacity Uprate | 5.6 MW |
Planned Uprate | January 2027 |
Multiple Fuels | No |
Wells Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2 | Grand Coulee | Grand Coulee, WA | 15.1 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.4 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#13 | Boundary | Metaline, WA | 3.0 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.7 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.3 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Rock Island | Wenatchee, WA | 2.0 TWh |
#22 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wells.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 74.6 mi |
Chelan | Wenatchee, WA | 305.8 GWh | 10.3 mi |
Chief Joseph | Bridgeport, WA | 9.0 TWh | 10.9 mi |
Diablo | Rockport, WA | 548.9 GWh | 78.7 mi |
Gorge | Rockport, WA | 685.4 GWh | 80.6 mi |
Grand Coulee | Grand Coulee, WA | 15.1 TWh | 41.1 mi |
Main Canal Headworks | Coulee City, WA | 118.7 GWh | 34.8 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 54.4 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 74.6 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 72.4 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 42.8 mi |
Rocky Reach | Wenatchee, WA | 4.8 TWh | 34.9 mi |
Ross | Rockport, WA | 405.1 GWh | 77.4 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 67.9 mi |
Summer Falls Power Plant | Coulee City, WA | 447.2 GWh | 40.7 mi |
Swauk Wind LLC | Thorp, WA | 6.0 GWh | 69.5 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 69.6 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 70.1 mi |
Wanapum | Beverly, WA | 4.0 TWh | 74.4 mi |
Wild Horse | Ellensburg, WA | 620.8 GWh | 64.9 mi |