Warner Lambert
2800 Plymouth Rd, Ann Arbor, MI 48105Plant Summary Information
Warner Lambert is ranked #41 out of 73 natural gas power plants in Michigan in terms of total annual net electricity generation.
Warner Lambert is comprised of 6 generators and generated 3.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Warner Lambert |
---|---|
Utility Name | University of Michigan NCampus Research |
Location | Washtenaw County, MI |
Initial Operation Date | August 1989 |
Last Update | Sep 2024 |
Annual Generation | 21.3 GWh |
Annual Consumption | 423.3 k MMBtu |
Ranked #4,996 out of 11,852 Power Plants Nationwide | |
Ranked #1,388 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #138 out of 256 Michigan Power Plants | |
Ranked #41 out of 73 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Warner Lambert
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Warner Lambert.
Monthly Net Generation for Warner Lambert
Warner Lambert Details
Summary Information | |
---|---|
Plant Name | Warner Lambert (54604) |
Plant Address | 2800 Plymouth Rd, Ann Arbor, MI 48105 |
Utility | University of Michigan NCampus Research (56478) |
Latitude, Longitude | 42.29933, -83.70532 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | August 1989 |
Annual Generation | 21.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 89-233-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Administrative and Support Services (561) |
Sector | Commercial CHP (5) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | DTE Electric Company (5109) MI |
Grid Voltage | 40.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | DTE GAS COMPANY |
Natural Gas Storage | No |
Generator 5164 Details Operating August 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1989 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 2.6 MW |
Net Winter Capacity With Natural Gas | 3.5 MW |
Net Summer Capacity With Oil | 2.6 MW |
Net Winter Capacity With Oil | 3.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator 016E Details Standby June 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | June 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 0550 Details Standby June 2002
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 085-1 Details Standby December 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | December 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 085-2 Details Standby December 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | December 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 800-1 Details Standby November 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | November 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Warner Lambert Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1378 | Kaweah Delta District Hospital | Visalia, CA | 21.6 GWh |
#1379 | Tinker | Oklahoma City, OK | 21.6 GWh |
#1380 | Anheuser Busch - Fairfield | Fairfield, CA | 21.6 GWh |
#1381 | Barre Peaker | Stanton, CA | 21.5 GWh |
#1382 | Naval Hospital Medical Center | San Diego, CA | 21.5 GWh |
#1383 | POET Biorefining - Fostoria | Fostoria, OH | 21.5 GWh |
#1384 | Bountiful City | Bountiful, UT | 21.4 GWh |
#1385 | Delray | Detroit, MI | 21.4 GWh |
#1386 | Alabama Pine Pulp | Perdue Hill, AL | 407.9 GWh |
#1387 | Peak Power 1 Cogen | New York, NY | 21.4 GWh |
#1389 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#1390 | POET Biorefining - Jewell | Jewell, IA | 21.3 GWh |
#1391 | Morgan Creek | Colorado City, TX | 73.6 GWh |
#1392 | UDR Glastonbury Fuel Cell | Glastonbury, CT | 21.1 GWh |
#1393 | CCCSD Wastewater Treatment Plnt | Martinez, CA | 21.0 GWh |
#1394 | Hutchinson Energy Center | Hutchinson, KS | 24.9 GWh |
#1395 | Bucksport Generation LLC | Bucksport, ME | 21.0 GWh |
#1396 | Welport Lease Project | McKittrick, CA | 20.7 GWh |
#1397 | EQX011 Duane Fuel Cell | Santa Clara, CA | 20.6 GWh |
#1398 | Badger Creek Limited | Bakersfield, CA | 20.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Warner Lambert.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cement City Solar, LLC | Cement City, MI | 32.1 GWh | 26.5 mi |
Corewell Health Dearborn Campus | Dearborn, MI | 30.0 MWh | 25.2 mi |
Dearborn Energy Center | Dearborn, MI | 251.9 GWh | 24.2 mi |
Dearborn Industrial Generation | Dearborn, MI | 5.7 TWh | 28.2 mi |
Domino Farms Solar | Ann Arbor, MI | 1.3 GWh | 2.1 mi |
East. Michigan Univ. Heating Plant | Ypsilanti, MI | 37.0 GWh | 5.2 mi |
French Landing Dam | Belleville, MI | 3.1 GWh | 14.8 mi |
GRS Arbor Hills | Northville, MI | 1.2 GWh | 10 mi |
Hancock | Commerce Twp, MI | 11.1 GWh | 21.9 mi |
Hendershot Solar, LLC | Tecumseh, MI | 3.8 GWh | 23.8 mi |
IKEA Canton Rooftop PV System | Canton, MI | 84.0 MWh | 14.2 mi |
Letts Creek Solar, LLC | Grass Lake, MI | 26.8 GWh | 22 mi |
O'Shea Solar Farm | Detroit, MI | 2.9 GWh | 26.4 mi |
Riverview Energy Systems | Riverview, MI | 28.3 GWh | 26.8 mi |
Slocum | Trenton, MI | 96.3 MWh | 29.3 mi |
Sumpter | Belleville, MI | 120.0 GWh | 12.7 mi |
Sumpter Energy Associates | Belleville, MI | 58.0 GWh | 17.1 mi |
Trenton Channel | Trenton, MI | 574.8 GWh | 29.5 mi |
University of Michigan | Ann Arbor, MI | 218.3 GWh | 2 mi |
Wyandotte | Wyandotte, MI | 85.0 MWh | 29.3 mi |