1268 Poquonnock Rd, Groton, CT 6340Plant Summary Information
Water Treatment 1 & 2 is ranked #12 out of 21 distillate fuel oil power plants in Connecticut in terms of total annual net electricity generation.
Water Treatment 1 & 2 is comprised of 2 generators and generated 57.0 MWh during the 3-month period between May 2024 to August 2024.
Plant Name | Water Treatment 1 & 2 |
---|---|
Utility Name | Connecticut Mun Elec Engy Coop |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | October 2010 |
Last Update | Aug 2024 |
Annual Generation | 413.0 MWh |
Annual Consumption | 4.3 k MMBtu |
Ranked #11,082 out of 11,835 Power Plants Nationwide | |
Ranked #543 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #145 out of 156 Connecticut Power Plants | |
Ranked #12 out of 21 Connecticut Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Water Treatment 1 & 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Water Treatment 1 & 2.
Monthly Net Generation for Water Treatment 1 & 2
Water Treatment 1 & 2 Details
Summary Information | |
---|---|
Plant Name | Water Treatment 1 & 2 (57605) |
Plant Address | 1268 Poquonnock Rd, Groton, CT 6340 |
Utility | Connecticut Mun Elec Engy Coop (4180) |
Latitude, Longitude | 41.3469, -72.0411 |
Generation Dates on File | Jan 2011 to Aug 2024 |
Initial Operation Date | October 2010 |
Annual Generation | 413.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Groton Dept of Utilities - (CT) (7716) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator WT1 Details Operating October 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator WT2 Details Operating October 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Water Treatment 1 & 2 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#533 | GCWA | Texas City, TX | 433.0 MWh |
#534 | Godwin Drive Plant | Manassas, VA | 430.0 MWh |
#535 | Lost Nation | Groveton, NH | 428.0 MWh |
#536 | Long Creek Waste Water Plant | Dallas, NC | 428.0 MWh |
#537 | Ponton Diesel Generating Facility | Amelia, VA | 426.0 MWh |
#538 | Henrico | Glen Allen, VA | 7.3 GWh |
#539 | Iowa State University | Ames, IA | 86.8 GWh |
#540 | Niles RTO BTM | Niles, OH | 418.0 MWh |
#541 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
#542 | Northeast (MI) | Warren, MI | 1.8 GWh |
#544 | Frank Knutson | Commerce City, CO | 246.6 GWh |
#545 | Clewiston Sugar House | Clewiston, FL | 272.6 GWh |
#546 | Pleasant Valley (MN) | Dexter, MN | 104.1 GWh |
#547 | E C Gaston | Wilsonville, AL | 3.9 TWh |
#548 | Marshall Energy Facility | Calvert City, KY | 46.0 GWh |
#549 | Mead Coated Board | Mahrt, AL | 758.7 GWh |
#550 | Grundy Center City Light Plant | Grundy Center, IA | 388.1 MWh |
#551 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#552 | Crestwood Dothan | Dothan, AL | 386.0 MWh |
#553 | WestRock-West Point Mill | West Point, VA | 525.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Water Treatment 1 & 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.1 GWh | 11.1 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 2.4 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 3.9 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 3 mi |
Connecticut College | New London, CT | 8.1 GWh | 4 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.9 GWh | 9 mi |
Fishers Island 1 | Fisher's Island, NY | 119.0 MWh | 5.6 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 742.0 MWh | 9.1 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 9.7 mi |
Gary Court 1 & 2 | Groton, CT | 466.0 MWh | 1.3 mi |
Millstone | Waterford, CT | 16.3 TWh | 7 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 6.4 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 4.3 mi |
North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh | 11.7 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 1.8 mi |
Pfizer Groton Plant | Groton, CT | 69.4 GWh | 2.2 mi |
Rand Whitney CHP Plant | Montville, CT | 133.5 GWh | 8.8 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 4.3 mi |
White Rock Road LLC | Westerly, RI | 9.8 GWh | 11.1 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 3.4 mi |