Waverly Solar, LLC
29656 Sussex Drive, Waverly, VA 23890Plant Summary Information
Waverly Solar, LLC is ranked #40 out of 212 power plants in Virginia in terms of total annual net electricity generation.
Waverly Solar, LLC generated 59.0 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Waverly Solar, LLC |
---|---|
Utility Name | Waverly Solar, LLC |
Location | Sussex County, VA |
Initial Operation Date | December 2023 |
Last Update | Oct 2024 |
Annual Generation | 177.8 GWh |
Annual Consumption | 606.8 k MMBtu |
Ranked #2,460 out of 11,866 Power Plants Nationwide | |
Ranked #315 out of 5,672 Solar Power Plants Nationwide | |
Ranked #40 out of 212 Virginia Power Plants | |
Ranked #8 out of 96 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Waverly Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waverly Solar, LLC.
Monthly Net Generation for Waverly Solar, LLC
Waverly Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Waverly Solar, LLC (65225) |
Plant Address | 29656 Sussex Drive, Waverly, VA 23890 |
Utility | Waverly Solar, LLC (64547) |
Latitude, Longitude | 37.02078, -77.12265 |
Generation Dates on File | Jan 2024 to Oct 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 177.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | QF21-1076 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 115.00 kV / 34.50 kV |
Energy Storage | No |
Generator ENX17 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 118 MW |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 149.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Waverly Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#305 | Bell Ridge Solar | Trenton, FL | 186.1 GWh |
#306 | Playa Solar 1, LLC | North Las Vegas, NV | 185.6 GWh |
#307 | OETN1 | Obion, TN | 184.1 GWh |
#308 | Aulander Holloman Solar, LLC | Aulander, NC | 183.8 GWh |
#309 | Snipesville | Denton, GA | 180.6 GWh |
#310 | Sweetwater Solar | Green River, WY | 180.5 GWh |
#311 | Arche Energy Project, LLC | Fulton, OH | 180.3 GWh |
#312 | Lancaster Solar GA | Arlington, GA | 179.0 GWh |
#313 | Sadler Solar | Emporia, VA | 178.7 GWh |
#314 | Grand View Solar Two | Grand View, ID | 178.3 GWh |
#316 | Phobos Solar, LLC | Middlesex, NC | 177.8 GWh |
#317 | Harts Mill Solar, LLC | Tarboro, NC | 177.0 GWh |
#318 | High Point Solar LLC | Lena, IL | 176.8 GWh |
#319 | Fern Solar LLC | Battleboro, NC | 176.6 GWh |
#320 | Water Strider Solar | Nathalie, VA | 176.2 GWh |
#321 | MTSUN | Billings, MT | 175.8 GWh |
#322 | Fall River Solar, LLC | Edgemont, SD | 175.6 GWh |
#323 | Springfield Solar (WI) | Lomira, WI | 175.6 GWh |
#324 | Bay Ranch Solar Power Plant | Panama City, FL | 175.5 GWh |
#325 | BPL Crown Solar LLC | Chilton, TX | 174.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waverly Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boydton Plank Road Cogen Plant Hybrid | Petersburg, VA | 66.0 MWh | 22.4 mi |
Brasfield | Petersburg, VA | 6.8 GWh | 26.1 mi |
Caden Energix Rives Road LLC | Petersburg, VA | 28.0 GWh | 16.1 mi |
Cavalier Solar | Smithfield, VA | 145.7 GWh | 21.3 mi |
Colonial Trail West | Spring Grove, VA | 282.1 GWh | 14.6 mi |
Downtown | Franklin, VA | 232.0 MWh | 26 mi |
Fort Powhatan Solar | Disputanta, VA | 323.7 GWh | 16.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 25.6 mi |
Hopewell Cogeneration | Hopewell, VA | 1.8 TWh | 20.7 mi |
Hopewell Mill | Hopewell, VA | 282.6 GWh | 20.6 mi |
Hopewell Power Station | Hopewell, VA | 345.0 GWh | 21.1 mi |
International Paper Franklin Mill | Franklin, VA | 279.3 GWh | 26.2 mi |
Nottoway Diesel Generating Facility | Courtland, VA | 525.0 MWh | 22.4 mi |
Park 500 Philip Morris USA | Chester, VA | 13.8 GWh | 23.6 mi |
Philip Morris | Chester, VA | 2.2 GWh | 24 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 24.5 mi |
Southampton Power Station | Franklin, VA | 340.0 GWh | 26.4 mi |
Spring Grove I | Spring Grove, VA | 156.3 GWh | 15.4 mi |
Surry | Surry, VA | 13.7 TWh | 25.4 mi |
Sussex Drive, LLC | Stoney Creek, VA | 38.2 GWh | 17.2 mi |