WED Shun I, LLC
0 Shun Pike, Johnston, RI 2919Plant Summary Information
WED Shun I, LLC is ranked #36 out of 96 power plants in Rhode Island in terms of total annual net electricity generation.
WED Shun I, LLC generated 2.6 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | WED Shun I, LLC |
---|---|
Utility Name | WED Shun I, LLC |
Location | Providence County, RI |
Initial Operation Date | January 2019 |
Last Update | Jan 2025 |
Annual Generation | 6.7 GWh |
Annual Consumption | 25.0 k MMBtu |
Ranked #7,180 out of 11,979 Power Plants Nationwide | |
Ranked #1,174 out of 1,359 Wind Power Plants Nationwide | |
Ranked #36 out of 96 Rhode Island Power Plants | |
Ranked #4 out of 19 Rhode Island Wind Power Plants | |
Fuel Types | Wind |
Map of WED Shun I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for WED Shun I, LLC.
Monthly Net Generation for WED Shun I, LLC
WED Shun I, LLC Details
Summary Information | |
---|---|
Plant Name | WED Shun I, LLC (62110) |
Plant Address | 0 Shun Pike, Johnston, RI 2919 |
Utility | WED Shun I, LLC (61652) |
Latitude, Longitude | 41.79846, -71.54066 |
Generation Dates on File | Jan 2019 to Jan 2025 |
Initial Operation Date | January 2019 |
Annual Generation | 6.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-92-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | The Narragansett Electric Co (13214) RI |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator SHUN1 Details Operating January 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | VENSYS |
Predominant Turbine Model Number | VENSYS120 |
Design Wind Speed | 12 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 295.3 |
WED Shun I, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1164 | Springview | Springview, NE | 7.4 GWh |
#1165 | Redwood Falls Wind | Redwood Falls, MN | 7.4 GWh |
#1166 | Findlay Wind Farm | Findlay, OH | 7.2 GWh |
#1167 | Optimum Wind 3 LLC | Nevada, IA | 7.1 GWh |
#1168 | Seward Wind Farm | Seward, NE | 7.0 GWh |
#1169 | WED Coventry 6 | Coventry, RI | 6.9 GWh |
#1170 | Valfilm Wind Project | Findlay, OH | 6.9 GWh |
#1171 | Roseman | Anita, IA | 6.9 GWh |
#1172 | CCC Hastings Wind Turbine | Hastings, NE | 6.9 GWh |
#1173 | August Wind Farm | Clearfield, IA | 6.8 GWh |
#1175 | Salka Cabazon Wind | North Palm Springs, CA | 6.7 GWh |
#1176 | Birch | Clearfield, IA | 6.6 GWh |
#1177 | WED Green Hill, LLC | Johnston, RI | 6.6 GWh |
#1178 | Equity Industrial Turbines | Gloucester, MA | 6.6 GWh |
#1179 | Com Adam 1WF-1 | Sublette, IL | 6.5 GWh |
#1180 | WED Shun III, LLC | Johnston, RI | 6.4 GWh |
#1181 | Geneseo | Geneseo, IL | 8.0 GWh |
#1182 | Loess Hills | Rock Port, MO | 6.4 GWh |
#1183 | Madison Windpower LLC | Madison, NY | 6.3 GWh |
#1184 | Green Energy Machine | Anita, IA | 6.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding WED Shun I, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A Street 1 | Johnston, RI | 2.0 GWh | 0.3 mi |
A Street 2 | Johnston, RI | 2.9 GWh | 0.3 mi |
GD Glocester White Oak I, LLC | Glocester, RI | 2.5 GWh | 5.2 mi |
GD Johnson Scituate I, LLC | Cranston, RI | 5.8 GWh | 1.9 mi |
Gold Meadow Farms | Cranston, RI | 27.5 GWh | 4.4 mi |
Hope Farm Solar, LLC | Cranston, RI | 15.9 GWh | 3.6 mi |
Johnston LFG Turbine Plant | Johnston, RI | 191.7 GWh | 1 mi |
Johnston Solar | Town of Johnston, RI | 1.6 GWh | 1 mi |
Little Bay | Providence, RI | 1.5 GWh | 5.4 mi |
Orbit Energy RI | Johnston, RI | 3.7 GWh | 1.4 mi |
Pine Hill | Johnston, RI | 7.8 GWh | 1.9 mi |
Plainfield Pike | Johnston, RI | 3.7 GWh | 0.8 mi |
Rhode Island State Energy Center | Johnston, RI | 3.5 TWh | 1.2 mi |
Ridgewood Providence Power | Johnston, RI | 10.2 GWh | 0.8 mi |
WED Green Hill, LLC | Johnston, RI | 6.6 GWh | 0.6 mi |
WED Plainfield II, LLC | Johnston, RI | 5.9 GWh | 0.3 mi |
WED Plainfield III, LLC | Johnston, RI | 5.8 GWh | 0.6 mi |
WED Plainfield, LLC | Johnston, RI | 4.8 GWh | 0.3 mi |
WED Shun II, LLC | Johnston, RI | 6.1 GWh | 0.3 mi |
WED Shun III, LLC | Johnston, RI | 6.4 GWh | 0.4 mi |