Walton 2 Solar Facility
352 York Road, Walton, KY 41094Plant Summary Information
Walton 2 Solar Facility is ranked #46 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Walton 2 Solar Facility generated 561.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Walton 2 Solar Facility |
---|---|
Utility Name | Duke Energy Kentucky Inc |
Location | Kenton County, KY |
Initial Operation Date | December 2017 |
Last Update | Dec 2023 |
Annual Generation | 3.1 GWh |
Annual Consumption | 11.1 k MMBtu |
Ranked #8,872 out of 11,835 Power Plants Nationwide | |
Ranked #3,755 out of 5,643 Solar Power Plants Nationwide | |
Ranked #46 out of 54 Kentucky Power Plants | |
Ranked #6 out of 11 Kentucky Solar Power Plants | |
Fuel Types | Solar |
Map of Walton 2 Solar Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walton 2 Solar Facility.
Monthly Net Generation for Walton 2 Solar Facility
Walton 2 Solar Facility Details
Summary Information | |
---|---|
Plant Name | Walton 2 Solar Facility (61312) |
Plant Address | 352 York Road, Walton, KY 41094 |
Utility | Duke Energy Kentucky Inc (55729) |
Latitude, Longitude | 38.85018, -84.59226 |
Generation Dates on File | Dec 2017 to Dec 2023 |
Initial Operation Date | December 2017 |
Annual Generation | 3.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Kentucky (19446) KY |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Walton 2 Solar Facility Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3745 | Kaiser Creek Solar (CSG) | Molalla, OR | 3.1 GWh |
#3746 | Kearsarge 100 Sohier Rd | Beverly, MA | 3.1 GWh |
#3747 | Hope Solar Farm LLC | Troy, NY | 3.1 GWh |
#3748 | Rail Trail | Great Barrington, MA | 3.1 GWh |
#3749 | Musgrave West Solar Farm | Aurora, NY | 3.1 GWh |
#3750 | Wallace | Wallace, NC | 3.1 GWh |
#3751 | Wareham MA 1 Community Solar | Wareham, MA | 3.1 GWh |
#3752 | Clifton Park Solar 2, LLC | Rexford, NY | 3.1 GWh |
#3753 | Washingtonville(CSG) | Washingtonville, NY | 3.1 GWh |
#3754 | Burritt Rd Community Solar Farm | Parma, NY | 3.1 GWh |
#3756 | Sutton Solar CSG | Sutton, MA | 3.1 GWh |
#3757 | McCarthy Solar | Blooming Grove, NY | 3.1 GWh |
#3758 | City of Hayward WWTP | Hayward, CA | 10.3 GWh |
#3759 | York Road Solar I, LLC | Kings Mountain, NC | 3.1 GWh |
#3760 | Radiance Solar 5 | Lancaster, CA | 3.1 GWh |
#3761 | Beulaville | Beulaville, NC | 3.1 GWh |
#3762 | Baltimore City D | Perryman, MD | 3.1 GWh |
#3763 | St. Charles Solar | St Charles Township, MN | 3.1 GWh |
#3764 | IA - City of Ames - Airport Road | Ames, IA | 3.1 GWh |
#3765 | Medford DPC Solar | Medford, WI | 3.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Walton 2 Solar Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 13 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 3.5 mi |
Brown County LFGTE Power Station | Georgetown, OH | 27.0 GWh | 37.2 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 241.0 GWh | 20.1 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 6.9 mi |
East Bend | Union, KY | 2.5 TWh | 14.4 mi |
East Campus Utility Plant | Cincinnati, OH | 212.7 MWh | 20.4 mi |
Ghent | Ghent, KY | 9.8 TWh | 24.8 mi |
Green City Recovery, LLC | Georgetown, KY | 1.7 GWh | 35 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 35 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 9.5 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh | 22.2 mi |
Markland | Florence, IN | 394.7 GWh | 20.6 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 22.9 mi |
Miami Fort | North Bend, OH | 4.8 TWh | 21.4 mi |
Nestlewood Solar | Hamersville, OH | 114.1 GWh | 31.4 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 20.6 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 12.8 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 22.9 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 0 mi |