Waste Management Northern Oaks LFGTE
513 North Country Farm Road, Harrison, MI 48625Plant Summary Information
Waste Management Northern Oaks LFGTE is ranked #21 out of 23 landfill gas power plants in Michigan in terms of total annual net electricity generation.
Waste Management Northern Oaks LFGTE is comprised of 1 generator and generated 1.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Waste Management Northern Oaks LFGTE |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Clare County, MI |
Initial Operation Date | November 2010 |
Last Update | Dec 2023 |
Annual Generation | 8.0 GWh |
Annual Consumption | 91.6 k MMBtu |
Ranked #6,642 out of 11,852 Power Plants Nationwide | |
Ranked #245 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #169 out of 256 Michigan Power Plants | |
Ranked #21 out of 23 Michigan Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Waste Management Northern Oaks LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waste Management Northern Oaks LFGTE.
Monthly Net Generation for Waste Management Northern Oaks LFGTE
Waste Management Northern Oaks LFGTE Details
Summary Information | |
---|---|
Plant Name | Waste Management Northern Oaks LFGTE (57024) |
Plant Address | 513 North Country Farm Road, Harrison, MI 48625 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 43.9906, -84.8003 |
Generation Dates on File | Nov 2010 to Dec 2023 |
Initial Operation Date | November 2010 |
Annual Generation | 8.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 10-675-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
Grid Voltage | 13.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating November 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Zonal |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Zonal |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Waste Management Northern Oaks LFGTE Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#235 | Ameresco Janesville | Janesville, WI | 9.0 GWh |
#236 | Hardin County LFGTE | Elizabethtown, KY | 8.9 GWh |
#237 | Norther Tier Landfill | Burlington, PA | 8.8 GWh |
#238 | G2 Energy Marion LLC | Ocala, FL | 8.7 GWh |
#239 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.6 GWh |
#240 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh |
#241 | Horry Land Fill Gas Site | Conway, SC | 8.4 GWh |
#242 | Terreva Wayne County RNG, LLC | Dudley, NC | 8.2 GWh |
#243 | MM Taunton Energy | Taunton, MA | 8.1 GWh |
#244 | Sonoma Central Landfill Phase I | Petaluma, CA | 8.1 GWh |
#246 | CII Methane Management IV, LLC | Smithfield, NC | 7.9 GWh |
#247 | Prairie Bluff | Houston, MS | 7.8 GWh |
#248 | Flathead Landfill to Gas Energy Facility | Kalispell, MT | 7.8 GWh |
#249 | White Street Renewables | Greensboro, NC | 14.1 GWh |
#250 | COC Surry LFG, LLC | Mount Airy, NC | 7.6 GWh |
#251 | Henrico | Glen Allen, VA | 7.3 GWh |
#252 | Sonoma Central Landfill Phase II | Petaluma, CA | 6.6 GWh |
#253 | Mas Durham Power, LLC | Durham, NC | 6.6 GWh |
#254 | Grand River | Grand Ledge, MI | 6.4 GWh |
#255 | Twin Bridges LFGTE | Danville, IN | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waste Management Northern Oaks LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cadillac Renewable Energy | Cadillac, MI | 130.9 GWh | 36.6 mi |
Cargill Salt Hersey | Hersey, MI | 318.2 MWh | 29.7 mi |
Central Michigan University | Mt. Pleasant, MI | 25.1 GWh | 27.7 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 51.4 mi |
George Johnson | Hersey, MI | 19.1 GWh | 32.9 mi |
Gratiot County Wind LLC | Breckenridge, MI | 228.1 GWh | 43.6 mi |
Gratiot Wind Park | Breckenridge, MI | 207.3 GWh | 41.3 mi |
Grayling Generating Station | Grayling, MI | 134.1 GWh | 42.8 mi |
Isabella Wind Park | Rosebush, MI | 861.8 GWh | 21.2 mi |
Meridian Wind Park | Merrill, MI | 464.8 GWh | 43.2 mi |
Midland Cogeneration Venture | Midland, MI | 10.8 TWh | 40.1 mi |
National Energy of McBain | McBain, MI | 136.0 GWh | 25.5 mi |
Pinconning White Feather | Pinconning, MI | 16.8 GWh | 42.8 mi |
Pine River Wind Park | Shepherd, MI | 340.4 GWh | 32.6 mi |
Rogers | Big Rapids, MI | 23.3 GWh | 42.8 mi |
St Louis | St. Louis, MI | 175.0 MWh | 41.9 mi |
Stoney Corners Wind Farm | McBain, MI | 109.8 GWh | 28.3 mi |
Vestaburg | Vestaburg, MI | 1.4 GWh | 41.1 mi |
Willford Solar, LLC | Gladwin, MI | 1.1 GWh | 13.8 mi |
Workman Road Solar Farm, LLC | Lake City, MI | 3.7 GWh | 28.3 mi |