Waste Management Piedmont LFGTE Project
9900 Freeman Road, Kernersville, NC 27284Plant Summary Information
Waste Management Piedmont LFGTE Project is ranked #12 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
Waste Management Piedmont LFGTE Project is comprised of 3 generators and generated 2.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Waste Management Piedmont LFGTE Project |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Forsyth County, NC |
Initial Operation Date | March 2011 |
Last Update | Dec 2023 |
Annual Generation | 10.0 GWh |
Annual Consumption | 141.0 k MMBtu |
Ranked #5,896 out of 11,835 Power Plants Nationwide | |
Ranked #224 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #211 out of 862 North Carolina Power Plants | |
Ranked #12 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Waste Management Piedmont LFGTE Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waste Management Piedmont LFGTE Project.
Monthly Net Generation for Waste Management Piedmont LFGTE Project
Waste Management Piedmont LFGTE Project Details
Summary Information | |
---|---|
Plant Name | Waste Management Piedmont LFGTE Project (57169) |
Plant Address | 9900 Freeman Road, Kernersville, NC 27284 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 36.19361, -80.04056 |
Generation Dates on File | Mar 2011 to Dec 2023 |
Initial Operation Date | March 2011 |
Annual Generation | 10.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 11-88-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating March 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | Duke |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Duke |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating March 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | Duke |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Duke |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating March 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | Duke |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Duke |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Waste Management Piedmont LFGTE Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Waste Management of Carolinas Inc | 1001 FanninSuite 4000, Houston, TX 77002 | Generator GEN1 | 100.00% |
Waste Management of Carolinas Inc | 1001 FanninSuite 4000, Houston, TX 77002 | Generator GEN2 | 100.00% |
Waste Management of Carolinas Inc | 1001 FanninSuite 4000, Houston, TX 77002 | Generator GEN3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#214 | Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh |
#215 | Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh |
#216 | Berlin Landfill Gas | Berlin, WI | 11.1 GWh |
#217 | Glades Pike Generation Plant | Somerset, PA | 11.1 GWh |
#218 | Onslow Power Producers | Jacksonville, NC | 10.9 GWh |
#219 | Front Range Project | Erie, CO | 10.9 GWh |
#220 | G2 Energy Hay Rd | Vacaville, CA | 10.8 GWh |
#221 | Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 10.7 GWh |
#222 | Clinton LFGTE | Clinton, IL | 10.6 GWh |
#223 | Ridgewood Providence Power | Johnston, RI | 10.2 GWh |
#225 | Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh |
#226 | Santa Cruz Energy | Santa Cruz, CA | 10.0 GWh |
#227 | MM Albany Energy | Albany, NY | 9.7 GWh |
#228 | MM Tulare Energy | Visalia, CA | 9.7 GWh |
#229 | Hernando | Brooksville, FL | 9.7 GWh |
#230 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 9.5 GWh |
#231 | Frederick County LFGTE Facility | Winchester, VA | 9.4 GWh |
#232 | Ameresco Johnson Canyon | Gonzales, CA | 9.3 GWh |
#233 | Adrian Energy Associates LLC | Adrian, MI | 9.3 GWh |
#234 | New River Clean Energy | Beckley, WV | 9.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waste Management Piedmont LFGTE Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Avalon Hydropower | Mayodan, NC | 4.0 GWh | 16.6 mi |
Belews Creek | Belews Creek, NC | 8.6 TWh | 6.1 mi |
Big Boy | Gibsonville, NC | 4.7 GWh | 24.1 mi |
Carol Jean Solar | Walnut Cove, NC | 7.1 GWh | 10.3 mi |
DE Solar 657 Brigham Rd | Greensboro, NC | 810.0 MWh | 7.3 mi |
Eastside WWTP | High Point, NC | 213.0 MWh | 18.8 mi |
Germantown Solar, LLC | Rural Hall, NC | 2.9 GWh | 12.5 mi |
High Point, Pump Station Rd | High Point, NC | 32.0 MWh | 15.2 mi |
Ingredion Winston Salem | Winston-Salem, NC | 62.4 GWh | 15.2 mi |
Lick Creek Solar, LLC | Walnut Cove, NC | 110.4 GWh | 7.9 mi |
Moore Solar Farm | Reidsville, NC | 7.9 GWh | 16.6 mi |
Moyer Solar | Stoneville, NC | 8.8 GWh | 17.3 mi |
Pilot Mountain Solar, LLC | King, NC | 10.2 GWh | 19.5 mi |
Rockingham County CT Station | Reidsville, NC | 1.3 TWh | 15 mi |
Salem Energy Systems LLC | Winston-Salem, NC | 25.9 GWh | 8 mi |
South Winston Farm, LLC | Winston-Salem, NC | 9.0 GWh | 18.5 mi |
Trinity Solar | Trinity, NC | 8.8 GWh | 23.2 mi |
Ward WTP | High Point, NC | 24.0 MWh | 16.1 mi |
Westside WWTP | Thomasville, NC | 30.0 MWh | 17.9 mi |
White Street Renewables | Greensboro, NC | 14.1 GWh | 18.7 mi |