Wanapum

14353 Highway 243, Beverly, WA 99321

Plant Summary Information

Wanapum is ranked #8 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.

Wanapum is comprised of 10 generators and generated 1.2 TWh during the 3-month period between May 2024 to August 2024.

Plant NameWanapum
Utility NamePUD No 2 of Grant County
LocationGrant County, WA
Initial Operation DateJune 1963
Last Update Aug 2024
Annual Generation 3.9 TWh
Annual Consumption 14.9 M MMBtu
Ranked #285 out of 11,835 Power Plants Nationwide
Ranked #8 out of 1,371 Water Power Plants Nationwide
Ranked #5 out of 134 Washington Power Plants
Ranked #4 out of 70 Washington Water Power Plants
Fuel Types Water

Map of Wanapum

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wanapum.

Create Your Account Today

Monthly Net Generation for Wanapum

Wanapum Details

Summary Information
Plant NameWanapum (3888)
Plant Address14353 Highway 243, Beverly, WA 99321
UtilityPUD No 2 of Grant County (14624)
Latitude, Longitude46.8731, -119.9703
Generation Dates on FileJan 2001 to Aug 2024
Initial Operation DateJune 1963
Annual Generation 3.9 TWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityPublic Utility District No. 2 of Grant County, Washington (GCPD)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceColumbia River
Ash Impoundment
Transmission / Distribution OwnerPUD No 2 of Grant County (14624) WA
Grid Voltage 230.00 kV
Energy StorageNo

Generator 7A Details Operating April 2011

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2011
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 2A Details Operating December 2012

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2012
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 5A Details Operating February 2012

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2012
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M

Generator 1A Details Operating October 2013

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2013
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 10A Details Operating June 2014

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2014
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 9A Details Operating June 2015

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2015
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 6A Details Operating July 2016

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2016
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 3A Details Operating August 2017

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2017
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 8A Details Operating November 2018

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2018
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 4A Details Operating September 2020

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity122 MW
Nameplate Power Factor0.95
Summer Capacity122 MW
Winter Capacity122 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2020
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Wanapum Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#1Robert Moses NiagaraLewiston, NY15.8 TWh
#2Grand CouleeGrand Coulee, WA15.0 TWh
#3Chief JosephBridgeport, WA8.9 TWh
#4Robert Moses Power DamMassena, NY7.5 TWh
#5John DayRufus, OR6.9 TWh
#6The DallesThe Dalles, OR5.4 TWh
#7Rocky ReachWenatchee, WA4.8 TWh
#9Priest RapidsMattawa, WA3.7 TWh
#10McNaryUmatilla, OR3.6 TWh
#11BonnevilleCascade Locks, OR3.5 TWh
#12WellsPateros, WA3.4 TWh
#13BoundaryMetaline, WA3.1 TWh
#14Glen Canyon DamPage, AZ2.8 TWh
#15ShastaRedding, CA2.4 TWh
#16Edward C HyattOroville, CA2.4 TWh
#17Wilson DamMuscle Shoals, AL2.2 TWh
#18GarrisonRiverside, ND2.1 TWh
#19ConowingoDarlington, MD2.1 TWh
#20BrownleeCambridge, ID2.1 TWh
#21OahePierre, SD2.1 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Wanapum.

Plant NamePlant LocationAnnual GenerationDistance
Camas Solar ProjectEllensburg, WA10.3 GWh26.1 mi
ChandlerBenton City, WA50.7 GWh45.6 mi
Columbia Generating StationRichland, WA9.9 TWh41 mi
CowicheTieton, WA3.4 GWh38.4 mi
Horn Rapids Solar, Storage and TrainingRichland, WA6.6 GWh47.3 mi
Orchard Avenue 1Yakima, WA2.6 GWh38.6 mi
PEC HeadworksMoses Lake, WA18.7 GWh20.1 mi
Penstemon Solar ProjectEllensburg, WA10.4 GWh26.1 mi
Potholes East Canal 66.0Pasco, WA7.3 GWh48.2 mi
Priest RapidsMattawa, WA3.7 TWh16 mi
Quincy ChuteQuincy, WA33.8 GWh34.5 mi
Rock IslandWenatchee, WA2.0 TWh33.2 mi
Rocky ReachWenatchee, WA4.8 TWh48.1 mi
RozaYakima, WA54.5 GWh29.8 mi
Russell D SmithOthello, WA17.0 GWh41.6 mi
Sagebrush Power PartnersEllensburg, WA255.0 GWh38.3 mi
Swauk Wind LLCThorp, WA6.0 GWh41.2 mi
Urtica Solar ProjectEllensburg, WA11.4 GWh37.6 mi
Vantage Wind Energy LLCEllensburg, WA231.6 GWh11.5 mi
Wild HorseEllensburg, WA592.7 GWh15.8 mi