Waste Management Middle Peninsula LFGTE
3714 Waste Management Way, Glenns, VA 23149Plant Summary Information
Waste Management Middle Peninsula LFGTE is ranked #31 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
Waste Management Middle Peninsula LFGTE is comprised of 8 generators and generated 12.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Waste Management Middle Peninsula LFGTE |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Middlesex County, VA |
Initial Operation Date | September 2009 |
Last Update | Dec 2023 |
Annual Generation | 50.0 GWh |
Annual Consumption | 605.3 k MMBtu |
Ranked #3,845 out of 11,835 Power Plants Nationwide | |
Ranked #31 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #78 out of 211 Virginia Power Plants | |
Ranked #4 out of 17 Virginia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Waste Management Middle Peninsula LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waste Management Middle Peninsula LFGTE.
Monthly Net Generation for Waste Management Middle Peninsula LFGTE
Waste Management Middle Peninsula LFGTE Details
Summary Information | |
---|---|
Plant Name | Waste Management Middle Peninsula LFGTE (57018) |
Plant Address | 3714 Waste Management Way, Glenns, VA 23149 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 37.51971, -76.62451 |
Generation Dates on File | Sep 2009 to Dec 2023 |
Initial Operation Date | September 2009 |
Annual Generation | 50.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 09-457-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 37.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN8 Details Operating September 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PNODE74008741 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNODE74008741 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Waste Management Middle Peninsula LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#21 | Georgia LFG Richland Creek Plant | Buford, GA | 62.8 GWh |
#22 | Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh |
#23 | Sumpter Energy Associates | Belleville, MI | 58.0 GWh |
#24 | Concord Energy | Concord, NC | 57.5 GWh |
#25 | Wake County LFG Facility | Apex, NC | 57.9 GWh |
#26 | Mill Seat Renewable Energy Facility | Bergen, NY | 52.9 GWh |
#27 | Coventry Clean Energy Corporation | Coventry, VT | 51.9 GWh |
#28 | Grand Blanc Generating Station | Grand Blanc, MI | 51.4 GWh |
#29 | King & Queen | Little Plymouth, VA | 53.8 GWh |
#30 | Charles City | Providence Forge, VA | 54.0 GWh |
#32 | Elk City Station | Bennington, NE | 48.7 GWh |
#33 | Dart Container Corp | Leola, PA | 47.9 GWh |
#34 | Calabasas Gas to Energy Facility | Agoura, CA | 47.4 GWh |
#35 | Clinton LFGTE Facility | Morrisonville, NY | 47.3 GWh |
#36 | Superior Landfill Gas Recovery | Savannah, GA | 46.9 GWh |
#37 | Blue Ridge Landfill | Chambersburg, PA | 45.9 GWh |
#38 | Cumberland County PA LFG Recovery | Shippensburg, PA | 45.8 GWh |
#39 | Zimmerman Energy | Argos, IN | 45.7 GWh |
#40 | Waste Management Rolling Meadows LFGTE | Topeka, KS | 45.4 GWh |
#41 | Turnkey Landfill Gas Recovery | Rochester, NH | 44.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waste Management Middle Peninsula LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Carvers Creek Solar | Gloucester, VA | 6.9 GWh | 3.1 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 28.2 mi |
Colonial Trail West | Spring Grove, VA | 282.3 GWh | 30.4 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 12.5 mi |
Energix Hollyfield, LLC | Manquin, VA | 25.5 GWh | 31.6 mi |
Essex Solar Center | Dunnsville, VA | 35.2 GWh | 23.7 mi |
Fort Powhatan Solar | Disputanta, VA | 320.2 GWh | 30.8 mi |
Gloucester Solar | Gloucester, VA | 37.5 GWh | 10.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 25.3 mi |
Hollyfield | Manquin, VA | 29.8 GWh | 31.7 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 12.8 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 13.5 mi |
Northern Neck | Warsaw, VA | 1.5 GWh | 30.1 mi |
Puller Solar | Topping, VA | 27.7 GWh | 9.3 mi |
Rappahannock Solar, LLC | White Stone, VA | 3.2 GWh | 16.3 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 13.9 mi |
Skipjack Solar Center | Wayside, VA | 353.6 GWh | 29.8 mi |
Spring Grove I | Spring Grove, VA | 155.4 GWh | 28.9 mi |
Surry | Surry, VA | 13.8 TWh | 24.8 mi |
WestRock-West Point Mill | West Point, VA | 525.4 GWh | 10 mi |