Wanapum
14353 Highway 243, Beverly, WA 99321Plant Summary Information
Wanapum is ranked #8 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Wanapum is comprised of 10 generators and generated 1.2 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Wanapum |
---|---|
Utility Name | PUD No 2 of Grant County |
Location | Grant County, WA |
Initial Operation Date | June 1963 |
Last Update | Aug 2024 |
Annual Generation | 3.9 TWh |
Annual Consumption | 14.9 M MMBtu |
Ranked #285 out of 11,835 Power Plants Nationwide | |
Ranked #8 out of 1,371 Water Power Plants Nationwide | |
Ranked #5 out of 134 Washington Power Plants | |
Ranked #4 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Wanapum
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wanapum.
Monthly Net Generation for Wanapum
Wanapum Details
Summary Information | |
---|---|
Plant Name | Wanapum (3888) |
Plant Address | 14353 Highway 243, Beverly, WA 99321 |
Utility | PUD No 2 of Grant County (14624) |
Latitude, Longitude | 46.8731, -119.9703 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | June 1963 |
Annual Generation | 3.9 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Utility District No. 2 of Grant County, Washington (GCPD) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | |
Transmission / Distribution Owner | PUD No 2 of Grant County (14624) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 7A Details Operating April 2011
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 2A Details Operating December 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 5A Details Operating February 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 1A Details Operating October 2013
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 10A Details Operating June 2014
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 9A Details Operating June 2015
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 6A Details Operating July 2016
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 3A Details Operating August 2017
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 8A Details Operating November 2018
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 4A Details Operating September 2020
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Wanapum Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 8.9 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.7 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Shasta | Redding, CA | 2.4 TWh |
#16 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Conowingo | Darlington, MD | 2.1 TWh |
#20 | Brownlee | Cambridge, ID | 2.1 TWh |
#21 | Oahe | Pierre, SD | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wanapum.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 26.1 mi |
Chandler | Benton City, WA | 50.7 GWh | 45.6 mi |
Columbia Generating Station | Richland, WA | 9.9 TWh | 41 mi |
Cowiche | Tieton, WA | 3.4 GWh | 38.4 mi |
Horn Rapids Solar, Storage and Training | Richland, WA | 6.6 GWh | 47.3 mi |
Orchard Avenue 1 | Yakima, WA | 2.6 GWh | 38.6 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 20.1 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 26.1 mi |
Potholes East Canal 66.0 | Pasco, WA | 7.3 GWh | 48.2 mi |
Priest Rapids | Mattawa, WA | 3.7 TWh | 16 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 34.5 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 33.2 mi |
Rocky Reach | Wenatchee, WA | 4.8 TWh | 48.1 mi |
Roza | Yakima, WA | 54.5 GWh | 29.8 mi |
Russell D Smith | Othello, WA | 17.0 GWh | 41.6 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 38.3 mi |
Swauk Wind LLC | Thorp, WA | 6.0 GWh | 41.2 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 37.6 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 11.5 mi |
Wild Horse | Ellensburg, WA | 592.7 GWh | 15.8 mi |