Waste Management Bethel LFGTE
100 North Park Lane, Hampton, VA 23666Plant Summary Information
Waste Management Bethel LFGTE is ranked #7 out of 17 landfill gas power plants in Virginia in terms of total annual net electricity generation.
Waste Management Bethel LFGTE is comprised of 6 generators and generated 9.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Waste Management Bethel LFGTE |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Hampton city, VA |
Initial Operation Date | February 2008 |
Last Update | Dec 2023 |
Annual Generation | 37.4 GWh |
Annual Consumption | 473.7 k MMBtu |
Ranked #4,259 out of 11,852 Power Plants Nationwide | |
Ranked #64 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #96 out of 212 Virginia Power Plants | |
Ranked #7 out of 17 Virginia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Waste Management Bethel LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waste Management Bethel LFGTE.
Monthly Net Generation for Waste Management Bethel LFGTE
Waste Management Bethel LFGTE Details
Summary Information | |
---|---|
Plant Name | Waste Management Bethel LFGTE (56531) |
Plant Address | 100 North Park Lane, Hampton, VA 23666 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 37.07635, -76.44437 |
Generation Dates on File | Feb 2008 to Dec 2023 |
Initial Operation Date | February 2008 |
Annual Generation | 37.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 07-71 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 35.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating February 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 53049067 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 53049067 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Waste Management Bethel LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#54 | CSL Gas Recovery | Pompano Beach, FL | 40.0 GWh |
#55 | MM West Covina | West Covina, CA | 39.9 GWh |
#56 | Coopersville | Coopersville, MI | 39.6 GWh |
#57 | Lakeview Gas Recovery | Erie, PA | 39.5 GWh |
#58 | Altamont Gas Recovery | Livermore, CA | 39.4 GWh |
#59 | West Camden | Camden, TN | 39.0 GWh |
#60 | Waste Management Arden LFGTE | Washington, PA | 38.7 GWh |
#61 | Trans-Jordan Generating Station | South Jordan, UT | 38.2 GWh |
#62 | Broad Mountain | Schuylkill, PA | 38.0 GWh |
#63 | Austin Gas Recovery | Austin, TX | 37.9 GWh |
#65 | Ridgeview | Whitelaw, WI | 37.1 GWh |
#66 | Uwharrie Mountain Renewable | Mt. Gilead, NC | 35.2 GWh |
#67 | Deertrack Park Gas Recovery | Watertown, WI | 35.1 GWh |
#68 | UNH 7.9 MW Plant | Durham, NH | 48.5 GWh |
#69 | Colonie LFGTE Facility | Cohoes, NY | 34.6 GWh |
#70 | Hyland LFGTE Facility | Angelica, NY | 34.1 GWh |
#71 | Marina Landfill Gas | Marina, CA | 34.0 GWh |
#72 | Modern Innovative Energy LLC | Youngstown, NY | 33.7 GWh |
#73 | LRI LFGTE Facility | Graham, WA | 33.6 GWh |
#74 | Springhill Gas Recovery Plant | Campbellton, FL | 32.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waste Management Bethel LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cavalier Solar | Smithfield, VA | 108.8 GWh | 16.6 mi |
Chesapeake | Chesapeake, VA | 178.0 MWh | 22.5 mi |
Chesapeake Solar Project | Chesapeake, VA | 180.5 GWh | 28.2 mi |
Colonial Trail West | Spring Grove, VA | 279.9 GWh | 25.6 mi |
Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh | 22.1 mi |
Gloucester Solar | Gloucester, VA | 37.5 GWh | 25.8 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 14.7 mi |
IKEA Norfolk Rooftop PV System | Norfolk, VA | 1.5 GWh | 19.3 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 27 mi |
Oceana Solar | Virginia Beach, VA | 29.0 GWh | 29.4 mi |
Pleasant Hill Solar | Suffolk, VA | 20.7 GWh | 27.6 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 25.7 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 19.5 mi |
Spring Grove I | Spring Grove, VA | 155.4 GWh | 27 mi |
Surry | Surry, VA | 13.8 TWh | 15.3 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 23.4 mi |
Virginia Beach | Virginia Beach, VA | 4.2 GWh | 24.1 mi |
Western Branch High School | Chesapeake, VA | 1.1 GWh | 15.9 mi |
Wheelabrator Portsmouth | Portsmouth, VA | 35.6 GWh | 20.1 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 15.8 mi |