Walters Solar (FLS 260) is ranked #252 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Walters Solar (FLS 260) generated 2.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Walters Solar (FLS 260) |
---|---|
Utility Name | Cypress Creek Renewables |
Location | Robeson County, NC |
Initial Operation Date | August 2015 |
Last Update | Dec 2023 |
Annual Generation | 9.2 GWh |
Annual Consumption | 32.8 k MMBtu |
Ranked #6,135 out of 11,835 Power Plants Nationwide | |
Ranked #1,690 out of 5,643 Solar Power Plants Nationwide | |
Ranked #326 out of 862 North Carolina Power Plants | |
Ranked #252 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Walters Solar (FLS 260) (2014 to 2017) Cypress Creek Renewables (2018 to 2023) |
Map of Walters Solar (FLS 260)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walters Solar (FLS 260).
Monthly Net Generation for Walters Solar (FLS 260)
Walters Solar (FLS 260) Details
Summary Information | |
---|---|
Plant Name | Walters Solar (FLS 260) (59603) |
Plant Address | 6485 Wiregrass Road, Orrum, NC 28369 |
Utility | Cypress Creek Renewables (61060) |
Latitude, Longitude | 34.49694, -79.04889 |
Generation Dates on File | Aug 2015 to Dec 2023 |
Initial Operation Date | August 2015 |
Annual Generation | 9.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-652-000 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 14-652-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator FLS1 Details Operating August 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Walters Solar (FLS 260) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1680 | Morgan Farm, LLC | Louisburg, NC | 9.2 GWh |
#1681 | OYA Robinson Road | Orleans, NY | 9.2 GWh |
#1682 | Lillington Solar | Lillington, NC | 9.2 GWh |
#1683 | Wadesboro Farm 3 | Wadesboro, NC | 9.2 GWh |
#1684 | Wellons Farm | Smithfield, NC | 9.2 GWh |
#1685 | Mocksville Farm | Mocksville, NC | 9.2 GWh |
#1686 | Nash 97 Solar, LLC | Middlesex, NC | 9.2 GWh |
#1687 | Bolton Farm | Warrenton, NC | 9.2 GWh |
#1688 | Davis Lane Solar, LLC | Edenton, NC | 9.2 GWh |
#1689 | Rock Farm | Rockingham, NC | 9.2 GWh |
#1691 | Sartell Holdco CSG | Sartell, MN | 9.2 GWh |
#1692 | Haley Solar | Allendale, SC | 9.2 GWh |
#1693 | Fisher Solar Farm - NC | Oakboro, NC | 9.2 GWh |
#1694 | Pecan PV1 | Cordova, NC | 9.2 GWh |
#1695 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.2 GWh |
#1696 | North Nash Farm, LLC | Castalia, NC | 9.2 GWh |
#1697 | Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 8.9 GWh |
#1698 | Bayboro Solar Farm | Alliance, NC | 9.2 GWh |
#1699 | Tiburon Holdings | Advance, NC | 9.2 GWh |
#1700 | Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 9.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Walters Solar (FLS 260).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acme Solar, LLC | Riegelwood, NC | 7.8 GWh | 12.3 mi |
Baltimore Church Solar, LLC | Fairmont, NC | 5.4 GWh | 6.3 mi |
Barker Solar, LLC | Lumberton, NC | 9.0 GWh | 11.8 mi |
Bladenboro Solar, LLC | Bladenboro, NC | 8.9 GWh | 13.6 mi |
Bo Biggs Solar | Lumberton, NC | 8.8 GWh | 8.1 mi |
Broadridge Solar, LLC | Lumberton, NC | 9.9 GWh | 5.5 mi |
Fairmont-FLS 100 | Fairmont, NC | 6.4 GWh | 4.9 mi |
Floyd Solar, LLC | Fairmont, NC | 9.5 GWh | 5 mi |
FLS Solar 170, LLC | Lumberton, NC | 3.4 GWh | 8.4 mi |
FLS Solar 200, LLC | Lumberton, NC | 6.4 GWh | 8.5 mi |
Graham Solar Center LLC | Fair Bluff, NC | 8.5 GWh | 13.1 mi |
Holly Swamp Solar, LLC | Lumberton, NC | 4.3 GWh | 12.4 mi |
Jersey Holdings | Lumberton, NC | 9.6 GWh | 4.7 mi |
Panda Solar NC 1, LLC | Fairmont, NC | 1.8 GWh | 4.8 mi |
Panda Solar NC 2, LLC | Fairmont, NC | 3.3 GWh | 4.5 mi |
Panda Solar NC 3, LLC | Lumberton, NC | 4.0 GWh | 9.6 mi |
Progress Solar II, LLC | Fairmont, NC | 5.4 GWh | 3.1 mi |
Stone Solar | Lumberton, NC | 9.8 GWh | 6 mi |
Turkey Branch Solar LLC | Fairmont, NC | 8.1 GWh | 3.7 mi |
W H Weatherspoon | Lumberton, NC | 104.0 MWh | 7.5 mi |