Wansley Combined Cycle
3461 Hollingsworth Ferry Road, Franklin, GA 30217Plant Summary Information
Wansley Combined Cycle is ranked #25 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Wansley Combined Cycle is comprised of 6 generators and generated 2.2 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Wansley Combined Cycle |
---|---|
Utility Name | Southern Power Co |
Location | Heard County, GA |
Initial Operation Date | June 2002 |
Last Update | Aug 2024 |
Annual Generation | 8.3 TWh |
Annual Consumption | 64.6 M MMBtu |
Ranked #93 out of 11,835 Power Plants Nationwide | |
Ranked #25 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 238 Georgia Power Plants | |
Ranked #3 out of 47 Georgia Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Wansley Combined Cycle
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wansley Combined Cycle.
Monthly Net Generation for Wansley Combined Cycle
Wansley Combined Cycle Details
Summary Information | |
---|---|
Plant Name | Wansley Combined Cycle (55965) |
Plant Address | 3461 Hollingsworth Ferry Road, Franklin, GA 30217 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 33.40639, -85.03699 |
Generation Dates on File | Jun 2002 to Aug 2024 |
Initial Operation Date | June 2002 |
Annual Generation | 8.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Chattahoochee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
Natural Gas Storage | No |
Generator CT6A Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G106 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 203.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176.8 MW |
Winter Capacity | 189.3 MW |
Minimum Load | 115 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT6B Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G106 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 203.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176.8 MW |
Winter Capacity | 189.3 MW |
Minimum Load | 115 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT7A Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G107 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 203.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 175.6 MW |
Winter Capacity | 187.4 MW |
Minimum Load | 115 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT7B Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G107 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 203.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 175.6 MW |
Winter Capacity | 187.4 MW |
Minimum Load | 115 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST6 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G106 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 213.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST7 Details Operating June 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G107 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 213.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Wansley Combined Cycle Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
#22 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#23 | Sanford | DeBary, FL | 8.4 TWh |
#24 | Hummel Station LLC | Shamokin Dam, PA | 8.4 TWh |
#26 | Seminole (FL) | Palatka, FL | 11.1 TWh |
#27 | McIntosh Combined Cycle Facility | Rincon, GA | 8.2 TWh |
#28 | Brunswick County Power Station | Freeman, VA | 7.9 TWh |
#29 | Port Washington Generating Station | Port Washington, WI | 7.9 TWh |
#30 | Fairless Energy Center | Fairless Hills, PA | 7.8 TWh |
#31 | Indeck Niles Energy Center | Niles, MI | 7.7 TWh |
#32 | Moxie Freedom Generation Plant | Salem Township, PA | 7.7 TWh |
#33 | Deer Park Energy Center | Deer Park, TX | 7.7 TWh |
#34 | Riviera | Riviera Beach, FL | 7.6 TWh |
#35 | Paradise | Drakesboro, KY | 7.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wansley Combined Cycle.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlanta Falcons Solar | Atlanta, GA | 1.1 GWh | 43.8 mi |
Camp Solar Plant | Woodbury, GA | 3.2 GWh | 41.8 mi |
Chattahoochee Energy Facility | Franklin, GA | 3.3 TWh | 0.1 mi |
Greenville | Greenville, GA | 1.4 GWh | 31.1 mi |
Harris Dam | Lineville, AL | 128.9 GWh | 35 mi |
Hawk Road Facility | Franklin, GA | 569.4 GWh | 4.2 mi |
Jack McDonough | Smyrna, GA | 18.3 TWh | 43.3 mi |
Kimberly-Clark Solar | LaGrange, GA | 2.7 GWh | 28.1 mi |
LaFayette Solar Farm | LaFayette, AL | 166.8 GWh | 41.9 mi |
MAS ASB Cogen Plant | Atlanta, GA | 39.2 GWh | 40.8 mi |
Meriwether Jackson | Machester, GA | 5.9 GWh | 43 mi |
Rockmart | Rockmart, GA | 5.5 GWh | 42 mi |
Sewell Creek Energy | Cedartown, GA | 425.2 GWh | 39.9 mi |
Tenaska Georgia Generation Facility | Franklin, GA | 214.0 GWh | 4.4 mi |
Troup RC50 | Pine Mountain, GA | 4.6 GWh | 36.9 mi |
Troup RC50 II | Pine Mountain, GA | 2.9 GWh | 36 mi |
Turnipseed Solar, LLC | Douglasville, GA | 5.2 GWh | 28.9 mi |
Wansley Unit 9 | Franklin, GA | 3.2 TWh | 0.2 mi |
West Point (GA) | West Point, GA | 198.7 GWh | 34.8 mi |
Yates | Newnan, GA | 2.2 TWh | 8.9 mi |