Watson Cogeneration
22850 South Wilminton, Carson, CA 90749Plant Summary Information
Watson Cogeneration is ranked #20 out of 1,569 power plants in California in terms of total annual net electricity generation.
Watson Cogeneration is comprised of 6 generators and generated 594.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Watson Cogeneration |
---|---|
Utility Name | ARCO Products Co-Watson |
Location | Los Angeles County, CA |
Initial Operation Date | December 1987 |
Last Update | Aug 2024 |
Annual Generation | 2.4 TWh |
Annual Consumption | 33.8 M MMBtu |
Ranked #473 out of 11,835 Power Plants Nationwide | |
Ranked #325 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #20 out of 1,569 California Power Plants | |
Ranked #18 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas : 83.9% Other Gas : 15.7% |
Map of Watson Cogeneration
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Watson Cogeneration.
Monthly Net Generation for Watson Cogeneration
Watson Cogeneration Details
Summary Information | |
---|---|
Plant Name | Watson Cogeneration (50216) |
Plant Address | 22850 South Wilminton, Carson, CA 90749 |
Utility | ARCO Products Co-Watson (867) |
Latitude, Longitude | 33.81665, -118.24484 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | December 1987 |
Annual Generation | 2.4 TWh |
Fuel Types | Natural Gas : 83.9% Other Gas : 15.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 85-526-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Petroleum Refineries (32411) |
Sector | Industrial CHP (7) |
Water Source | Dominquez Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator GN94 Details Operating December 1987
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 68 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1987 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas / Waste/Other Oil |
Startup Source | Waste/Other Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / OG / WO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 82 MW |
Net Winter Capacity With Natural Gas | 82 MW |
Net Summer Capacity With Oil | 82 MW |
Net Winter Capacity With Oil | 82 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GN96 Details Operating December 1987
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 38.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1987 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Generator GN93 Details Operating January 1988
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 68 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1988 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas / Waste/Other Oil |
Startup Source | Waste/Other Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / OG / WO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 82 MW |
Net Winter Capacity With Natural Gas | 82 MW |
Net Summer Capacity With Oil | 82 MW |
Net Winter Capacity With Oil | 82 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GN92 Details Operating February 1988
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 68 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1988 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas / Waste/Other Oil |
Startup Source | Waste/Other Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / OG / WO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 82 MW |
Net Winter Capacity With Natural Gas | 82 MW |
Net Summer Capacity With Oil | 82 MW |
Net Winter Capacity With Oil | 82 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator GN95 Details Operating February 1988
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 38.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 1988 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Generator GN91 Details Operating March 1988
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | POD_ARCOGN_2_UNITS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | POD_ARCOGN_2_UNITS |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 68 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1988 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas / Waste/Other Oil |
Startup Source | Waste/Other Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / OG / WO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 82 MW |
Net Winter Capacity With Natural Gas | 82 MW |
Net Summer Capacity With Oil | 82 MW |
Net Winter Capacity With Oil | 82 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Watson Cogeneration Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN91 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN92 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN93 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN94 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN95 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN96 | 100.00% |
Tesoro SoCal Cogen LLC | 19100 Ridgewood Parkway, San Antonio, TX 78259 | Generator GN97 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#315 | Northside Generating Station | Jacksonville, FL | 3.0 TWh |
#316 | Louisiana 1 | Baton Rouge, LA | 2.8 TWh |
#317 | Sand Hill | Austin, TX | 2.1 TWh |
#318 | Hidalgo Energy Center | Edinburg, TX | 2.1 TWh |
#319 | Bayou Cogen Plant | Pasadena, TX | 2.3 TWh |
#320 | Coyote Springs | Boardman, OR | 2.0 TWh |
#321 | Midulla Generating Station | Bowling Green, FL | 2.0 TWh |
#322 | Moselle | Moselle, MS | 2.0 TWh |
#323 | Mint Farm Generating Station | Longview, WA | 2.0 TWh |
#324 | Frontera Energy Center | Mission, TX | 2.0 TWh |
#326 | Apache Station | Cochise, AZ | 2.2 TWh |
#327 | St Francis Energy Facility | Campbell, MO | 2.0 TWh |
#328 | TalenEnergy Montour | Washingtonville, PA | 2.4 TWh |
#329 | O W Sommers | San Antonio, TX | 1.9 TWh |
#330 | Cedar Bayou 4 | Eldon, TX | 1.9 TWh |
#331 | Jackson Generating Station | Jackson, MI | 1.9 TWh |
#332 | Sutter Energy Center | Yuba City, CA | 1.9 TWh |
#333 | Langley Gulch Power Plant | New Plymouth, ID | 1.9 TWh |
#334 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.8 TWh |
#335 | Sweeny Cogen Facility | Old Ocean, TX | 2.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Watson Cogeneration.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh | 3.8 mi |
Carson Cogeneration | Carson, CA | 34.8 GWh | 4.1 mi |
Colon PV | Wilmington, CA | 1.4 GWh | 1.7 mi |
Dominguez Plant | Long Beach, CA | 13.7 GWh | 1.9 mi |
Equilon Los Angeles Refining | Wilmington, CA | 320.1 GWh | 1.8 mi |
Francisco St. Solar | Torrance, CA | 1.8 GWh | 4.1 mi |
Harbor | Wilmington, CA | 163.1 GWh | 3.4 mi |
Harbor Cogen | Wilmington, CA | 25.6 GWh | 2.9 mi |
Kaiser - Harbor City | Harbor City, CA | 16.4 GWh | 3.5 mi |
KSR053 Cantara Fuel Cell | Panorama City, CA | 5.3 GWh | 3.4 mi |
Long Beach Generation LLC | Long Beach, CA | 10.1 GWh | 3.8 mi |
Los Angeles Harbor College | Wilmington, CA | 2.3 GWh | 3.3 mi |
Los Angeles Refinery Wilmington | Wilmington, CA | 387.9 GWh | 4.1 mi |
Signal Hill West Unit | Signal Hill, CA | 35.3 GWh | 4 mi |
Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 4 mi |
THUMS | Long Beach, CA | 342.8 GWh | 3.8 mi |
Total Energy Facilities | Carson, CA | 168.8 GWh | 4 mi |
Toyota Long Beach Trigen | Long Beach, CA | 5.1 GWh | 2.8 mi |
Valero Wilmington Cogeneration Plant | Wilmington, CA | 236.7 GWh | 2.6 mi |
Wilmington Hydrogen Plant | Wilmington, CA | 179.9 GWh | 2.5 mi |